Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ITT 1070-2526-115 - FAS Upgrade, Vancouver, BC

Closed
BCITT_1070-2526-115International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the removal of old units and the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures anchored to existing concrete slabs. The installation includes two new NEMA 3R automatic transfer switches and requires comprehensive load bank testing for both units. The project is being issued as a firm-fixed-price task order under an 8(a) MACC IDIQ, with a magnitude estimate between $250,000 and $300,000 and a total period of performance of 270 calendar days from the notice to proceed. The award will be based solely on the lowest total evaluated price, though proposals will be evaluated on technical understanding, methodology, program implementation, and the ability to coordinate labor and materials given the constraints of working on an island. Contractors must comply with the Buy American Act, Davis-Bacon prevailing wage rates for Puerto Rico, and strict security protocols, including the signing of DHS non-disclosure agreements and potential PIV card issuance for personnel. Key administrative requirements include submitting payment requests via the Invoice Processing Platform with certified payroll, providing a project schedule within 15 days of the notice to proceed, and adhering to standard working hours of 7:30 am to 4:00 pm, Monday through Friday.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 20 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves the provision and installation of two 40-foot steel FLEXTAINER conex offices at the St. Thomas HSI Facility in the US Virgin Islands to support forensic science technicians. Each unit will be installed on a 3k PSI reinforced concrete slab and equipped with two split-system A/C units, a steel door with a Cypher lock, four security windows, R-11 insulation, vinyl flooring, LED lighting, and a 5-pound ABC fire extinguisher. The contractor is responsible for connecting the units to the nearest electrical circuit using 2-inch PVC or uPVC conduit and must adhere to NFPA 70 and International Building Code standards. The contract is a Firm-Fixed-Price task order issued under an 8(a) MACC IDIQ, with an estimated magnitude between $250,000 and $300,000. The period of performance is 364 calendar days from the Notice to Proceed, with a project schedule due within 15 days of that notice. Award is based on the lowest total evaluated price, considering technical approach, safety, and quality control. Key requirements include compliance with the Buy American Act, adherence to prevailing wage rates per determination VI20260001, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training for personnel. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 20 days
NAICS: 238210
New
SLED
Replace Switchgears at FRCE, Phase 1
Solicitation # N400857545551
Solicitation N400857545551, titled Replace Switchgears at FRCE, Phase 1, is a request for proposals for electrical infrastructure upgrades at Marine Corps Air Station Cherry Point, North Carolina. The project involves the demolition and replacement of seven electrical switchgear stations across Buildings 137 and 138, including the installation of new molded-case breaker switchgear with PM5500 power metering and the replacement of a 15kV switch and transformer in Building 138 with a new 6-way SF6 switch and 480V dry type transformer. The work requires reworking existing conduits and conductors and adhering to strict operational constraints, specifically that each switchboard replacement must be completed within a 72-hour power outage scheduled over a three-day holiday weekend. The estimated cost range for the project is between 1,000,000 and 5,000,000 dollars, with a completion timeline of 720 calendar days after award. The contract will be awarded based on the lowest price. Bidders must comply with the Buy American statute and EM 385-1-1 safety standards, particularly as Building 137 is classified as a hazardous area. Depending on the proposal value, bid, performance, and payment bonds may be required, with bid bonds mandatory for proposals exceeding 150,000 dollars. Key deliverables include a baseline construction schedule with monthly updates and a three-week look-ahead schedule. The project incorporates various FAR and DFARS clauses, including requirements for accelerated payments to small business subcontractors and restrictions on materials from specific regions. Proposals are due by September 10, 2026, and must be submitted via email to the designated Navy contacts.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in about 16 hours

AI Contract Overview

Show more

This contract opportunity concerns an Invitation to Tender (ITT) issued by BC Housing for the upgrade of the fire alarm system at 1025 Granville Street, Vancouver, BC. The procurement is conducted through a second-stage invitational process involving a select group of prequalified prime contractors invited to submit bids. These bidders include Moza Home Construction, Roco Build Construction, Olympic Projects, JLK Projects, All Round, Eggert Projects, and Dura Seal. The scope of work primarily involves installing a new fire alarm panel and detectors throughout the building, with work scheduled to commence in March 2026 and conclude by September 2026. Contractors are expected to mobilize within two weeks of receiving the contract award. The bidding process includes a mandatory site visit scheduled for January 29, 2026, which all invited prime contractors must attend to be eligible to submit a proposal; subcontractors and trades may attend optionally. Questions regarding the tender must be submitted by February 4, 2026, and any addenda will be issued by February 10, 2026. Final bid submissions must be electronically submitted via BC Bid by 2:00 pm PT on February 17, 2026. The timetable is tentative and subject to change, and bidders bear the responsibility to monitor BC Bid for any updates or addenda. Safety protocols require representatives attending the site visit to wear appropriate personal protective equipment. The contracting authority managing this procurement is Jocelan Blackwell from BC Housing, and all communications should be directed accordingly.

General Info

BC Housing seeks bids from prequalified contractors to upgrade fire alarms at 1025 Granville Street.

Agency

Government of Canada → BC Housing Management Commission

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → BC Housing Management Commission
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → BC Housing Management Commission
Office AddressN/A
Contacts
Jocelan BlackwellContracting Authority

Full Description

Show more
This ITT is an invitational solicitation run via one of BC Housing’s region-specific prequalified rosters for Prime Contractors. This second stage ITT has been posted publicly to enable Subcontractors and/or Trades who are interested in participating in the project to connect with the invited prequalified Bidders listed below.Only the invited, prequalified Bidders listed below may participate in the bidding process and attend the mandatory site visit.Prequalified Bidders: Moza Home Construction Roco Build Construction Olympic Projects JLK Projects All Round Eggert Projects Dura SealINVITATION TO TENDER (ITT)1070-2526-1151025 Granville FAS Upgrade1025 Granville St., Vancouver, BC V6Z 1L4 Issue Date of ITT:Thursday, January 22, 2026Site Visit Date and Time:Thursday, January 29, 2026 @ 1:00pmDeadline for Questions:Wednesday, February 4, 2026 @ 10:00 am PT. Questions submitted after this deadline will not receive a response.Deadline for Issuing Addenda:Tuesday, February 10, 2026Submission Deadline:Tuesday February 17, 2026 @ 2:00 pm PTThe ITT timetable is tentative only and may be changed by BC Housing at any time.MANDATORY INFORMATION MEETINGBidders must attend a site visit on the specified date and time below:Date: Thursday, January 29, 2026Time: 1:00 pmLocation of Site Meeting: 1025 Granville St. VancouverSubcontractor Attendance is Optional.Site visits begin promptly at the time, date and location specified above.A sign-in sheet will be provided, and all Bidders are required to sign in. Note that submissions will only be reviewed for those Bidders who have attended and signed the sign-in sheet. No exceptions to this will be permitted.All questions and enquiries from the site visit must be submitted to the ITT Contact person prior to the date and time as per section 3.2 Timetable.Representatives of your firm attending a site visit must provide and wear appropriate Personal Protective Equipment.Brief Description of WorkThe work consists of upgrading the fire alarm system as further set out at Appendices:Appendix E – Specifications and DrawingsWork consists of upgrading the existing fire alarm system. This includes a new fire panel and detectors throughout the building.Work to begin in March 2026 and complete by September 2026.Contractor to mobilize 2 weeks after notice of award.This is a public solicitation issued through BC Bid. It is the bidder’s responsibility to obtain all addenda issued by checking BC Bid.Your bid MUST be submitted using the following method: (select the appropriate method)BC BidProposals can be submitted electronically through BC Bid at www.bcbid.ca. For assistance using BC Bid, please visit BC Bid at www.bcbid.ca to review the FAQs and tutorial available under the “Supplier” section or call the BC Bid Help Desk at 250-387-7301 (Victoria, BC).

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS