Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on September 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

JWSC RFP 27-002 Progressive Design-Build Services for N Mainland WPCF Construction and Commissioning

Closed
27-002State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Brunswick-Glynn County Joint Water & Sewer Commission (BGJWSC) is soliciting proposals for the design and construction of the North Mainland Water Pollution Control Facility (WPCF) in Glynn County, Georgia. Utilizing a progressive design-build delivery method, the project aims to expand wastewater treatment capacity to accommodate rapid residential and industrial growth. The scope of work includes the construction of the new WPCF on BGJWSC property, the extension of offsite effluent discharge piping, the installation of approximately 2,000 linear feet of gravity sewer, and the connection of existing upstream force mains. The project is structured in three distinct stages: Phase 1A for initial design and site verification, Phase 1B for 60 percent design and the establishment of a Guaranteed Maximum Price (GMP), and Phase 2 for final design, construction, commissioning, and operator training. The total project budget is capped at 45 million dollars, which encompasses all BGJWSC project costs and the design-builder's scope. Funding is provided through the SRF Loan Program via the Georgia Environmental Finance Authority (GEFA) and is administered by the U.S. Environmental Protection Agency (USEPA). The selected design-builder must ensure compliance with regulations from the USEPA, GEFA, the Georgia Environmental Protection Division, and the Georgia Department of Natural Resources. Proposals are due by October 29, 2026, with the contract award anticipated in December 2026. The performance timeline includes six months for Phase 1A, 12 months for Phase 1B, and up to 27 months for the final completion of Phase 2 services.

General Info

BGJWSC seeks a design-builder for North Mainland WPCF construction with a 45 million budget.

Documents

14
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first4 pages · rfp
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstspecifications
High
PDF, Low priorityother
Low
PDF, Low priorityspecial-notice
Low
PDF, Low priorityother
Low
PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Brunswick-glynn County Joint Water & Sewer Commiss
Contacts1 person available
OfficeN/A

Full Description

Show more
Brunswick-Glynn County Joint Water & Sewer Commission is requesting Proposals for the design and construction of the following Project: Progressive Design Build Services for the North Mainland Water Pollution Control Facility Construction and Commissioning.
Proposals for the construction of the Project will be received at 1703 Gloucester Street, Brunswick, Georgia 31520, until Thursday, October 29, 2026, at 12:00 NOON EST.
To meet its future wastewater treatment needs, the BGJWSC plans to add a new water pollution control facility (North Mainland WPCF) on undeveloped property near Exit 42 along Interstate 95 in Glynn County, Georgia to provide additional treatment capacity to meet current and future system demands.
Due to rapid residential growth in the area and the potential for industrial development in the proposed sewershed, the selected Design-Builder will be required to plan for future expansions and include key infrastructure in the design and construction of the new WPCF to allow future treatment capacity to be easily added.
The Project will meet the BGJWSC's objectives of ensuring adequate treatment capacity and complying with regulations and water quality goals. Potential project components include: construction of a new Water Pollution Control Facility on the BGJWSC's property, offsite effluent discharge piping extension to the receiving water, extension of approximately 2,000 linear feet of gravity sewer to the proposed plant site, and connection of existing upstream force mains to the gravity sewer system that feeds the plant site.
The Project will include the planning, evaluation, design, construction, commissioning, and startup necessary to place the Project in full operation according to contract requirements.
The Project is to be designed and constructed using the progressive design-build delivery method.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS