This Award Notice opportunity from Kings Langley School was posted on November 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Kings Langley School Solar Carport Design and Build Tender
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Kings Langley School has awarded a contract to RenEnergy Limited for the design, supply, installation, testing, commissioning, and handover of a turnkey solar photovoltaic (PV) carport system. The project, valued at 307,703 pounds excluding VAT, is scheduled to run from March 15, 2027, through August 31, 2027. The installation is expected to deliver 170kWp and includes a solar PV carport over the existing parking area, encompassing all necessary structural, civil, electrical, and commissioning works. The solution provides a complete Engineering, Procurement and Construction (EPC) package, including surveys, statutory approvals, and training. The primary objectives of the project are to reduce grid electricity consumption, lower carbon emissions, and maximize the value of on-site generated electricity while ensuring a high-quality installation with minimal disruption to school operations. The procurement was conducted as a single-stage open tender process with a weighted evaluation focusing on technical solutions, cost, project delivery, and warranties. This project is integrated with the school's existing infrastructure, which was rebuilt under the Priority School Building Programme private finance (PF2) batch, and has been coordinated with the current contractor, Mitie. There is no set-aside status associated with this contract.
General Info
Contract End Date
August 31, 2027Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Solicitation requirements
7 mandatory15 requirements in 6 areas
- Technical3 · 3 must005
Complete EPC Solution Requirements
- Submission2 · 2 must001
Tender Submission Deadline
- Management7 · 1 must008
Project Delivery Deadline
- 12 more requirements, each with its source quote
Read every requirement with its source and proposal context.
Read all 15 requirementsAsk CLEATUS
I've read this contract. Ask me anything.
Timeline
Award Notice
Contract was awarded
Organization & Contact Information
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
