Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on June 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

JOINT ELECTRONIC DATA ACQUISITION INTERFACE (JEDAI)

Closed
FA823226RB015Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, potholing, geotechnical and geophysical investigations, LIDAR surveying, BIM/3D modeling, and environmental assessment and compliance. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. The solicitation specifically encourages participation from certified Disadvantaged Business Enterprises, including MBE, WBE, and OBE firms. Interested bidders must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a bid deadline of September 11, 2026. To be considered responsive, firms must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the bond premiums. Kiewit is a signatory to several collective bargaining agreements and requires bidders to demonstrate an ability to maintain labor harmony on the project. Plans and specifications are available for review at Kiewit's Costa Mesa, California office, and further inquiries should be directed to Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 9 hours ago

DEADLINE

in 18 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 9 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The Air Force Life Cycle Management Center plans to award a sole-source Indefinite Delivery/Indefinite Quantity contract to General Electric Aerospace for the development, qualification, testing, and sustainment of the Joint Electronic Data Acquisition Interface Line Replaceable Unit, which will replace the aging Crash Survivable Flight Data Recorder system across the entire F-16C/D Block 30/32/40/42/50/52 fleet. The current CSFDR systems suffer from high failure rates, obsolete components, and an inability to support repairs, leading to significant impacts on aircraft availability and mission readiness. This initiative aims to standardize the fleet’s data recording system, eliminate spare parts shortages, improve reliability, and reduce long-term sustainment costs, with an estimated total contract value of $40.4 million. The effort is being conducted as a sole-source procurement because General Electric Aerospace is the original equipment manufacturer and retains exclusive possession of the proprietary technical data, drawings, and software required to execute the redesign—data the government does not have access to nor has been offered rights to. Market research, including past Sources Sought notices and technical evaluations of competing vendors, confirmed that no alternative supplier can meet the stringent requirements for Size, Weight, and Power, cybersecurity, and system integration without causing unacceptable delays of at least eight years and incurring over $40 million in duplicated costs. Two potential vendors responded to the 2025 outreach, but both proposals were deemed technically inadequate by government engineering review. The procurement is justified under 10 U.S.C. 3204(a)(1) and the Revolutionary FAR Overhaul, as only GE Aerospace possesses the proprietary knowledge and intellectual property needed to fulfill the requirement. While the contract is not being competed, the government is inviting all responsible sources to submit capability statements by July 5, 2026, to demonstrate they can meet the requirements without the prohibitive cost and schedule impacts identified, though no change to the sole-source intent is anticipated. The contract will be managed out of Hill Air Force Base, Utah, with primary point of contact Jessica Boyles.

General Info

General Electric Aerospace to sole-source develop and sustain JEDAI LRU for F-16 fleet at $40.4 million.

Agency

Department Of Defense → FA8232 Aflcmc WwmkView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

NIBLEY, UT, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8232 Aflcmc Wwmk
Contacts2 people available
OfficeHILL AFB, UT, 84056-5820, USA
Organization / Agency
Department Of Defense → FA8232 Aflcmc Wwmk
View Agency Profile
Office AddressHILL AFB, UT, 84056-5820, USA

Full Description

Show more

The Air Force Life Cycle Management Center (AFLCMC) intends to award a sole-source IDIQ contract to General Electric Aerospace for the development, qualification, test, and sustainment of the Joint Electronic Data Acquisition Interface (JEDAI) Line Replaceable Unit (LRU).


The JEDAI LRU is the required fleet-wide replacement for the Crash Survivable Flight Data Recorder (CSFDR) system for the F-16C/D Block 30/32/40/42/50/52 fleet. The current CSFDR systems are experiencing critical challenges due to aging, high failure rates, and lack of repair options, which directly impacts aircraft availability and mission readiness. This effort will establish a single, standardized LRU to create a common F-16 configuration, address exhausted spares, increase system reliability, and reduce maintenance costs. The total estimated value is $40.4M.


This notice of intent is not a request for competitive proposals. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government.


Justification for Sole Source (RFO 6.104-1(a)(4))


This acquisition is being conducted on a sole-source basis under the authority of 10 U.S.C. 3204(a)(1), as implemented by the Revolutionary FAR Overhaul (RFO), which states that only one responsible source and no other supplies or services will satisfy agency requirements.


  • Rationale (RFO 6.104-1(a)(5)): General Electric (GE) Aerospace is the Original Equipment Manufacturer (OEM) of the F-16 CSFDR. The Government does not possess the requisite technical data, drawings, or software data rights necessary to support a competitive procurement for this redesign and sustainment effort. This data is proprietary to GE, and the company has formally stated it will not sell the data rights to the Government.
  • Market research, including multiple Sources Sought Synopses, confirmed that no other source could meet the program's requirements without substantial duplication of cost, estimated at over $40M, and unacceptable schedule delays of at least eight years. Two interested vendors responded to a 2025 Sources Sought notice; however, a comprehensive government engineering review determined their proposed solutions were technically unacceptable, failing to meet critical requirements for Size, Weight, and Power (SWaP), security, and system integration.

Instructions to Responding Parties


All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency. Interested parties who believe they can meet the requirements are to submit a response that clearly details their capability to do so without incurring the cost and schedule impacts detailed above. Responses must be submitted by the closing date of this notice to the contracting officer.

More opportunities from Department Of Defense → FA8232 Aflcmc Wwmk

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS