Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oregon was posted on June 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ITB - OR202 MP40.62 Birkenfeld Bridge Structural Inlay

Closed
S-73000-00010433State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract, titled "ITB - OR202 MP40.62 Birkenfeld Bridge Structural Inlay," is issued by the Oregon Department of Transportation to secure services related to bridge maintenance and repair. The scope includes concrete deck micro-milling and deep cut hydrodemolition, which are essential for removing deteriorated concrete and preparing surfaces for repairs. Additionally, the contractor will construct concrete structural overlays and install elastomeric nosing to enhance the durability and safety of the bridge. The project also involves adjusting manholes and catch basins to ensure proper drainage and infrastructure alignment, as well as grinding and inlaying bridge approaches to provide a smooth transition for vehicles. The solicitation was posted on June 12, 2024, with a response deadline of June 27, 2024. The contract value is estimated to range between $500,000 and $1,500,000, and it falls under NAICS code 238910, which pertains to concrete work. The project is located within Oregon and is managed by the Oregon Department of Transportation, a state-level agency. Interested parties can find additional details and submit their bids through the Oregon Buys website.

General Info

Place of Performance

OR, USA

Set-Aside

NONE

Documents

4

00010433 Attachment A - Plans

PDF, High priority: read this firstspecifications
High

OR202 MP40.62 Birkenfeld Bridge Structural Inlay - Special Provisions

DOCX, High priority: read this firstspecifications
High

S-73000-000010433 Attachment C - Bid Pricing Form

XLSX, High priority: read this firstspecifications
High

S-73000-00010433: OR202 MP40.62 Birkenfeld Bridge Structural Inlay

DOCX, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The purpose of this ITB is to establish a Contract to perform concrete deck micro-milling and deep cut hydrodemolition, construct concrete structural overlay and elastomeric nosing, adjust manhole and catch basin, and grind and inlay bridge approaches.

More opportunities from Oregon Department of Transportation

Same awarding agency

NAICS: 237310
SLED
OR18 Yamhill River Bridge Rail Repairs
Solicitation # S-73000-00015363
The Oregon Department of Transportation is soliciting bids for the repair of a damaged concrete bridge rail section on OR18 over the Yamhill River near Dayton. The project encompasses all labor, materials, and equipment necessary for the work, including mobilization, temporary work zone traffic control, pollution control, bridge removal, and specific concrete repairs. Technical requirements are governed by the 2024 Standard Specifications and detailed Special Provisions, which outline strict protocols for traffic management, environmental protection, and structural integrity. Detailed plans specify a precise sequence for the removal, preparation, and placement of concrete rail posts and repair mortar, with final acceptance contingent upon engineer approval of saturated surface dry conditions and production quality control testing. The contract will be awarded to a single responsive and responsible bidder offering the lowest total bid price. Bidders must submit all required certifications via the OregonBuys system, including attestations regarding non-discrimination, tax law compliance, and the implementation of a qualifying employee drug testing program. Performance is subject to liquidated damages of 300 dollars per calendar day for failure to meet the substantial completion date or for exceeding allowed lane closure limits. The project is located in Yamhill County, BOLI Region 3, and requires compliance with prevailing wage rates and specific insurance endorsements naming the State of Oregon and ODOT as additional insured.
Highway, Street, and Bridge Construction

POSTED

11 months ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS