Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Joint Sealant & Caulking Specialist

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity is for a Joint Sealant and Caulking Specialist to provide interior and exterior sealing services for prime contractors working on Collin College facility projects. The scope of work includes applying sealants to glazing systems, gypsum board assemblies, masonry control and expansion joints, moving joints, and site concrete paving expansion joints to ensure weather-tight penetrations. All work must be performed in strict compliance with ASTM standards C717, C793, C794, C834, C920, and C1193. Interested parties must submit their responses by the deadline of November 13, 2026.

General Info

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of FY2027-CSP-071.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Frisco Library Roof Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Construction
ContactsNo contacts available
OfficeN/A
Organization / AgencyTexas → Construction
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Applies exterior and interior sealants and caulking for prime contractors on Collin College facility projects. Applies sealants to moving joints, masonry control/expansion joints, glazing systems, and gypsum board assemblies, including site concrete paving expansion joints. Must comply with ASTM C717, C793, C794, C834, C920, and C1193. Delivers sealed joints and weather-tight penetrations.

Similar Contracts

Same NAICS industry code

NAICS: 238390
New
Federal
J065--RFQ - INSTALL LEAD BASED LINERS - 544 Columbia SC, 29209
Solicitation # 36C24727Q0036_0001
Solicitation 36C24727Q0036 is a request for a one-time service to supply and install lead-based liners in the Dental Clinic at the WJB Dorn VA Medical Center in Columbia, South Carolina. This procurement is a total set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The contractor is responsible for furnishing all labor, travel, equipment, and materials to install 1/16 inch lead-lined boards on a wall area of approximately 101 to 252 square feet, reaching a maximum height of 7 feet. The scope of work requires a Level 4 drywall finish per ASTM C840 and adherence to ASTM C1396/C1396M specifications for the liners. While the contractor must ensure seams and penetrations are shielded and follow OSHA guidelines, the VA is responsible for demolition, ICRA requirements, painting, and final radiation shielding testing. The period of performance shall not exceed three months from the date of award, with work tentatively scheduled from 6:00 p.m. to midnight, Sunday through Friday, excluding federal holidays. Award will be based on the Lowest Price Technically Acceptable (LPTA) basis, evaluating technical capability and total evaluated price. Offerors must provide a detailed technical approach, proof of OSHA and EPA compliance, and necessary licenses for handling lead-based materials. Invoicing is to be submitted electronically via the Tungsten Network after completion and inspection approval. Contractor personnel are required to check in and out at the Engineering Control Center and must maintain a secure worksite, removing all debris daily.
247-NETWORK Contract Office 7 (36C247)

POSTED

2 days ago

DEADLINE

in 5 days
View Details

More opportunities from Texas → Construction

Same awarding agency

NAICS: 238210
New
SLED
McKinney Main Building Switchboard Replacement
Solicitation # FY2027-CSP-069
Collin College is soliciting competitive sealed proposals for the McKinney Campus Main Building Switchboard Replacement project under solicitation number FY2027-CSP-069. The scope of work involves comprehensive electrical upgrades, including the removal of existing panels and switchboards and the installation of new equipment, feeders, and doors. A critical requirement of the project is the integration of the new switchboard's digital power meter into the existing Energy Management System. Because the building houses the main server room and is supported by a generator, the selected contractor must guarantee that the server room maintains continuous power throughout the entire duration of the project. The contract is a firm lump-sum all-inclusive agreement, which includes a general contingency allowance of 100,000 dollars for unforeseen conditions. Award criteria are based on a points-based evaluation system. Compliance requirements include adherence to the National Electrical Code, UL listing for all equipment, and the Davis-Bacon Act for contracts exceeding 2,000 dollars. Additionally, the contractor must comply with Texas Government Code regarding prevailing wages and cybersecurity training for personnel accessing District systems. Performance and payment bonds are required for bids meeting specific thresholds, with the performance bond required for bids of 10,000 dollars or more and payment bonds for those of 25,000 dollars or more. Proposals must be submitted by November 6, 2026, via the OpenGov portal or delivered to the CHEC office in McKinney, Texas. The contractor is responsible for all shipping and installation, including the removal of all packing debris without using owner dumpsters. Final acceptance is contingent upon a final observation to demonstrate equipment performance and the provision of an Inspection Certificate from the local authority. Payment will be processed via ACH, P-card, or electronic payment, requiring notarized AIA Documents G702 and G703 and valid waivers of liens.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

2 days ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS