Juniper Riviera County Water District Improvement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Juniper-Riviera County Water District Improvement Project aims to comprehensively upgrade the water system serving residents in Apple Valley, California, to address chronic water quality violations, infrastructure deficiencies, and operational shortcomings. Key elements include the construction of a new well, Well No. 4, to replace underperforming and contaminated sources, supported by a 2,500-foot, 8-inch PVC transmission pipeline connecting it to the existing system, along with a test well to validate subsurface water quality prior to full development. Existing wells—Nos. 1 and 2—will be rehabilitated with raised pedestals, downturned casing vents, and new magnetic flowmeters integrated into the SCADA system to enhance monitoring and control. Two new bolted steel storage tanks, each designed with a 5.0-foot freeboard for seismic resilience, will be installed adjacent to existing tanks, increasing total storage capacity from 175,000 to 300,000 gallons to meet state MDD and fire flow requirements; Tank No. 5 will be situated on BLM land under an amended ROW grant. The existing tanks—Nos. 1, 2, and 3—will receive NSF-approved epoxy coatings to combat corrosion, along with improved vent screens and overflow airgaps. A blending transmission line, potentially extending 14,700 feet along SBC ROW, is planned as a contingency to blend water if Well No. 4’s output proves inadequate. Forty-six new isolation valves will be installed along Milpas Drive, Loma Vista Road, and Corto Road to enable localized repairs, while aging manual meters will be replaced with automated ones across 280 service connections. The distribution system will be expanded with up to three new pipelines to eliminate dead ends and provide redundancy to upper pressure zones, and four backup generators—two stationary and two portable—will be deployed at critical points to ensure continuity during power outages. All construction activities must comply with strict environmental, safety, and material standards, including NSF/ANSI 60 and 61 for drinking water contact materials, Cal/OSHA excavation protocols, and NPDES stormwater requirements. Contractors are required to coordinate with DIG ALERT, obtain county encroachment permits, restore disturbed sites, manage dust and noise, and notify residents within 200 feet of activity. Funding is anticipated from the State Water Resources Control Board’s Division of Financial Assistance and/or USDA Rural Development, though contract value and formal

General Info

New well, storage tanks, transmission lines, automated meters, backup generators, and pipeline upgrades to improve water quality and reliability.

Agency

California → Juniper Riviera County Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Milpas Road and Santa Rosa Road, CA, 92308

Set-Aside

NONE

Documents

(2)

JRCWD Notice of Determination and CEQA Filing Fee Receipt

PDFnotice-of-determination

JRCWD Final Initial Study and Mitigated Negative Declaration May 2026

PDFmitigated-negative-declaration

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Juniper Riviera County Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Juniper Riviera County Water District
Office AddressN/A
Contacts
Cherie CaseyExecutive Assistant

Full Description

Show more
The Juniper-Riviera County Water District Improvement Project (Project) consists of improvements for the current JRCWD water system including water quality, distribution system, and minor infrastructure definitions for water sources and storage. The Project also proposes the installation of a new well, two new storage tanks, distribution and transmission pipelines, and isolation valves and the rehabilitation of existing wells and storage tanks. The Project is proposed by JRCWD and benefits the residents served by the JRCWD. JRCWD anticipates receiving funding assistance to implement the Project from the Division of Financial Assistance (DFA) of the State Water Resources Control Board (SWRCB) and/or the United States Department of Agriculture (USDA) Rural Development. To address the regular exceedances for water quality, deficiencies in the systems infrastructure, and operation and maintenance deficiencies for JRCWD system, several components are presented in the Draft Preliminary Engineering Report (PER) to be implemented.1 The Project includes the following components: New Well JRCWD does not meet the MDD with its highest source offline per CCR, Title 22, Section 64554(c), has violations for utilizing the standby well (Well No. 3), has water quality risks for Well Nos. 2 and 3 related to fluoride, and has water quality risks for Well No. 3 related to arsenic. This Project component will include a new well (Well No. 4) to improve water supply, water quality, and redundancy. Before drilling Well No. 4, a test well will be drilled to investigate the water quality on the western portion of APN 0435-421-03 owned by JRCWD. A buffer zone of 150-feet from the nearest residential property is proposed to avoid the septic system. Well No. 4 is proposed to provide water supply with the highest source offline and water quality without exceedances to the JRCWD. Well No. 4 will be connected to the existing JRCWD system through a new transmission pipeline. The pipeline will be an 8-inch polyvinyl chloride (PVC) pipeline with an approximate length of 2,500 feet. Conduit will be installed parallel to this pipeline. This pipeline will be built along Rancho Street, Corto Road, and Laramie Street before connecting to either the existing system pipeline or the proposed blending pipeline near Well No. 1 at Horizon Street. An access road would also be constructed running southeast from Pinon Road or Corto Road to Well No. 4 site. The construction of the new transmission pipeline will require an encroachment permit from the County. The appurtenances for the proposed Well No. 4 will include a flowmeter to measure well production, a level sensor to measure water levels, valves, piping, and a pump to waste feature. The flowmeter and level sensor will provide information to the JRCWD’s existing SCADA system. Improve Well No. 1 Well No. 1 has minor deficiencies. This project component proposes the modification of the pedestal and casing vent. Well No. 1 is located on APN 0435-391-04 and is on an easement for ingress and egress, access to the water pipelines, and access to Well No.1 (County Recorder Doc. 529). The JRCWD may need to obtain a construction easement for staging and equipment parking for approximately 58,000 square feet to the north of Well No. 1 on APN 0435-391-04. Improvements for deficiencies include raising pedestal height and down turning the vent and screen mesh. Well No. 1’s pedestal height is less than 24-inches above ground surface and will be raised to 24-inches above grade. The casing vent and screen mesh will be completely downturned. Improve Well No. 2 Well No. 2 has historic fluoride levels near and over the MCL for fluoride (2.0 mg/L). Pump efficiency for the well has dropped twenty percent from 1980 to 2019. The well is located on a JRCWD-owned parcel (APN 0435-283-09). The JRCWD may need to obtain a temporary construction easement for staging and equipment staging for approximately 3,000 to 5,000 square feet to the east of Well No. 2 on APN 0435-282-09. The well was inspected in April 2022 and the inspection identified exceedances of fluoride, a rusted well casing, and mineralization on the screen perforations. This Project component proposes improvements to the pedestal height, casing vent, and flowmeters. Well No. 2’s pedestal height is less than 24-inches above ground surface and will be raised to 24-inches above grade. The casing vent and screen mesh will be completely downturned. A new magnetic flowmeter will connect Well No. 2 to the JRCWD’s SCADA system. The new magnetic flowmeter will remotely provide data to JRCWD to improve operation and monitoring efforts. New Storage Tanks The JRCWD does not meet the MDD for storage per CCR, Title 22, Section 64554(c), or the fire flow storage requirements per the 2022 California Fire Code. JRCWD requires at least approximately 9,071 gallons of additional storage to meet MDD requirements. In order to meet both MDD and fire flow requirements, a total of 129,071 gallons of storage is needed. This project component proposes two new bolted steel storage tanks (Tank Nos. 4 and 5) adjacent to the already existing tanks (Tanks No. 2 and 3). This will increase the storage volume from approximately 175,000 gallons to approximately 300,000 gallons, addressing storage volume deficiencies. This component ensures that JRCWD will meet the storage volume requirements for fire flow and MDD. Construction activities related to Storage Tank No. 4 will be confined to JRCWD owned parcel on APN 0432-022-01 and is adjacent to existing Tank No. 2. Storage Tank No. 5 is proposed on a parcel owned by BLM and is adjacent to existing Tank No. 3. The JRCWD has an established 30-year ROW grant (CACA- 4227) for Tank No. 3 and is to expire in 2039. Form SF299 was submitted to BLM in December 2022 to amend the existing 30-year ROW Grant to include proposed Tank No. 5. Utilizing the freeboard calculations in American Water Works Association D103, seismic design parameters would require approximately 5.0 feet of freeboard is proposed for the storage tanks. This level of freeboard is required to protect the structural integrity of the tank’s roof structure during a seismic event. To provide the necessary storage volume and freeboard, proposed Tank No. 4 would have a similar design to Tank No. 2 (50,000-gallon bolted steel) with an approximate diameter of 23.6 feet with a sidewall height of approximately 16.1 feet above the reinforced concrete foundation. The top of the tanks’ pitched roofs will be a few feet taller in the center. Similarly, proposed Tank No. 5 would have a similar design to Tank No. 3 (75,000-gallon bolted steel) with an approximate diameter of 23.6 feet with a sidewall heigh of approximately 24.15 feet. Each tank would be placed on and supported by a reinforced concrete ring wall foundation. Proposed Tank No. 4 would have a storage capacity of approximately 50,000 gallons and proposed Tank No. 5 would have a storage capacity of approximately 75,000 gallons. At least one storage tank will remain in service during construction of the new storage tanks and booster station. At the sidewall of the Storage Tank No. 4, a new yagi antenna pole will be mounted for wireless communication between the Storage Tank No. 4 and the existing Storage Tank No. 2. Storage Tank No. 3 will be located in an on-site location that differs from the existing tanks’ location. This will allow existing tank(s) to continue in service during operation and allows the new tanks to be at a greater distance from the slope on the northeast side of the site. The tanks will be coated with a thermoset power coating. The exterior color will be a low gloss, tan or other color to match the surrounding landscape, with permission from the BLM for proposed Tank No. 5. Grading, including over excavation and recompaction, will occur on the existing, semi-terraced site. Chain link fences exist around Tank Nos. 2 and 3 and will be expanded to include and protect proposed Tank Nos. 4 and 5 and other facilities against vandalism and theft. Tanks Nos. 4 and 5 also need to be connected to the booster pumps and Tanks Nos. 1 and 2. JRCWD will undertake a professional geotechnical investigation prior to construction to confirm over excavation, recompaction, and other soil improvements at the tank sites. Over excavation at the tank sites are initially anticipated to be approximately five feet below the existing surface. Rehabilitate Tanks Nos. 1, 2, and 3 Storage Tank Nos. 1, 2, and 3 are experiencing moderate amounts of corrosion on the tanks’ exteriors and interiors and do not have deficiencies with the overflow drain airgaps, vent screens, and weather strip gasket. This project component proposes the rehabilitation of Tanks Nos. 1, 2, and 3 with installing new National Sanitation Foundation approved epoxy coatings on the interior of the storage tanks for corrosion protection, correction of diameters of the overflow drain airgaps (two pipe diameters), utilizing bigger mushroom caps to protect vent screens, and installing new weather strip gaskets to provide watertight seals. Tank No. 1 and Tank No. 2 are located on JRCWD owned property on APNs 0435-263-47 and 0432-022-01. Tank No. 3 is located on ROW Grant (CACA-4227) on land owned by BLM. Blending Transmission Pipeline with Well Nos. 1, 2, and 4 and Storage Tank No. 1 If the pilot test hole for proposed Well No. 4 is found to have water quality contaminant exceedances or inadequate production capacity, a blending transmission line between Well Nos. 1, 2, and 4 may need to be implemented to blend JRCWD’s water within its tanks and improve water quality in the system. Since Well No. 4 is expected to have favorable water quality similar to Well No. 1, this project component would be implemented if water quality or production capacity of Well No. 4 is less favorable than anticipated. The transmission pipeline would be installed in SBC ROW from the intersection of Corto Road and Horizon Street to the intersection of Valley View Road and Milpas Road (Figure 3). The length of the pipeline would be approximately 14,700 feet, with an 8-inch PVC pipe. This is an unpaved road, which crosses several desert washes. At these washes, the pipeline installation may be deeper (approximately 6-feet to 8-feet below the surface) and encased on concrete. Installation is proposed via cut and cover methods. Construction at these washes would be expedited and limited to dry periods. New Transmission Pipeline This Project component would involve construction of a dedicated transmission pipeline from the proposed Well No. 4 to the existing water pipeline near Well No. 1. The transmission pipeline from Well No. 4 to Well No. 1 will be located within SBC ROW and within private easements. The pipeline would connect to the Blending Transmission Pipeline described above. The length of the pipeline between Well Nos. 1 and 4 would be approximately 2,500 feet, with a diameter of approximately 6 inches. The transmission pipeline will have isolation valves, blowoff valves, and air-release/vacuum valves along its alignment. The transmission pipeline will not be connected to existing or proposed fire hydrants or water services. The installation of the transmission line and road resurfacing of SBC ROW would follow SBC standards. JRCWD, or its contractor, will obtain an encroachment permit from the County prior to initiating construction. Installation of Isolation Valves and Customer Meter Replacements The JRCWD does not have any isolation valves on Milpas Drive. Localized shutdowns to repair or replace pipelines are not possible due to low numbers of isolation valves. Extensive system shutdowns would be required to repair or replace pipelines without an increase in the number of isolation valves along existing pipelines. Additionally, JRCWD has manually read meters at each service connection. These meters are deteriorating, hard to access in many locations, over ten years old. A quarter of these meters have been replaced. This Project component proposes the installation of isolation valves and replacement of the manual meters. Isolation valves are located on SBC ROW but will require an encroachment permit from the County. The new automatic meters will be installed at service connections and JRCWD will require notification to customers. A total of forty-six new gate valves will be installed at existing tees and crosses along the north-side pipelines on Milpas Drive, Loma Vista Road, and Corto Road. The new gates valves on Milpas Drive include one 4-inch gate valve, twenty-eight 6-inch gate valves, and three 8-inch gates valves. Loma Vista Road will include five 6-inch gate valves. Lastly, Corto Road will include nine 6-inch gate valves. Valves are to be installed at existing tees and crosses in the configuration specified by the modified City of Victorville Standard Drawing W-20, except with gate valves instead of butterfly valves. JRCWD reported 280 service connections within its service area in November 2021. Meters that have not been replaced in the past few years would be replaced by manual meter replacements. Distribution Mainline Extension The southern portion of the JRCWD distribution system includes several dead ends. This Project component proposes to construct up to three pipelines that would connect to the existing system. These proposed mainline extensions are located within private roads and would require easement acquisitions. The pipelines would generally have 6-inch or 8-inch diameters and be equipped with isolation valves, blow off and air-release valves, and hydrants. The pipelines will provide a redundant route for conveyance of water from Tank No. 3 to the upper pressure zones. Currently, single pipeline segments provide water to the upper pressure zones, which presents risks to extended and significant water service interruptions. The proposed pipelines will be located in a rural residential neighborhood. Most parcels in this area are not connected to JRCWD’s distribution system but are located within JRCWD’s service area. Service may be provided to these parcels following the mainline pipeline construction. Installation of Back Up Generators JRCWD does not have any emergency backup generators and is at risk of losing supply during extended electrical outages and emergencies. This Project component proposes four backup generators be installed in the JRCWD system. One stationary generator will be placed at the Booster Pump Station No. 1 site near to Tank No. 1 and another stationary generator will be placed at the Booster Pump Station No. 2 site near Tank No. 2. Two portable generators will be used between the Well Nos. 1, 2, and 4 sites. When not in use, the portable generators will be stored at the JRCWD office and Well No. 1 site and can be relocated as needed. Switchgear will be placed at the well sites and booster station sites.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Surface Water PFAS Removal Project
Solicitation # surface-water-pfas-removal-project
The Surface Water PFAS Removal Project is a public infrastructure initiative led by the Lake Arrowhead Community Services District, aimed at addressing contamination from per- and polyfluoroalkyl substances in local surface water sources. Located in Cedar Glen, San Bernardino County, California, the project involves the design and construction of systems to remove PFAS pollutants, ensuring compliance with environmental and public health standards. The work falls under NAICS code 237110, indicating it is a water and wastewater construction project, and is being administered by SCW Contracting Corporation as the contracting agency. Bids are solicited with a deadline of September 10, 2026, and the contract encourages participation from certified Disadvantaged Business Enterprises under the Department of Transportation program, as well as Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC. Primary point of contact for questions and submissions is Chloe House, reachable via email at estimating@scwcompanies.com or by phone at 760-728-1308. The project is publicly posted through federal procurement channels and further details are available through the provided online link, with all proposals required to meet the specified technical, regulatory, and socioeconomic criteria.
SCW Contracting Corporation

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Memphis, TN - SARP10 Humphreys Blvd CIPP
Solicitation # memphis-tn-sarp10-humphreys-blvd-cipp
The City of Memphis, TN SARP10 Humphreys Blvd CIPP project is seeking qualified subcontractors to perform a range of utility and civil works services, including cleaning and CCTV inspection of sewer mains, PACP and MACP inspections, manhole rehabilitation and grouting, site preparation and restoration, asphalt and concrete pavement removal and replacement, erosion control, bypass pumping, and traffic control. The solicitation is issued by SAK Construction, LLC under a small business set-aside designation that prioritizes participation from Small Businesses, Small Disadvantaged Businesses, Women-Owned Small Businesses, Veteran-Owned Small Businesses, Alaskan Native Corporations, Indian Tribes, and Department of Transportation Disadvantaged Business Enterprises, including MBEs and WBEs. All DBE certifications and negotiations must be finalized by September 9, 2026 to ensure eligibility for evaluation, and proposals are due by 3:00 PM local time on September 10, 2026. The place of performance is in Memphis, Tennessee, and interested parties must contact SAK Estimating at bidcippe@sakcon.com to obtain free access to project plans and specifications. For support related to bonding, financing, insurance, equipment, materials, or other subcontracting assistance, Ryan Hogenmiller at (636) 385-1072 or bidcippe@sakcon.com is the designated point of contact. The NAICS code is 237110, and while no contract value is disclosed, the project is structured to facilitate robust small and disadvantaged business involvement through targeted subcontracting opportunities.
SAK Construction, LLC

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Hagerstown Wastewater Treatment Plant Improvements - Phase 1
Solicitation # hagerstown-wastewater-treatment-plant-improvements-phase-1
The Hagerstown Wastewater Treatment Plant Improvements – Phase 1 project aims to modernize aging infrastructure at the facility in Maryland to ensure compliance with nitrogen and phosphorous limits and other quantitative permit requirements, without expanding treatment capacity or addressing future growth. Key improvements include replacing influent screens and washer compactors, installing a building to enclose the headworks for NPDES thermal compliance, replacing multiple pumps including two in-plant pumps, three RAS pumps, and adding a WAS pump to Final Clarifier No. 1, upgrading the Operations Building Sanitary Grinder Pump Station, modifying primary sludge discharge piping, installing a new ferric chloride/alum chemical storage tank in a dedicated structure, and replacing Motor Control Centers, PLCs, and Switchgear to enhance reliability. Additional work involves adding a nitrate probe to the BNR basins, repairing cracked and spalled concrete at the headworks, and making miscellaneous structural and building upgrades such as new HVAC systems, roofing, stairways, doors, and windows. All detailed specifications and plans are available via The Belt Group’s website. The project is wage rated and requires strict adherence to labor standards. Performance will occur at the Hagerstown WWTP with bids due by August 17, 2026, and submissions must be made through the “Projects to Bid Login” portal using specified credentials. The solicitation is open to small business concerns including SDB, WOSB, HUBZone SB, VOSB, and SDVOSB, with a strong emphasis on encouraging participation from MBE/DBE/WBE firms as subcontractors and suppliers across electrical, mechanical, masonry, plumbing, pump, and material supply categories. Carl Belt, Inc. is an equal opportunity employer and actively promotes collaboration among diverse small businesses, including the formation of consortia for larger bid items. Contact for inquiries is Jared Burkett at (301) 729-8900 or via email at info@thebeltgroup.com.
Carl Belt, Inc.

POSTED

about 9 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
The project involves the construction of a major water treatment facility and associated infrastructure in Osceola County, Florida, under the Cypress Lake WTP, Wellfield, & Raw Water Main initiative, commissioned by the Central Florida Water Cooperative and managed by Wharton-Smith, Inc. as the general contractor. The scope encompasses the full build-out of raw water production infrastructure including wells with associated well heads, pumps, discharge piping, surge bladder tanks, wellhead cages, and site civilworks. It further includes the construction of multiple critical facility buildings and systems: an electrical building with standby generator, operations and reverse osmosis buildings, pretreatment and post-treatment chemical buildings, a degasification system, an odor control air exhaust stack, and comprehensive primary and secondary water quality analytical laboratory capabilities. Production well disinfection is mandatory to meet regulatory certification standards. The estimated project value is $270 million, positioning it as a large-scale public infrastructure undertaking. This solicitation is specifically targeted toward State of Florida Certified Disadvantaged Business Enterprise (DBE) subcontractors and suppliers, aligning with Department of Transportation DBE participation goals. Wharton-Smith, Inc. is not issuing a direct contract but rather inviting qualified DBE subcontractors to submit proposed scopes of work and firm pricing for portions of the overall project, with bids due by August 19, 2026, at 2:00 PM EST. Submissions must be emailed to watergmpbids@whartonsmith.com, with proposed scopes required 24 hours in advance and final pricing submitted by 10:00 AM on bid day. Bidding documents, including plans, specifications, and addenda, are accessible for free via ConstructConnect. The place of performance is in Florida, and while payment terms, contracting type, bonding, insurance, and detailed evaluation criteria are not provided, Wharton-Smith has indicated willingness to review responsible quotes and negotiate terms as appropriate. All work must comply with regulatory certification requirements for water quality and safety.
Wharton-Smith, Inc.

POSTED

about 9 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
Fire Pond Supplemental Water Project
Solicitation # CPO18-027
The Iroquois Job Corps Center located at 11780 Tibbits Road, Medina, New York is soliciting bids for the Fire Pond Supplemental Water Project under NAICS code 237110, with the solicitation open to small business set-asides including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business. Bids must be submitted by August 15, 2025, at 12:00 PM EST, and all quotations must remain valid for 90 days. Prospective bidders are required to provide a current Certificate of Insurance and must secure bonding as a condition of participation. All interested parties must contact Denise Socha at Socha.Denise@jobcorps.org to obtain required documentation, as no detailed specifications, deliverables, or pricing information are publicly available in the solicitation. Bidders must also provide their DUNS number, parent company DUNS number if applicable, their full physical address with nine-digit ZIP code and congressional district, and the primary performance location with the same details. Compliance with FAR 52.204-10 is mandatory, requiring submission of a Subcontractor's Certification of FFATA Reporting Status, which includes eligibility exemptions based on annual gross revenue thresholds under $300,000 or federal revenue under $30,000,000, or if less than 80% of revenue comes from federal sources, or if executive compensation data is publicly accessible via SEC or IRS filings. The contract type, evaluation criteria, payment terms, and detailed scope of work are not disclosed, and all inquiries must be directed to the designated point of contact for further information.
Iroquois Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237110
New
Dobson, NC (Surry County) – Ridge Road Pump Station & Force Main Replacement. PROJECT NO. SRP-W-134-0020 (Advertisement for Re-Bid)
Solicitation # dobson-nc-surry-county-ridge-road-pump-station-force-main-replacement-project-no-srp-w-134-0020
The contract involves the rehabilitation and expansion of the Ridge Road Pump Station in Dobson, North Carolina, under Project No. SRP-W-134-0020. The Base Bid encompasses upgrading the existing sewage pump station, installing approximately 2,650 linear feet of 8-inch force main, and relocating about 250 linear feet of 8-inch gravity sewer, along with associated construction activities. Additional work is available through four additive bid items: installing an emergency generator and automatic transfer switch at the pump station; adding approximately 1,750 linear feet of 8-inch force main; relocating an additional 175 linear feet of 8-inch gravity sewer; and installing a sewage screen assembly to enhance system reliability and capacity. The project is solicited as a small business set-aside, open to qualified Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned Small Businesses. The solicitation was posted on August 8, 2026, with responses due by August 25, 2026, and is managed by Jimmy R. Lynch & Sons, Inc., with Daniel Lynch listed as the primary point of contact for inquiries.
Jimmy R. Lynch & Sons, Inc.

POSTED

about 9 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
Caseyville Township, IL - Potomac Drive Sanitary Sewer Lining
Solicitation # caseyville-township-il-potomac-drive-sanitary-sewer-lining
SAK Construction, LLC is soliciting subcontracting opportunities for the Potomac Drive Sanitary Sewer Lining Project in Caseyville Township, Illinois, with a response deadline of August 20, 2026, at 3:00 PM local time. The project seeks Minority Business Enterprises (MBEs) certified by the National Minority Supplier Development Council (NMSDC) to participate in key phases including Pre-Installation Cleaning, Pre-Installation CCTV, Cleaning and CCTV of Laterals, and CIPP Lateral Lining. Access to detailed plans and specifications is provided free of charge through SAK Estimating at bidcippc@sakcon.com, and interested parties are encouraged to contact Rex Gellasch at (636) 385-1000 or the same email for guidance on subcontracting opportunities, bonding, insurance, lines of credit, equipment, and material procurement. The work is located at Potomac Drive in Caseyville, Illinois, and while no contract value, pricing details, or formal evaluation criteria are disclosed, all submissions must be finalized and negotiations completed by August 19, 2026. The solicitation does not specify packaging requirements, inspection protocols, payment terms, or administrative contacts beyond the primary point of contact, nor does it list mandatory certifications, bond types, or compliance clauses beyond the MBE preference.
SAK Construction, LLC

POSTED

about 9 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
Central Coast Blue AWPF
Solicitation # central-coast-blue-awpf
Filanc is soliciting bids for the construction of the Central Coast Blue Advanced Water Purification Facility (AWPF) in Pismo Beach, California, with a nominal water production capacity of 0.50 million gallons per day and an annual output target of 500 acre-feet. The scope encompasses a comprehensive range of civil, structural, mechanical, and electrical construction services including SWPPP, surveying, materials testing, traffic control, dewatering, shoring, demolition, well drilling, fencing, jack and bore, paving, striping, landscaping, precast concrete, rebar, masonry, structural steel, metal framing, wood terrace and benching, roofing, glazing, skylights, doors, flooring, coatings, elevators, laboratory casework, window coverings, signage, and process equipment such as UV/AOP, MF/UF, and RO systems. Key deliverables include a 200,000-gallon equalization storage tank with automated flow control, a two-stage RO system, chemical storage and feed systems sized for future expansion, a purified water storage tank, a pump station, approximately 1,000 linear feet each of HDPE pipeline for influent and RO concentrate, and connections to the sanitary sewer system. Groundwater recharge infrastructure will include one injection well and two monitoring wells at the site. All work must comply with Build America, Buy America (BABA) requirements, mandating U.S.-sourced materials and manufactured products. The solicitation is designated as a Small Business Set-Aside under NAICS code 237110, encouraging participation from Small Businesses, Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone firms, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses. Filanc actively promotes subcontracting opportunities with DBEs and will provide support for bonding, credit lines, insurance, and procurement to qualified small and disadvantaged entities. Proposals must be submitted by 2:00 PM Pacific Time on August 13, 2026, and all plans and specifications are available at no cost by contacting Julia Masaitis. The place of performance is 966 Huber St., Pismo Beach, CA 93433. While pricing details, evaluation criteria, contract administration contacts, payment methods, and delivery schedules are not specified, the solicitation emphasizes equal opportunity and prohibits discrimination in contracting practices. Bidder compliance with BABA, socioeconomic requirements, and the ability
Filanc

POSTED

about 9 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237110
New
SEWER CONSTRUCTION
Solicitation # Sanitary Contract No. 866
The contract pertains to the Replacement of the Southwest Diversion Pressure Sewer – Phase I Frankfurt Avenue in Baltimore, Maryland, under Sanitary Contract No. 866, issued by the City of Baltimore Department of Public Works Office of Engineering and Construction. The principal work involves the installation of approximately 4,450 linear feet of 102-inch sewer pipe using open-cut construction, along with associated appurtenances and surface restoration. All bidders must be prequalified by the City of Baltimore’s Office of Boards and Commissions in category B02552 – Sewer Construction and meet a cost qualification range of $60,000,000.01 to $70,000,000.00 to be eligible. Bids must be submitted in duplicate as sealed proposals addressed to the Board of Estimates of the Mayor and City Council of Baltimore and delivered to the Office of the Comptroller, Room 204, City Hall, no later than 11:00 A.M. on August 5, 2026, with no extensions permitted. The project is funded through the Maryland Water Quality & Drinking Water Revolving Loan Fund and the U.S. EPA WIFIA program, and includes mandatory MBE and WBE participation goals of 22% and 16% respectively. Joint ventures must submit documentation verifying their formation alongside their bid. All inquiries must be submitted in writing by July 8, 2026, to designated city contacts. The solicitation is set aside for small businesses under SBA categories including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone, Veteran-Owned Small Business, Alaskan Native Corporations, and Indian Tribes. Contract administration is managed by Lotania Walston of the City of Baltimore, with point of contact information also listed for the contractor’s estimator, Joel Ottley.
Monumental Paving & Excavating, Inc.

POSTED

about 9 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
Buccaneer Lift Station Fixed Price Design-Build
Solicitation # buccaneer-lift-station-fixed-price-design-build
The City of Oceanside is soliciting fixed-price design-build proposals for the upgrade of the Buccaneer Lift Station and replacement of associated pipelines at 1425 S. Pacific St., Oceanside, California. The project encompasses a broad range of construction and engineering activities including SWPPP development, surveying, testing and inspection, traffic control, dewatering, shoring, pile installation, demolition, paving, striping, landscaping, sewer bypass systems, precast concrete elements, concrete vaults, rebar, masonry, metalwork, miscellaneous architectural components, roofing, hollow metal doors, protective coatings, signage, process equipment, hoisting systems, piping, valves, and pipe supports. The procurement is structured as a fixed-price contract with a firm deadline for bids set for 4:00 PM on September 16, 2026. Plans and specifications are available at no cost through Julia Masaitis of Filanc, the contracting entity acting on behalf of the City of Oceanside. While contract value, delivery schedules, and specific payment terms are not disclosed, the solicitation emphasizes a design-build delivery model requiring integrated planning and execution from offerors. This procurement is designated under SBA guidelines as a small business set-aside, with participation encouraged from Small Businesses, Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone businesses, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses. Filanc actively supports diverse business participation by offering assistance in securing bonding, insurance, credit lines, equipment, and materials to qualified SBEs, MBEs, and WBEs, and encourages the formation of DBE consortia when project scope exceeds individual firm capacity. The organization is committed to equal opportunity, prohibiting discrimination based on race, religion, color, ancestry, age, gender, disability, medical condition, or place of birth, and will not engage with firms that engage in discriminatory practices. Although detailed evaluation factors, inspection protocols, and contract administration contacts beyond the point of contact are not provided, the solicitation reflects a structured framework prioritizing compliance, inclusivity, and comprehensive infrastructure modernization within a defined geographic and regulatory setting.
Filanc

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details