This Solicitation opportunity from Utah was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
JH27-113 Turpin and Dour Miller Water Control Structures for Farmingtion Bay WMA
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation JH27-113 is an Invitation for Bids issued by the State of Utah Division of Purchasing on behalf of the Division of Wildlife Resources for improvements to the Miller and Turpin Units at the Farmington Bay Waterfowl Management Area. The project requires a contractor to provide all labor, equipment, and materials to perform mobilization, site preparation, and construction activities. Key deliverables include the supply and installation of one precast concrete water control structure, the installation of an existing water control structure, and the installation of 36-inch and 60-inch HDPE piping, along with associated earthwork and erosion control. The anticipated contract length is up to three months, with a final completion date of October 30, 2026. A mandatory site visit was required for bid eligibility, and the contract will be awarded to the lowest cost responsive and responsible vendor. While initial documents mentioned bonding, a subsequent amendment removed the requirements for bid, payment, and performance bonds. Vendors must guarantee their pricing for the project duration and maintain specific insurance coverages, including Workers Compensation and Commercial General Liability with limits of 1 million dollars per occurrence and 3 million dollars aggregate. All bids must be submitted electronically via the U3P portal, and vendors must certify compliance with anti-boycott regulations regarding the State of Israel.
General Info
Agency
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The purpose of this IFB is to enter into a contract to provide: provide one (1) water control structure & install an existing water control structure; both for Farmington Bay WMA
Mandatory Site Visit: YES - A MANDATORY SITE VISIT will be made on September 24th, 2026, at 10:00 AM. We will be meeting between 1-3 hours. Attendees will meet at the Farmington Bay Waterfowl Management Area (WMA) 1325 W. Glover Ln, Farmington, UT. (Use this link for the where for where you'll meet to start the Mandatory Site Visit - https://maps.app.goo.gl/YD5KDDKMJS2x8bFk7)
It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor.
Length of Contract: up to three (3) months.
Vendor must guarantee its pricing for the completion of the project.
More opportunities from Utah
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
