Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 8, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Johnson Running Track Repair

Closed
FA3016-20-R-0036Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Cartwright AML Project; 408.26.10.006
Solicitation # SRC000464
The State of North Dakota, through the North Dakota Public Service Commission's Abandoned Mine Lands Division, is soliciting proposals under solicitation SRC000464 for professional engineering and construction services to permanently close and stabilize an abandoned underground coal mine portal near Cartwright, North Dakota. The scope of work encompasses a full project lifecycle, including site investigations of geological and hydrological conditions, the development of engineering designs and technical specifications, execution of excavation and sealing activities, and final site reclamation through grading and revegetation. The contract includes a two-year post-construction warranty and maintenance period. The overall period of performance is expected to run from approximately December 1, 2026, through December 31, 2029, with a specific construction window scheduled between June 1 and August 31, 2027. Award decisions will be based on a 100-point scale, with technical proposals weighted at 80 points and cost proposals at 20 points; technical submissions must score at least 40 points to be considered responsive. Successful offerors must provide performance and payment bonds equal to 100 percent of the contract amount and provide proof of insurance satisfactory to the North Dakota Risk Management Division. Compliance with the Davis-Bacon Act for wage determinations and Buy America preferences for incorporated materials is mandatory. Proposals must be submitted via NDBuys as separate technical and cost documents by the November 17, 2026, deadline.

POSTED

about 16 hours ago

DEADLINE

in 28 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

JBSA Ft Sam Houston, TX, 78234, USA

Set-Aside

WOSB

Documents

12

FA301620R0036 - Repair of Johnson Running Track

PDF, High priority: read this first48 pages · ifb
High

FA301620R0036 Section L - Instructions to Offerors

PDF, High priority: read this firstrfp
High

JBSA203617 - Repair Johnson Running Track Cost Estimate Breakdown

ZIP, High priority: read this first48 pages · specifications
High

Lackland AFB Climatology Report (2018-2019)

PDF, High priority: read this first2 pages · specifications
High

Repair Johnson Running Track - Submittal Register

XLSX, High priority: read this first10 pages · specifications
High

ATTACHMENT+1+-+SOW+-+SPECIFICATIONS.pdf

PDF301 pages

ATTACHMENT+2+-+Drawings.pdf

PDF3 pages

ATTACHMENT+3+Wage+Determination+TX20200007+3Jan20.pdf

PDF5 pages

ATTACHMENT+4+-+DD+1354+Aug+2013.pdf

PDF

ATTACHMENT+9+-+Section+M+Evaluation+Factors.pdf

PDF4 pages

RFI+Responses.pdf

PDF4 pages

RFI+Responses+pt2.pdf

PDF3 pages

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline changed from May 6, 2020 to Jun 17, 2020. The point of contact changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA

Full Description

Show more
The scope of this project is to Repair the running track by full depth replacement the existing rubberized running Track and installation of new rubberized surface to include striping.Correct improper surface drainage in the grass areas that is abutting the running track, to approximately a max distance of 5 feet from edge, by grading these areas to allow for drainage away from the track. The project will have a Base Bid with two bid options that shall be added to the project if approved and authorized by the Contracting Officer as shown on drawing sheet provided C-101

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

New
Federal
DCF3 PROJECTION SYSTEM
Solicitation # A070977
The Department of Defense, specifically the 502 Cons Cl under the Office of the Air Force, is issuing a sources-sought Request for Information (RFI) for the DCF3 Projection System, solicitation number A070977. The objective is to identify capable providers for the installation of standalone audio-visual (AV) classroom equipment in sixteen classrooms at the BMT DCF3 (Building 9270) located at JBSA-Lackland, Texas. The scope of work includes providing all personnel, equipment, and materials to install laser projectors, zoom lenses, lecterns, scaling switchers, and associated cabling. The system must operate as a standalone solution and is strictly prohibited from interfacing with the Air Force network. Key deliverables include the integration of Apple Government-Furnished Equipment, the provision of technical documentation, and the delivery of user training for staff. Technical requirements specify that projectors and extension columns must be Trade Agreement Act (TAA) compliant, and touch panels must be FCC Class A certified. The contractor is responsible for ensuring high video resolution and sound quality, with final acceptance based on a post-installation walkthrough and inspection at the project site. Security requirements are stringent, requiring criminal history checks and background investigations for all personnel accessing the base, as well as strict adherence to Force Protection Condition procedures and a total prohibition of weapons on site. This RFI is strictly voluntary and is not a formal solicitation for quotes; interested parties must submit their capabilities and open-market pricing via email to Tommie Low by October 27, 2026, at 10 a.m. CST.

POSTED

about 22 hours ago

DEADLINE

in 7 days
View Details
NAICS: 811310
New
Federal
Aviation Support Equipment Load Testing
Solicitation # F2MT2M6146AQ01
This Sources Sought Notice, solicitation number F2MT2M6146AQ01, is a market research effort to identify qualified sources capable of providing aviation support equipment load testing and maintenance for the 433rd MXS/AMXS at Joint Base San Antonio-Lackland, Texas. The scope of work involves non-personal services including annual preventive maintenance inspections, load tests, certification, and both scheduled and unscheduled repairs to ensure the safe operation of aircraft support equipment. All services must adhere to OSHA Standards 1910 and 1926, ANSI Standards B30.16 and B30-5, and applicable Air Force Instructions and Technical Orders. Key deliverables include an initial annual preventive maintenance schedule, certification reports due within two workdays of completion, and repair estimates provided within 48 hours of an initial survey. Performance requirements specify that standard preventive maintenance must be completed and equipment returned within 48 hours of pickup, while approved repairs must be returned within three business days. Interested vendors must submit their response, including company details, CAGE code, and a statement of capability with product literature, to Dalwyn Corporan-Polanco by 10:00 AM CDT on October 20, 2026. This notice is for research purposes only and does not constitute a solicitation or a promise to issue one.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

5 days ago

DEADLINE

in about 5 hours
View Details
NAICS: 238220
New
Federal
Brand Name or Equal - WaterFurnace Model: UBH015R for B3631 & B3635 - Turnkey Replacement
Solicitation # A070764SS
The 502d Contracting Squadron is conducting market research via a Sources Sought Synopsis to identify capable industry sources for the turnkey removal and replacement of 48 ceiling-suspended Dedicated Outside Air System Water-Source Heat Pumps at the JBSA Ft Sam Houston San Antonio Military Medical Center Dormitory Annex, specifically in buildings B3631 and B3635. The project is projected as a Firm-Fixed Priced Purchase Order under NAICS code 238220. The contractor must provide all personnel, equipment, and supervision to install units that meet strict technical specifications, including a 1.25-ton capacity, horizontal ceiling-plenum configuration, and the use of low-GWP refrigerants such as R-454B or R-32, as R-410A is strictly prohibited. A critical requirement is that replacement units must fit through existing access openings measuring approximately 3 feet 11.5 inches by 2 feet to avoid structural demolition. The scope of work includes the integration of the units into the central Building Automation System via BACnet IP/MSTP and the use of AHR/ISO 13256-1 certified water-to-refrigerant coaxial heat exchangers. Performance must be completed within 275 days of award. Interested respondents must provide company identification, SAM.gov certifications, and confirmation that technicians hold EPA Section 608 Universal Certifications. Small business prime contractors must also verify they can cover at least 51 percent of the contract cost with their own personnel. Responses are due by October 26, 2026, and must be submitted in PDF format with a maximum length of ten pages, excluding equipment cut sheets.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS