Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Joint Outfall J Unit 1E Trunk Sewer Rehabilitation

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Joint Outfall J Unit 1E Trunk Sewer Rehabilitation project, managed by the Los Angeles County Sanitation District, involves the rehabilitation of approximately 11,334 feet of reinforced concrete pipe gravity and siphon sewers and 27 manholes. The scope of work utilizes cured-in-place pipe liners for 9,362 feet of 27-inch gravity sewer, 777 feet of 30-inch gravity sewer, 580 feet of 21-inch siphon sewer, and 615 feet of 12-inch siphon sewer, while the manholes will be treated with a protective coating system. The project is divided into four segments located within the Cities of Rancho Palos Verdes and Los Angeles (San Pedro). These segments span various private properties and public rights-of-way, including the Trump National Golf Course, Ocean Trails Reserve, Shoreline Park, the Palos Verdes Shores Mobile Homes and Golf Community, and the White's Point Pumping Plant. Due to the nature of the work, flow bypass pumping is expected to impact Palos Verdes Drive South, West Paseo del Mar, and several private and public park areas. This project is classified as a repair to an existing public facility essential for maintaining public health, safety, and welfare.

General Info

LACSD will rehabilitate 11,334 feet of sewer pipes and 27 manholes in California.

Agency

California → Los Angeles County Sanitation District

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Sanitation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles County Sanitation District
Office AddressN/A

Full Description

Show more
The project will rehabilitate approximately 9,362 feet of existing 27-inch diameter reinforced concrete pipe (RCP) gravity sewer, 777 feet of existing 30-inch RCP gravity sewer, 580 feet of existing 21-inch diameter RCP siphon sewer, and 615 feet of existing 12-inch diameter RCP siphon sewer with a cured-in-place pipe (CIPP) liner. It will also rehabilitate approximately twenty-seven (27) manholes with a protective coating system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 16 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS