Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on October 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Judy Reservoir WTP Disinfection System Replacement Project, Skagit County PUD, Skagit County, WA #13369

Closed
13369State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, identified as Project No. SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the Notice to Proceed. The contract is administered by the City of Belmont with Willis Engineers serving as the representative. Award will be granted to the responsible bidder submitting the lowest responsive bid, with specific evaluation criteria focusing on bidder qualifications, financial ability, and the submission of required Good Faith Efforts and Table A forms. The project mandates strict adherence to ANSI/AWWA and ASTM standards for materials and requires performance and payment bonds. Additionally, the contract establishes socioeconomic participation goals, including an EPA MBE goal of 10.9 percent and a combined State of North Carolina MBE/WBE goal of 10 percent. Payment is processed via Applications for Payment and becomes due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

30 minutes ago

DEADLINE

in 10 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking qualified DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, relining or replacing steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additional technical requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, motor control center component replacement, and modifications to sluice and slide gates. The project also encompasses the installation of access platforms, rerouting sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid for reimbursement. Requested services and supplies include lead abatement, rebar, metals fabrication, painting, trucking, concrete resurfacing, and FRP reinforcing systems. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

30 minutes ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The Judy Reservoir WTP Disinfection System Replacement Project, managed by Public Utility District No. 1 of Skagit County, involves the installation of a new hydrochlorination system. The scope of work includes the construction of a new building for bulk hypochlorite storage and a chemical feed system, encompassing all necessary site work, HVAC, electrical, and control systems. To ensure uninterrupted service, the existing chlorine gas feed system will remain operational during the installation. Additionally, the project requires replacing 1-ton chlorine dioxide gas cylinders with 150-lb cylinders, along with updates to cylinder scales, storage mounts, and scrubber ventilation. This solicitation, identified as number 13369, is for performance in Mount Vernon, Washington. A pre-bid meeting is scheduled for September 25 at 10:00 am at the Water Treatment Plant located at 11932 Morford Road, Sedro Woolley. Interested parties should note the response deadline of October 20, 2026, and may contact Catherine Price for further inquiries.

General Info

Installation of new hydrochlorination system and building for Judy Reservoir WTP in Washington.

Documents

1530

Addendum #1 - Page 1.jpg

JPG

Addendum #1 - Page 2.jpg

JPG

Addendum #1 - Page 3.jpg

JPG

Addendum #1 - Page 4.jpg

JPG

Addendum #1 - Page 5.jpg

JPG

Addendum #1 - Page 6.jpg

JPG

Addendum #1 - Page 7.jpg

JPG

Addendum #1 - Page 8.jpg

JPG

Addendum #2 - Page 100.jpg

JPG

Addendum #2 - Page 101.jpg

JPG

Addendum #2 - Page 102.jpg

JPG

Addendum #2 - Page 103.jpg

JPG

Addendum #2 - Page 104.jpg

JPG

Addendum #2 - Page 105.jpg

JPG

Addendum #2 - Page 106.jpg

JPG

Addendum #2 - Page 107.jpg

JPG

Addendum #2 - Page 108.jpg

JPG

Addendum #2 - Page 109.jpg

JPG

Addendum #2 - Page 10.jpg

JPG

Addendum #2 - Page 110.jpg

JPG

Addendum #2 - Page 111.jpg

JPG

Addendum #2 - Page 112.jpg

JPG

Addendum #2 - Page 113.jpg

JPG

Addendum #2 - Page 114.jpg

JPG

Addendum #2 - Page 115.jpg

JPG

Addendum #2 - Page 116.jpg

JPG

Addendum #2 - Page 117.jpg

JPG

Addendum #2 - Page 118.jpg

JPG

Addendum #2 - Page 119.jpg

JPG

Addendum #2 - Page 11.jpg

JPG

Addendum #2 - Page 120.jpg

JPG

Addendum #2 - Page 121.jpg

JPG

Addendum #2 - Page 122.jpg

JPG

Addendum #2 - Page 123.jpg

JPG

Addendum #2 - Page 124.jpg

JPG

Addendum #2 - Page 125.jpg

JPG

Addendum #2 - Page 126.jpg

JPG

Addendum #2 - Page 127.jpg

JPG

Addendum #2 - Page 128.jpg

JPG

Addendum #2 - Page 129.jpg

JPG

Addendum #2 - Page 12.jpg

JPG

Addendum #2 - Page 130.jpg

JPG

Addendum #2 - Page 131.jpg

JPG

Addendum #2 - Page 132.jpg

JPG

Addendum #2 - Page 133.jpg

JPG

Addendum #2 - Page 134.jpg

JPG

Addendum #2 - Page 135.jpg

JPG

Addendum #2 - Page 136.jpg

JPG

Addendum #2 - Page 137.jpg

JPG

Addendum #2 - Page 138.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Utility District No. 1 of Skagit County
Contacts1 person available
OfficeN/A

Interested Companies (33)

Smugglers Cove FlaggingFriday Harbor, WA
Iconix WaterworksBurlington, WA
TRICO CompaniesBurlington, WA

See All 33 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Installation of a new hydrochlorination system at the Judy Reservoir WTP. The Project will include the construction of a new building for bulk hypochlorite storage and a chemical feed system. The new building will include site work, HVAC, electrical, and control systems. To achieve continuity of service throughout the project, portions of the existing chlorine gas feed system will be maintained during the installation of new hypochlorite feed facilities. Also included is the replacement of the chlorine dioxide system 1-ton gas cylinders with 150-lb cylinders, including cylinder scales, cylinder storage mounts, and scrubber ventilation modifications.
Pre-Bid Meeting: 9/25 @ 10:00 am at the PUD’s Water Treatment Plant, 11932 Morford Road, Sedro Woolley, WA 98284

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS