Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Joint Regional Water Supply System Joint Transmission Main - Unit 3 Reach 5 Air-Vacuum Valve Relocations

Forecast
JTM U3R5 Air-Vac Valve Reloc-NOE_2024-12-2_signedState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The South Coast Water District is implementing a project to relocate three Joint Regional Water Supply System air-vacuum relief valves from underground vaults to aboveground locations in Laguna Niguel, California. This modification is designed to improve operational safety and efficiency by allowing staff to inspect, maintain, and replace valves without entering confined spaces. The scope of work includes extending air-vacuum piping from existing water transmission mains through core-drilled holes in the current vaults to connect to the new aboveground valves, while leaving the existing underground vaults and piping connections in place. Construction is scheduled to take place between April and October 2025 within the existing right-of-way of Alicia Parkway. The project involves shallow excavations reaching depths of 3 to 5 feet, with a total disturbed area of approximately 300 square feet. Work will be performed sequentially across the three sites, with each phase lasting three to five days. To minimize disruption, lane closures will be scheduled outside of peak commuting hours. The project is categorized as a minor alteration of existing public utility facilities and is exempt under CEQA Section 15301.

General Info

South Coast Water District relocating three water valves aboveground in Laguna Niguel, California.

Agency

California → South Coast Water District

Place of Performance

Alicia Parkway, Laguna Niguel, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → South Coast Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → South Coast Water District
Office AddressN/A

Full Description

Show more
The South Coast Water District proposes to relocate three existing Joint Regional Water Supply System (JRWSS) air-vacuum relief valves that are currently in underground vaults, where they have the potential to flood, to aboveground locations next to or in the vicinity of the existing vaults, consistent with current JRWSS standards. Operations staff would then be able to access the air-vacuum valves for inspection, maintenance, and replacement without entering a confined space. The existing underground vaults and air-vacuum piping connections to the water transmission mains would remain in place. The air-vacuum piping would be extended from the existing water transmission mains, penetrating each vault through a core-drilled hole, and then connected to the new aboveground air-vacuum relief valves. Construction activities at each location would require excavation to a depth of 3 to 5 feet below ground surface and result in a total disturbed area of approximately 300 square feet. All excavation and land disturbance activities would take place within the existing right-of-way of Alicia Parkway in the City of Laguna Niguel (Figure 1, Project Sites) and on land that was previously disturbed to construct the existing pipeline, vaults, and street improvements. We understand that construction would likely occur sometime between April and October 2025. The three vaults would be constructed in sequence with construction periods ranging from three to five days with a maximum of eight trucks required at each site, totaling 20 trips. All three sites will require lane closures and will be scheduled to occur outside of peak commuting hours. The project sites are all within existing roadway with no impact to any trees or other biological resources and would require only shallow excavations (maximum of 5 feet) into previously disturbed soils.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a solicitation issued by Garney Pacific, Inc. for the East Bay Municipal Utility District. The scope of work involves extensive infrastructure rehabilitation, including the repair of covered and open concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, and the replacement of motor control center components. The project also encompasses the modification of sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Key deliverables include lead abatement, metals fabrication, painting, coatings, and FRP reinforcing systems. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 13 days
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS