Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Joint Outfall D Unit 4 Trunk Sewer Rehabilitation

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Joint Outfall D Unit 4 Trunk Sewer Rehabilitation project, managed by the Los Angeles County Sanitation District, involves the structural restoration of approximately 7,836 feet of 27- to 54-inch diameter reinforced concrete pipe. The work will be performed across the Joint Outfall D Unit 4 Trunk Sewer, Main Street Relief Trunk Sewer, and District 5 Interceptor Trunk Sewer using cured-in-place pipe liners. Additional scope includes the application of protective coating systems to 24 manholes and structures, the modification of seven manholes, and the construction of one new manhole. The place of performance is located in Redondo Beach, California, with specific work sites along Redondo Beach Boulevard, Crenshaw Boulevard, and Broadway/Main Street near the 405 Freeway. This project is currently categorized as a forecast with a posted date of July 29, 2025. It has been granted a ministerial and categorical exemption under CEQA Guidelines Section 15301 and Public Resources Code Section 21080(b)(4), as the work consists of necessary repairs to an existing public facility to prevent or mitigate an emergency without expanding the use of the facility. Administrative oversight is provided by Project Engineer Marvin Holmes, and invoicing is handled monthly via email through the agency's billing contact. No specific contract value, formal FAR clauses, or detailed evaluation factors have been established at this stage.

General Info

Rehabilitate 7,836 feet of sewer pipe using CIPP, coat 24 manholes, build one new manhole in Redondo Beach.

Agency

California → Los Angeles County Sanitation District

Place of Performance

Redondo Beach, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Sanitation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles County Sanitation District
Office AddressN/A

Full Description

Show more
The project consists of rehabilitation of approximately 7,836 feet of 27- to 54-inch diameter reinforced concrete pipe (RCP) on the Joint Outfall D Unit 4 Trunk Sewer, Main Street Relief Trunk Sewer and District 5 Interceptor Trunk Sewer with cured-in-place pipe liners. The project will also rehabilitate approximately twenty-four (24),manholes and structure with a protective coating system, modify seven (7) manholes and structures and construct one (1) new manhole.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 16 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS