Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on July 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Killdeer Plains Water Control Structure Replacement at GTR West and Pond 3

Closed
SRC0000032835State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The contract involves the removal of two existing concrete water control structures and their associated pipes at the Killdeer Plains site in Ohio, with the replacement of these structures using AgriDrain systems and corrugated plastic pipes. The contractor will be responsible for the complete disposal of the existing concrete structures and pipes, ensuring proper handling and environmental compliance. The project is overseen by the Ohio Department of Natural Resources, specifically within the Wildlife Management Division, and is set to be executed within a budget range of approximately $50,000 to $150,000. The contract was posted on July 31, 2025, with a response deadline of August 28, 2025, and is part of a solicitation process managed through Ohio's procurement platform. Key contractual and compliance requirements include adherence to standard terms and conditions applicable to state contracts, which encompass legal, ethical, and operational obligations such as compliance with Ohio laws, anti-corruption measures, and conflict of interest policies. Contractors must also complete specific acknowledgment and disclosure forms related to independent contractor status, affirm understanding of executive orders prohibiting offshore services and restrictions on data location, and disclose all service and data storage locations, including subcontractors. These forms ensure transparency and compliance with state regulations, including restrictions on purchasing from certain foreign entities like Russian institutions. Overall, the contract emphasizes environmental responsibility, regulatory compliance, and transparency, with clear responsibilities assigned to the contractor for project execution and disposal activities.

General Info

Agency

Ohio → DNR750460 District 2-Wildlife Management DNRWYA

Place of Performance

OH, USA

Set-Aside

NONE

Documents

5

ODNR Addendum to Bid Quote Template (Non-Federal Funds)

PDF, High priority: read this firstmodification
High

Pond 3 and GTR West Control Structures Replacement - Killdeer Plains Wildlife Area

PDF, High priority: read this firstsow
High

Standard Terms and Conditions - Ohio State Contract

PDF, High priority: read this first15 pages · standard-terms-and-conditions
High

Affirmation and Disclosure Form Rev. 3/22

PDF, Low priority2 pages · affirmation-and-disclosure-form
Low

OPERS Independent Contractor Acknowledgment Form

PDF, Low priority2 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → DNR750460 District 2-Wildlife Management DNRWYA
ContactsNo contacts available
OfficeN/A
Organization / Agency
Ohio → DNR750460 District 2-Wildlife Management DNRWYA
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removing two existing concrete water control structures and corresponding pipe. Replacing with AgriDrain with corrigated plastic pipe. Contractor will be responsible for disposal of concrete control structure and pipe. 

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS