This Solicitation opportunity from Garney Pacific, Inc. was posted on September 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

JCSD Intervalley Pipeline Project in CA

Closed
jcsd-intervalley-pipeline-project-ca

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including mechanical and electrical systems, a generator, odor control equipment, new gravity sewers, manholes, and necessary site work such as stormwater facilities and fencing. The contract is based on EJCDC standard forms and will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A, to be considered responsive. The project requires strict adherence to quality standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Performance and payment bonds, along with proof of insurance, are required upon contract execution. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses and various SBA-certified categories, with specific MBE and WBE participation goals established by the EPA and the State of North Carolina.
Don Moorhead Construction, Inc.

POSTED

about 11 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of associated appurtenances such as trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities. Additionally, the project encompasses the construction of flow control facility components, site improvements, pavement removal and restoration, traffic control, and the final disinfection, startup, and commissioning of the pipeline system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for this project, with a response deadline of September 18, 2026, at 2:00 PM PT. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, though the final decision to bond subcontractors remains at the discretion of Garney. The solicitation is open to various set-aside categories, including DBE, MBE, WBE, and SBE. Primary contact for the project is Alyssa Callaway.

General Info

Garney Pacific seeks union subcontractors for a 3.3-mile water pipeline project in Fontana.

Documents

1

JCSD Intervalley Pipeline Project - Advertisement and Bid Solicitation

PDF, High priority: read this firstspecial-notice
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGarney Pacific, Inc.
Contacts1 person available
OfficeN/A
Organization / AgencyGarney Pacific, Inc.
Office AddressN/A

Full Description

Show more
Project consist of furnishing, installing, testing and making operational 3.3 miles (or approx.17,ooo LF) of 42- inch cement mortar lined and coated steel potable water transmission pipeline and associated appurtenances, which include, but are not limited to; trenchless crossings; air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities.

More opportunities from Garney Pacific, Inc.

Same awarding agency

NAICS: 237110
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility in CA
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-ca
The Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility project in California, owned by the Eastern Municipal Water District, aims to recharge the San Jacinto groundwater basin using a blend of recycled and advanced treated water. The scope of work includes comprehensive civil and site work, the construction of a process building, and the installation of underground utilities and process piping. Key technical components involve the installation of advanced membrane treatment equipment, specifically Ultrafiltration and Reverse Osmosis systems, as well as the development of brine ponds featuring site preparation, lined evaporation ponds, and all necessary mechanical, electrical, instrumentation, and control systems to ensure a fully operational facility. Garney Pacific, Inc. is seeking qualified DBE, MBE, WBE, and SBE subcontractors for this effort, with quotes due by October 20, 2026, at 10:00 AM PT. Mandatory requirements for subcontractors include the use of union labor and the provision of a current DBE certification from an approved entity, such as the SBA or DOT. Additionally, subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of bid for reimbursement. Those intending to further subcontract any portion of their scope must document their compliance with the first five steps of the Six Good Faith Efforts.
Water and Sewer Line and Related Structures Construction

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility in CA
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-ca-0
The Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility project, located in San Jacinto, California, is being executed for the Eastern Municipal Water District. The primary objective of the project is to recharge the San Jacinto groundwater basin using a blend of recycled and advanced treated water. The comprehensive scope of work includes civil and site work, the construction of a process building, and the installation of underground utilities and process piping. Technical requirements focus on the installation of advanced membrane treatment equipment, specifically Ultrafiltration and Reverse Osmosis systems, as well as the development of brine ponds involving site preparation, civil improvements, and the installation of lined evaporation ponds. The project concludes with final testing and startup to deliver a fully operational water treatment facility. Garney Pacific, Inc. is seeking qualified subcontractors for this effort, with a specific emphasis on DBE, MBE, WBE, and SBE certified firms. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, for which Garney will reimburse the bond premium. Bidders must submit their bond rate and current DBE certification from an approved issuing body, such as the SBA or DOT, by the deadline of November 17, 2026. Additionally, any subcontractors intending to further subcontract portions of their scope must document their compliance with the Six Good Faith Efforts as outlined in the project requirements.
Water and Sewer Line and Related Structures Construction

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS