This Solicitation opportunity from Florida was posted on March 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ITQ#2026-301 Redland Substation Transformer Concrete Pad (Construction)

Closed
ITQ-2026-301State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238110
New
SLED
DCR-26-HCCC-0013 Temp Sally Port Staircase
Solicitation # B27000826
The Department of Corrections and Rehabilitation for the State of Hawaii is soliciting bids for the installation of temporary pedestrian access and security improvements at the HCCC Main site, specifically adjacent to the Punahele Building and medical container area. The project scope includes the installation of a concrete stair set, a concrete walkway, two pedestrian gates with fence modifications, a removable steel security plate with hardware, and a temporary rain cover or awning. The contractor is responsible for all labor, materials, equipment, and supervision, including mobilization, demolition, and final restoration and cleanup. All work must be performed in accordance with federal, State of Hawaii, County of Hawaii, OSHA, and industry standards, following the owner-provided layout markup. This is a lump sum bid solicitation with a response deadline of December 15, 2026. The contractor must provide a proposed schedule and clearly identify any assumptions, exclusions, and lead times. Required certifications include a general excise tax license from the State of Hawaii, a tax clearance certificate from the State and IRS, and a certificate of compliance from the Department of Labor and Industrial Relations. Payments are issued upon the submission of original invoices certifying that services were performed according to the contract. There is no specified set-aside status for this solicitation.
Department of Corrections and Rehabilitation

POSTED

about 17 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract calls for the construction of a reinforced concrete pad designed to support a 44 MVA power transformer within an existing electrical substation in Florida. This includes site preparation, excavation, formwork installation, rebar placement, concrete pouring, curing, and backfilling. The pad must satisfy heavy-load structural demands, accommodate embedded conduit systems, and integrate seamlessly with the existing substation grounding grid. Precision in layout, elevation, and anchoring is required to ensure the transformer's proper support and alignment, which is critical for long-term operational reliability and safety. All construction activities are to comply with relevant engineering drawings, ASTM standards, and substation safety procedures. Contractors are expected to work closely with utility personnel to maintain safety clearances and minimize disruption to ongoing substation operations. The project demands high-quality workmanship, rigorous inspection processes, and strict adherence to metrics concerning structural integrity, electrical grounding, and timely completion. Only qualified and appropriately licensed vendors will be considered for this solicitation issued by HPS Energy | Electric Services, with the submission deadline set for March 13, 2026. Contacts for the project include the Superintendent of Substations & System Protection and a Buyer Analyst, both accessible via provided email addresses and phone numbers.

General Info

Construct reinforced concrete pad for 44 MVA transformer, ensuring structural integrity, safety, and on-time completion.

Documents

5
PDF, High priority: read this first4 pages · permit-application
High
PDF, High priority: read this first17 pages · itq
High
DOCX, High priority: read this first59 pages · specifications
High
PDF, Low priority1 page · checklist
Low
JPG

Read all 5 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26_1130 – Martinsburg-PAOpen now, due in 3 days
  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 36 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → HPS Energy | Electric Services
Contacts2 people available
OfficeHomestead, FL, 33030, USA

Interested Companies (10)

Big D Engineeringhomestead, FL
Clean SpaceCoral Springs, FL
GD SuppliesDoral, FL

See All 10 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The project involves the construction of a reinforced concrete pad to support a 44 MVA power transformer within an existing electrical substation. This pad must be designed and constructed to meet heavy-load structural requirements, accommodate embedded conduit systems, and integrate with the existing substation ground grid. Precision in layout, elevation, and anchoring is critical to ensure the transformer is properly supported and aligned for long-term reliability and operational safety. Work will include site preparation, excavation, installation of formwork, rebar placement, concrete pouring, curing, and backfilling. All work must comply with applicable engineering drawings, ASTM standards, and substation safety protocols. Contractors must coordinate closely with utility personnel to adhere to safety clearances and minimize disruption to ongoing substation operations. Given the critical role of the transformer in power distribution, the project demands high-quality workmanship, rigorous inspection, and strict adherence to performance metrics related to structural integrity, electrical grounding, and on-time delivery. Only qualified vendors with appropriate licensing will be considered.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS