Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Joint Outfall H Unit 8L Trunk Sewer Rehabilitation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Los Angeles County Sanitation District

Place of Performance

Azusa, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Sanitation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles County Sanitation District
Office AddressN/A
Contacts
Patricia L HorsleyEnvironmental Planner

Full Description

Show more
The project will rehabilitate approximately 4,151 feet of sewer comprising 3,896 feet of 18-inch diameter reinforced concrete pipe (RCP) and 255 feet of 24-inch diameter vitrified clay pipe (VCP) on the Joint Outfall H Unit 8L Trunk Sewer and the Joint Outfall H Unit 8L Relief Trunk Sewer with a cured-in-place pipe liner and 14 manholes with a protective coating system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
2025 CDBG- No. 25p-y-095-1-6798
Solicitation # 25P-Y-095-1-6798
Solicitation 25P-Y-095-1-6798 is a request for sealed bids from the McIntosh County Board of Commissioners for water system improvements in Georgia. The scope of work includes the construction of approximately 8,956 linear feet of 6-inch C900 Class 150 PVC water main, the installation of seven 6-inch mechanical joint ductile iron gate valves, twelve 3-way fire hydrant assemblies, and two connections to existing water mains. Additionally, the project requires the installation of a new 5,000-gallon hydropneumatic tank, 40 square yards of Class A pavement removal and replacement, and all necessary erosion control and appurtenances. All work must be completed within 60 consecutive calendar days from the date of the notice to proceed. This is a Section 3 Covered Contract under the HUD Act of 1968, and bidders must provide Section 3 documentation prior to the notice of award. The project also mandates compliance with the Build America, Buy America (BABA) Act. Bids must be submitted on the provided proposal forms and accompanied by a bidder's bond for 10 percent of the bid amount. Successful bidders will be required to furnish payment and performance bonds along with insurance certificates. The deadline for submission is 1:00 PM local time on December 1, 2026, at the McIntosh County Commissioners Office in Darien, Georgia.
Mcintosh County Board of Commissioners

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The project has an estimated value of 16,690,000 dollars. This solicitation is set aside for Small Businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation criteria focusing on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The agreement is based on EJCDC standard forms, requiring performance and payment bonds, as well as proof of insurance. Bids are due by November 10, 2026, with a final bid opening date of November 12, 2026. Contract administration involves monthly progress payments due 30 days after presentation to the owner, subject to review by the Engineer and the Resident Project Representative. The contractor must adhere to rigorous technical standards, including AWS D1.2 for welding and NEMA standards for motors. Materials must be delivered in original manufacturer packaging with specific labeling and storage requirements, such as maintaining a minimum ambient temperature of 45 degrees Fahrenheit for coatings. The project commences upon the issuance of a Notice to Proceed, which typically occurs within 30 to 60 days of the bid opening or effective date.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS