This Solicitation opportunity from Louisiana was posted on April 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ITB - Storm Water Storge - Blue Green Corridors

Closed
4372State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 9 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 9 hours ago

DEADLINE

in 20 days

Documents

11

2025-02-13 BGC Phase 1 Submittal Drawings

PDF, High priority: read this firstsubmittal-drawings
High

2025-02-13 BGC Phase 1 Submittal Drawings

PDF, High priority: read this firstsubmittal-drawings
High

Addendum 1 to ITB 4372 - Storm Water Storage - Blue Green Corridors

PDF, High priority: read this firstamendment
High

Addendum 2 to ITB 4372 - Storm Water Storage - Blue Green Corridors

PDF, High priority: read this firstamendment
High

Blue and Green Corridors Stormwater Resilience Project - Phase 1 Instructions to Bidders

PDF, High priority: read this firstitb
High

HUD Compliance Provisions for Direct Grantee Construction and Professional Services Contracts

PDF, High priority: read this firstcompliance-provisions
High

Invitation to Bid 4372 - Storm Water Storage - Blue Green Corridors

PDF, High priority: read this firstitb
High

LA20250005 MOD1 Wage Determination for Heavy Construction in Louisiana

PDF, High priority: read this firstwage-determination
High

Project NDR003 Blue and Green Corridors Submittal Drawings

PDF, High priority: read this firstsubmittal-drawings
High

2025-02-13 BGC Phase 1 Submittal Drawings

PDF, Low priorityother
Low

2025-03-20_BGC_Phase 1_Revised IFB_Specifications.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jun 11, 2025 to May 21, 2025. The notice title changed. NAICS code removed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyLouisiana → City of New Orleans
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Storm water storage - Blue Green Corridors

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS