Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Justification for Other Than Full and Open Competition: Emergency Repairs to Glass Breakwater, Apra Harbor, Guam

Awarded
N40192-26-JARS-005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Naval Facilities Engineering Systems Command Marianas has issued a sole-source contract modification to Tutor Perini Corporation-Nan Inc. Joint Venture for immediate emergency repairs to the Glass Breakwater at Apra Harbor, Guam, following damage caused by Typhoon Sinlaku. The work is essential to stabilize the critical waterfront infrastructure and prevent further deterioration, with tasks including bathymetric surveys, hydrodynamic modeling, recovery of existing rock, and the procurement and placement of specialized armor stone. Due to the urgent and unusual nature of the situation, the action is justified under FAR 6.302-2 for unusual and compelling urgency, bypassing competitive bidding to ensure rapid response. The estimated value of the modification is $30,000,000, with the work to be performed in Piti, Guam, under the office of NAVFAC Marianas. All communications and administrative actions are managed through the designated point of contact, Cheyenne Santos, and the solicitation number N40192-26-JARS-005 is officially listed under NAICS code 237990 for other heavy and civil engineering construction.

General Info

Sole-source $30M emergency repair of Apra Harbor’s Glass Breakwater in Guam after Typhoon Sinlaku damage.

Agency

Department Of Defense → Navfacsyscom MarianasView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Piti, GU, USA

Set-Aside

NONE

Documents

(1)

20_JA+PC11+Emergency+Repairs+Final_260702_Redacted.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Justification (J&A)

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Marianas
Contacts1 person available
OfficeFPO, AP, 96540-2937, USA
Organization / Agency
Department Of Defense → Navfacsyscom Marianas
View Agency Profile
Office AddressFPO, AP, 96540-2937, USA
Contacts
Cheyenne Santos

Full Description

Show more

The Naval Facilities Engineering Systems Command (NAVFAC) Marianas has issued a justification for other than full and open competition for a sole-source contract modification to Tutor Perini Corporation-Nan Inc. A Joint Venture (TPC-NAN JV).


This action is for critical and immediate emergency waterfront stabilization repairs to the Glass Breakwater at Apra Harbor, Guam. The required services are necessary to address damage sustained from Typhoon Sinlaku and mitigate further deterioration of this critical infrastructure. The scope of work includes, but is not limited to, bathymetric surveys, hydrodynamic modeling, rock recovery, and the procurement and placement of critical armor stone.


The estimated value of this modification is $30,000,000. The statutory authority permitting this action is FAR 6.302-2, Unusual and Compelling Urgency.

Similar Contracts

NAICS: 237990
New
SLED
West Boardwalk Area Renovation and Daysail Trail ProjectThe West Boardwalk Area Renovation and Daysail Trail Project entails comprehensive improvements to pedestrian infrastructure and visitor access within Lake St. Clair Metropark in Macomb County, Michigan. Key tasks include the removal and replacement of existing boardwalk decking and railings along the beachside boardwalk, along with the construction of new ADA-compliant ingress and egress ramps, including a dedicated access ramp for the eastside boardwalk. Additional scope involves building a new asphalt walking path around the perimeter of the golf course, installing pedestrian pathways and paved picnic areas in the day use zone near the beach, and restriping two existing parking lots for park visitors. The project also requires associated site grading, pavement preparation, markings, and restoration of disturbed areas, with all work coordinated carefully to maintain ongoing park operations. The solicitation, issued by the Huron-Clinton Metropolitan Authority under the number 900-25-272 and posted on July 15, 2026, requires contractors to provide all labor, equipment, and materials necessary to complete the work in full compliance with accessibility standards and environmental mitigation requirements. Bids are due by August 4, 2026, and the contracting authority is a state-level agency operating within Michigan. Primary point of contact for inquiries is Kris Myslinski, reachable via email at jason.kulongowski@metroparks.com or phone at 810-494-6018, with all work to be performed exclusively at the designated park location.
Huron-Clinton Metropolitan Authority

POSTED

about 4 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract involves comprehensive upgrades to the airfield infrastructure at the Port of Seattle, focusing on critical safety and operational enhancements. Key elements include replacing airfield lighting circuits with low megger readings by installing modern LED fixtures and signs to improve visibility and energy efficiency, alongside the replacement of deteriorating pavement and essential utilities to ensure structural integrity and long-term reliability. Additional work encompasses wildlife hazard mitigation through the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on airfield signage to deter birds, and the regrading of land and installation of storm drainage systems to eliminate ponding that attracts wildlife. The scope also includes replacing failing flush fire hydrant access hatches to maintain rapid emergency response capabilities. The contract is forecasted under the title AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) Combined and falls under the NAICS code 237990 for other heavy and civil engineering construction. It is managed by the Aviation Project Management Group within the Port of Seattle, with Yanet Maldonado serving as the primary point of contact. The solicitation was posted on July 15, 2026, and while no set-aside details are specified, the work is expected to be performed at the Port of Seattle’s airfield facilities. All efforts are aligned with improving aviation safety, regulatory compliance, and long-term airfield sustainability.
Aviation Project Management Group

POSTED

about 11 hours ago

DEADLINE

N/A
View Details