Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Veterans Affairs was posted on April 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J059--Medical Air Equipment

Closed
36C24126Q0449Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 11 hours ago

DEADLINE

in 4 days

General Info

Agency

Department Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)View Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

West Haven VAMC, West Haven, ME, 06516

Set-Aside

NONE

Documents

(1)

36C24126Q0449.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)
Contacts1 person available
OfficeTOGUS, ME, 04330, USA
Organization / Agency
Department Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)
View Agency Profile
Office AddressTOGUS, ME, 04330, USA
Contacts
Tnauri WoodbridgeContracting Officer

Full Description

Show more
VA Connecticut Healthcare System Replace Medical Air Equipment Page 2 of 2
Combined Synopsis Solicitation West Haven VAMC Replacement Medical Air Dryer equipment (i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) The solicitation number is 36C24126Q0449 and the solicitation is issued as a request for quotation (RFQ). (iii) A statement that the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-05. (iv) This requirement is being issued as a VOSB/SDVOSB set-aside. The associated NAICS 238210 and small business size standard is $16.5 million. (v) The Government intends to award a firm-fixed price award for Replacement Medical Air Dryer equipment at West Haven VAMC. Please see the attached Performance Work Statement for full requirement details. Please complete the Price Schedule below and submit with the quote submission. (vi) The Contractor shall provide all resources necessary to provide Replacement Medical Air Dryer equipment IAW the attached (PerformancevWork Statement). Please see the attached PWS for full requirement details. (vii) The Place of Performance is West Haven VAMC as described per the (Performance Work Statement). (viii) Provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition in addition to the following addenda s to the provision: 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998); 52.204-7 System for Award Management (OCT 2018); 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016); 52.217-5 Evaluation of Options (JUL 1990); 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008) (ix) Provision at 52.212-2, Evaluation -- Commercial Items, applies to this requirement. Site Visit: A mandatory pre-bid site visit is required. Bidders shall perform a pre-bid walkthrough at 8:30 a.m. on May 04, 2026 at VA Medical Center West Haven located at 950 Campbell Avenue, West Haven, CT 06516. Meet at Building 15 and obtain a temporary day badge and complete a sign-in sheet. Submission of Quotes: (1) Quotes shall be received on or before the date and time specified in Section (xv) of this solicitation. Note: Offers received after the due date and time shall not be considered. (2) Offerors shall submit their quotes electronically via email to tnauri.woodbridge@va.gov. (3) Quote Format: The submission should be clearly indexed and logically assembled in order of the evaluation criteria below. All pages of the quote shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. Evaluation Process: Award shall be made to the best value, as determined to be the most beneficial to the Government. Please read each section below carefully for the submittals and information required as part of the evaluation. Failure to provide the requested information below shall be considered non-compliant and your quote could be removed from the evaluation process. Offeror quotes shall be evaluated under FAR Part 13.106-2(b) -- Evaluation of Quotations or Offers. Therefore, the Government is not obligated to determine a competitive range, conduct discussions with all contractors, solicit final revised quotes, and use other techniques associated with FAR Part 15. The Government shall award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation shall be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:  Price (Follow these instructions): Offeror shall complete Attachment 1 - Price Schedule, with offerors proposed contract line item prices inserted in appropriate spaces.  Past Performance: Offeror shall utilize Attachment 2 Past Performance Worksheet to provide at least one (1) but no more than (3) references of work, similar in scope and size with the requirement detailed in the (Performance Work Statement). References may be checked by the Contracting Officer to ensure your company is capable of performing the Statement of Work.  The Government also reserves the right to obtain information for use in the evaluation of past performance from any and all sources. Technical: The offeror s quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services IAW the (Performance Work Statement) in a timely efficient manner.  Contractor shall demonstrate their corporate experience and approach to meet all requirements stated in the (Performance Work Statement). Contractor shall demonstrate that their technicians meet the qualification standards stated in the (Performance Work Statement). If you are planning to sub-contract some or all of this work, please provide the name and address(s) of all subcontractor(s) (if applicable) and a description of their planned subcontracting effort. SAM: Interested parties shall be registered in System for Award Management (SAM) as prescribed in FAR Clause 52.232-33. SAM information can be obtained by accessing the internet at www.sam.gov or by calling 1-866-606-8220. Interested parties not registered in SAM in sufficient time to meet the VA s requirement will be ineligible to receive a government contract. This determination will be at the discretion of the Contracting Officer. VISTA: The VA utilizes VISTA to issue a purchase order and liquidate invoices. Failure to register in VISTA may result in exclusion from the issuance of a VA contract. This determination will be at the discretion of the Contracting Officer. Interested parties with no prior VA contracts can request a Form 10091 at any time. (x) Please include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with your offer via the SAM.gov website or a written copy. (xi) Clause 52.212-4, Contract Terms and Conditions -- Commercial Items (OCT 2018), applies to this acquisition in addition to the following addenda s to the clause: 52.204-16 Commercial and Government Entity Code Maintenance (JUL 2016); 52.219-6 Notice of Total Small Business Set-Aside; 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013); 852.203-70 Commercial Advertising (MAY 2008); 852.232-72 Electronic Submission of Payment Requests (NOV 2018) Subcontracting Commitments - Monitoring and Compliance This solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments. (xiii) All contract requirement(s) and/or terms and conditions are stated above. (xiv) The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this requirement. (xv) RFQ responses are due May 6, 2026 by 10:00 AM EST. RFQ responses must be submitted via email to: tnauri.woodbridge@va.gov. Hand deliveries shall not be accepted. (xvi) The POC of this solicitation is Tnauri.Woodbridge@va.gov)




ATTACHMENT 1 PRICE SCHEDULE ITEM NUMBER DESCRIPTION OF SERVICES QUANTITY UNIT UNIT PRICE AMOUNT Base Replacement Medical Air Dryer equipment 1.00 JB __________________ __________________




GRAND TOTAL __________________








ATTACHMENT 2 PAST PERFORMANCE WORKSHEET 1. Name of Contracting Activity, Government Agency, Commercial Firm or other Organization: 2. Contracting Activity Address: 3. Contract Number: 4. Date of Contract Award: 5. Beginning Date of Contract: 6. Completion Date of Contract: 7. Contract Value: 8. Type of Contract: 9a. Technical Point of Contact: 9b. Contracting Point of Contact: Name: Name: Title: Title: Address: Address: Telephone: Telephone: Email: Email: 10. Place of Performance: 11. Description of Work (Use a continuation sheet if necessary): 12. List any commendations or awards received: 13. List of Major Subcontractors:


ATTACHMENT 3 STATEMENT OF WORK MEDICAL AIR DRYER EQUIPMENT REPLACEMENT BACKGROUND VA Connecticut Healthcare System has experienced a failure in Medical Air Dryer equipment servicing the Operating Room Suite and SICU. Replacement Medical Air Dryer equipment is required to restore permanent Medical Air Service to critical patient care areas. Temporary rental equipment is currently in place and shall be coordinated for removal at the time of planned installation of permanent equipment.
JUSTIFICATION The replacement of Medical Air Dryer equipment is required to ensure that compressed air used in healthcare settings maintains purity by preventing bacterial growth in medical air pipes and the safety of medical air and respiratory devices, anesthesia delivery, and surgical tools equipment operation in accordance with NFPA 99.
PLACE OF PERFORMANCE The place of performance for this contract is VA Connecticut Healthcare System, West Haven VA Medical Center located at 950 Campbell Avenue; West Haven, CT 06516.
PERIOD OF PERFORMANCE The Contract Time Period of Performance will be 90 calendar days upon contract award and Notice to Proceed (NTP) and includes contractor closeout.
QUALIFICATIONS To be considered eligible for consideration, potential bidders shall have a field service representative located within 200 miles of the West Haven Campuses of the VA Connecticut Healthcare System and have been trained by the Original Equipment Manufacturer (OEM) on the specific model of equipment that he/she is being asked to provide services for.
Licensed Medical Gas Installer meeting ASSE 6030 Medical Gas Systems Verifier Certification.
Bidders must provide upon request, documentation of factory certified service/maintenance training on the specific equipment under the terms of this contract. The Contracting Officer and/or Contracting Officer s Representative (COR) specifically reserve the right to reject any of the Contractor s personnel and refuse them permission to work on the equipment outlined herein, based upon credentials provided.
The Contracting Officer (CO) and/or Contracting Officer s Representative (COR) specifically reserve the right to reject any of the Service Provider s personnel and refuse them permission to work on the equipment outlined herein, based upon credentials provided.
Bidders shall be evaluated on past performance, technical capability, and financial capability to perform this work.
SCOPE OF WORK The scope of this work includes all supervision, labor, tools, and equipment to correct deficiencies outlined below.
Work shall occur outside of regular business hours; weekdays 4:30 p.m. midnight and/or weekend days Saturday and/or Sunday 7:00 a.m. 4:30 p.m. or as coordinated.
No work shall be performed on Federal Holidays unless an emergency status has been indicated by the Contracting Officer.
US Federal Holidays:
New Year s Day Martin Luther King Jr. Day President s Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
Description of Services
The manufacturer procedures take precedence over other recommended installation and operation procedures.
Coordinate all placement and removal of Lockout Tagout devices for any energy sources with the VA COR/Maintenance & Operations.
Coordinate all utility tie-ins with Facilities Management Services.
Electrical connections shall be designed and installed in conformance with NEC. Each dryer shall have an independent power supply with dedicated disconnect. Include labeling.
Furnish and install two (2) Medical Grade Air Dryers systems with purge control, 45SCFM in Building 1, 5th Floor Mechanical Room. System shall comply with NFPA 99 and ISO 8573 class 1 or better for Medical Air. Each unit shall be rated for continuous duty. Size for peak demand at 130 CFM minimum. Configured for redundancy N+1 capability. Maintain isolation valves for each unit. Bypass piping to maintain continuous service. Mandatory independent control systems including: Dedicated PLC or microprocessor controller per unit. Independent start up controls. Dew point monitoring. Regeneration cycle timing. Alarms processing. No shared control logic or dependency by the VA Medical Center. High dewpoint alarm. Dryer failure alarm. Power failure indicator. Standalone operation. Alarms shall be local panel mounted and integrated with the building automation system.
Furnish and install flex line and fittings required for installation.
Protect all equipment in place during replacement activities.
Perform post installation inspections, testing, and certification of the medical gas system as required by NFPA 99.
Furnish on site training of new equipment for a minimum of two (2) hours for VA Connecticut Healthcare Facilities Management Staff.
SUBMITTALS/DELIVERABLES Service provider shall furnish all submittal item documentation (with final dispositions) and final documentation report with all tests, photos, and correction of deficiencies within 14 business days following the completion of work.
Service provider shall furnish all material certifications for any replacement parts used.
Service provider shall furnish a waste manifest as required.
Minimum warranty of one year on all parts, labor, workmanship, and equipment shall be furnished.
SPECIAL INSTRUCTIONS Service Provider Check-in: All employees of the service provider shall comply with VA Security Management Program and obtain permission of the VA Police and restricted from unauthorized access. Upon arrival, the Service Provider shall sign-in at Building 15 in West Haven and receive a temporary identification badge prior to performing services at VA Connecticut Healthcare System. The Service Provider shall wear visible identification always displaying the name and company ID while on site. All site visits shall be coordinated with the VA COR or assigned POC.
Per Directive 1805, smoking, vaping, and smokeless tobacco are prohibited on the grounds of VA facilities, including in vehicles. This Directive applies to all Service providers and their employees.
No photography of VA premises is allowed without written permission of the contracting officer. Patients and staff are not to be photographed at any time.
Parking for Service provider and employees shall be in designated areas only. Service provider shall coordinate with VA COR.
The Service provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer. The Service provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer. The Service provider shall hold and save the government, its officers, and agents, free and harmless from liability of any nature occasioned by the Service provider s performance. Working space and space available for storing materials shall be as determined by the COR. Workers are subject to the rules of the Medical Center applicable to their conduct. Execute work in such a manner as to reduce impacts with work being done by others.
Billing: Provide COR with a report or statement of work completed and include statements with request for payment. Statement should include service completed and the date each service item was completed. Labor charges shall be billed hurly, and any unused labor totals will be credited back to the VA Medical Center on the next billing cycle, upon receipt of the service report.
NARA Records Management Requirements
The following standard items relate to records generated in executing this contract:
Citations to pertinent laws, codes and regulations such as 44 U.S.C. Chapter 21, 29, 31, and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.
Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.
Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.
Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.
The Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.
The Government Agency owns the rights to all data/records produced as part of this contract.
The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.
The Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].
No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.
The Contractor is required to obtain the Contracting Officer s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.

More opportunities from Department Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)

Same awarding agency

NAICS: 333310
New
Federal
Pacific Floor Care-Floor Scrubbers/Vacuum COMBINED SYNOPSIS/SOLICITATION–FAR 19.502-2(a) SB SET-ASIDE -BRAND NAME
Solicitation # 36C24126Q0821
Solicitation 36C24126Q0821 is a brand-name request for quote issued by the Department of Veterans Affairs Network Contracting Office 1 to provide industrial-grade floor care equipment for the Manchester VA Medical Center. This procurement is a total small business set-aside under NAICS code 333310, specifically targeting the acquisition of Pacific Floor Care equipment to standardize cleaning operations in patient-care corridors and high-traffic areas. The required equipment includes two 28-inch disk scrubbers with lead-acid batteries, two QS-12 walk-behind scrubbers, and eight V15ED upright dual-motor vacuums. All units must be delivered fully assembled and tested, accompanied by necessary accessories such as pads, chargers, and safety labels, as well as required documentation including safety data sheets and battery maintenance guides. The contract is awarded to the responsible service-disabled veteran-owned small business that meets all technical specifications and offers the lowest evaluated price. Performance is structured across five tasks, with delivery required within 30 days of award, installation and training within 45 days, and final inspection and acceptance within 50 days. Acceptance is contingent upon successful functional tests and an operational simulation in a patient-area corridor. The equipment must adhere to Environmental Management Service cleanliness standards and include specific safety features such as BatteryShield motor-disable protection. Quotes are due by September 18, 2026, and must be submitted electronically to the designated contracting officials.
Commercial and Service Industry Machinery Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 339113
New
Federal
STERIS InnoWave Irrigator
Solicitation # 36C24126Q0765
The Department of Veterans Affairs, through the Network Contracting Office 01, is soliciting quotes for the procurement of one STERIS InnoWave PCF Sonic Irrigator for the Sterile Processing Services Department at the Manchester VA Medical Center in New Hampshire. This combined synopsis and solicitation is a small business set-aside under NAICS code 339113. The requirement is justified as a single-source procurement from Steris Corporation due to compatibility with existing workflows and infrastructure, though the equipment may be acquired through small business distributors. The scope of work includes the delivery, installation, and operational verification of the unit, as well as the deinstallation and disposal of the existing inoperable ultrasonic cleaner and all associated packaging materials. The contractor must provide onsite operational training for staff covering maintenance, safety, and troubleshooting. Delivery is required no later than 45 days after receipt of order, with full installation and verification completed within 90 calendar days of the award. Award decisions will be based on price, past performance, and speed of delivery. Interested offerors must submit their quotes by September 21, 2026, including their Unique Entity Identifier and a statement of agreement with the solicitation terms. All services and equipment must be delivered and accepted at the Manchester VA Medical Center.
Surgical Appliance and Supplies Manufacturing

POSTED

1 day ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS