Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Julian Hinds Pumping Plant Fuel Dispenser System Improvement

Closed
20260717050State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 12 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The Metropolitan Water District of Southern California is soliciting bids for the Julian Hinds Pumping Plant Fuel Dispenser System Improvement, with solicitation number 20260717050 and a response deadline of August 12, 2026. The scope of work involves the installation of fuel pumps, dispensers, leak detectors, vapor recovery systems, electrical conduits and wiring, along with the abatement of asbestos and lead-containing materials, as detailed in the provided drawings and specifications. All work must be performed on-site at the pumping plant in California and comply with a range of industry standards including NFPA 30, UL 79A, NEMA 250, ISA 5.1, ISA 5.4, and ASTM, with adherence to manufacturer specifications taking precedence where more stringent. The contractor is responsible for furnishing all labor, tools, equipment, and materials unless otherwise specified, and must ensure quality control throughout fabrication, delivery, and installation. Delivery of materials must occur FOB trucks to the site, with packaging and labeling conforming to ANSI standards, protecting items from moisture, dust, and temperature extremes between 50°F and 100°F, and requiring clear identification with manufacturer details, batch numbers, expiration dates, and hazard classifications. Equipment and panels must be marked with stainless steel nameplates and heat-shrink wire markers indicating circuit and terminal information. The contract includes specific clauses addressing assignment of causes of action, differing site conditions, hazardous substance management, insurance, payroll records, and prohibited relationships with sanctioned entities, though these are numbered beginning at 59 and appear to follow state or agency-specific formatting rather than standard FAR clauses. Inspection and acceptance are controlled by the Engineer on behalf of Metropolitan, with final acceptance occurring only after all work is completed and deficiencies corrected at the project site. Bidders must submit one electronic PDF and three hardcopy sets bound in heavy-duty 3-ring binders, with electronic submission via the PlanetBids portal and physical delivery of originals to the MWD office in Los Angeles within 24 hours of bid opening. The contract value is based solely on a mobilization cost of $27,000 listed in Line Item 1, with no pricing provided for the core construction work described in Line Item 2, leaving the total estimated value uncertain beyond this mobilization fee. While socioeconomic certifications for SBE and DVBE status are recognized under California state rules, no bidder submissions or completed representations are included in the solic

General Info

Install fuel system upgrades with asbestos/lead abatement at Julian Hinds Pumping Plant per California regulations.

Documents

7

FPFST2500014 Fire Permit for Metropolitan Water District Fuel Station Upgrade

PDF, High priority: read this firstpermit
High

FPST2500014 Fire Permit Drawings Approved - Riverside County Fire Dept

PDF, High priority: read this firstpermit-drawings
High

Notice Inviting Bids for Julian Hinds Pumping Plant Fuel Dispenser System Improvement

PDF, High priority: read this firstnotice-inviting-bids
High

Permit to Construct for Gasoline Storage and Dispensing System - Metro Water Dist

PDF, High priority: read this firstpermit-to-construct
High

Specifications 2116A Julian Hinds Pumping Plant Fuel Dispenser System Improvement

PDF, High priority: read this firstspecifications
High

2116A Julian Hinds Pumping Plant Fuel Dispenser System Drawings

PDF, Low prioritydrawings
Low

AtlasX 9153G Mechanical High Flow Pumps Sell Sheet Rev 02/25

PDF, Low prioritysell-sheet
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMetropolitan Water District of Southern California MWD
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Bid #2116A: The project includes installation of fuel pumps, dispensers, leak detectors, vapor recovery systems, electrical conduits and wires, abatement of materials containing asbestos and lead, and other appurtenant work as specified and shown on the drawings.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS