Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Jack and Bore Installation for Sewer Force Main

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract requires the installation of 60 linear feet of 3-inch sewer force main beneath NC 214 Green Swamp Rd using the jack and bore method, a technique designed to minimize surface disruption while installing underground utilities. This scope includes setting up launch and reception pits, installing necessary valves, and completing all related backfilling and restoration work to ensure compliance with engineering and safety standards. The work must be executed with precision to avoid interference with existing infrastructure and to meet environmental and regulatory requirements for sewer line installation. The solicitation, issued under NAICS code 237110 for sewer and water line construction, is classified as a subcontract with a response deadline of September 3, 2026. It is managed by the Columbus County Board of Education in North Carolina, with no specific set-aside provisions indicated. The project location is designated as Green Swamp Road, though exact municipal or state details are not provided in the contract data, and all work must be performed in accordance with applicable state and local codes. Interested parties must submit proposals by the stated deadline to be considered for award.

General Info

Install 60 linear feet of 3-inch sewer force main beneath NC 214 via jack and bore by September 3, 2026.

Agency

North Carolina → Columbus County Board of EducationView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

NC, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNorth Carolina → Columbus County Board of Education
ContactsNo contacts available
OfficeN/A
Organization / Agency
North Carolina → Columbus County Board of Education
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install 60 linear feet of 3-inch sewer force main using jack and bore method under NC 214 Green Swamp Rd, including pit setup, valve installation, and backfilling.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is forecasting the restoration of a 1947 water main located along the northbound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build procurement model. The project aims to preserve the integrity of the aging infrastructure without excavation, leveraging modern rehabilitation methods to extend service life and enhance system reliability. The work will involve lining the existing pipeline with a resin-saturated fabric liner that is inverted and cured in place, minimizing disruption to adjacent roadways and surrounding facilities. The contract falls under NAICS code 237110, indicating it is classified as Water and Sewer Line and Related Structures Construction. Moraa Omwega serves as the primary point of contact for inquiries, with Ray Moreno designated as Project Manager. The solicitation was posted on July 31, 2026, and while no set-aside designation or bid deadline has been specified, interested parties are directed to the official Port of Seattle portal for updates and detailed technical requirements. The place of performance is tied to the Airport Expressway, although exact geographic coordinates are not provided, and all work must be coordinated with ongoing airport operations to ensure safety and minimize impact to airfield access and logistics.
Aviation Project Management Group

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237110
New
SLED
Bid #EAJA2627-1 Locate and Identify Water Service Lines
Solicitation # Bid #EAJA2627-1
The Ephrata Area Joint Authority is soliciting sealed bids for the locating and identifying of approximately 1,000 existing water service lines through excavation, material identification, documentation, and full restoration of all disturbed areas, under Bid #EAJA2627-1. Bids must be submitted electronically via the PennBid platform by 10:00 AM local time on Thursday, August 27, 2026, with bid results publicly displayed immediately after the online opening. All contract documents are available free of charge on the same platform, and any questions must be submitted in writing through PennBid no later than 12:00 PM on Wednesday, August 19, 2026. Each bid must include a bid bond equal to 10 percent of the total base bid, secured by certified check, letter of credit, or other acceptable form, and no bid may be withdrawn for 60 calendar days after the submission deadline unless permitted by law. The contractor is required to provide performance and payment bonds, comply with the Pennsylvania Prevailing Wage Act, adhere to Federal OSHA safety standards, and meet the requirements of PA Act 127 by submitting E-Verify enrollment verification for all employees and subcontractors prior to work commencement. The authority will award the contract to the lowest responsive and responsible bidder, reserving the right to reject any or all bids. All employment practices must comply with non-discrimination laws, including the Pennsylvania Human Relations Act, prohibiting discrimination based on race, color, creed, disability, religion, age, sex, or national origin. The work will be performed in Lancaster County, Pennsylvania, and compliance with all regulatory and contractual conditions is mandatory for contract award and execution.
Lancaster County

POSTED

1 day ago

DEADLINE

in 25 days
View Details
NAICS: 237110
New
SLED
Waterline Replacement – West Main St & Cold Storage Rd.
Solicitation # Bloomfield Borough Water Authority, Perry County
The Bloomfield Borough Water Authority is seeking bids for the replacement and extension of approximately 2,100 linear feet of 8-inch ductile iron water main along West Main Street and Cold Storage Road in Bloomfield Borough and Centre Township, Perry County, Pennsylvania, including all necessary appurtenances and site restoration. Bids must be submitted electronically through PennBid by 1 PM on Wednesday, September 9, 2026, and will be publicly opened on Tuesday, September 15, 2026, at 5 PM local time at the Authority’s building in New Bloomfield. All bidding documents are available exclusively through the PennBid website, and prospective bidders are required to register as plan holders to receive updates, addenda, and official communications; no responsibility is accepted for documents obtained from unauthorized sources. A pre-bid conference is scheduled for August 19, 2026, at the Bloomfield Borough Building, though attendance is optional. Bids must remain valid for at least 60 days after opening, extending to 120 days if award delays occur due to governmental approvals, bond requirements, or grant processing. Awards will be made only to responsible bidders evaluated on integrity, past performance, financial and technical capacity, and compliance with public policy, with the Authority retaining the right to reject any or all bids and waive irregularities as it deems in its best interest.
Perry County

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

More opportunities from North Carolina → Columbus County Board of Education

Same awarding agency

NAICS: 237110
SLED
Eastview School Off-Site Sewer Force Main Installation
Solicitation # 171-171-26-202
Columbus County Board of Education is soliciting sealed proposals for the installation of a 1,960 linear foot, 3-inch sewer force main extending from East View Pre K-8 School to the Town of Bolton’s sewer collection station, with work to be performed in Columbus County, North Carolina. The project involves excavation, trenching, pipe installation using SDR-21 PVC with steel casing, boring, backfilling, erosion control, and full site restoration, all in strict compliance with the 2024 NCDOT Standard Specifications for Roads and Structures, as well as North Carolina Administrative Code 15A NCAC 02T for wastewater systems. All work must conform to the attached plans, specifications, and special conditions, with final acceptance contingent upon successful inspection by NCDOT and formal certification by the NCDEQ Division of Water Resources, including submission of as-built drawings and engineering certifications signed by a licensed North Carolina Professional Engineer. The solicitation, numbered 171-171-26-202, was posted on July 20, 2026, with proposals due by September 3, 2026, and award anticipated by September 9, 2026. Performance is expected to begin in fall 2026 and conclude by December 31, 2026, with a total estimated contract value of $15,000, broken down into lump sum traffic control costs and linear foot pricing for jack-and-bore installation. Submission must include the Scope of Work, Plans, Specifications, Bid Form, Insurance Requirements, General and Special Conditions, and any Addenda, delivered via email or physical mail to Columbus County Schools. Compliance with Title 49 CFR Part 21 for nondiscrimination and adherence to Wastewater Permit WQ0047335 are mandatory, and contractors must indemnify NCDOT against damages. NCDOT retains approval authority over all work within its right-of-way, requires a preconstruction meeting at least three business days prior to mobilization, and enforces a 24-hour emergency contact during construction. Bonding is waived for work on NCDOT right-of-way, though a one-year post-completion inspection is required for final release. No federal FAR clauses apply, as the procurement follows state and local regulatory frameworks, and while socioeconomic certifications and UEI/CAGE codes are not required, all participants must operate under the terms of
Water and Sewer Line and Related Structures Construction

POSTED

13 days ago

DEADLINE

in about 1 month
View Details