Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on April 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Kitimat River Hatchery – Well 84-3 Repair and Re-Development

Closed
30007771International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
PIDC Project 1 - Bldg. 3 plumbing, boiler, FA, painting and WWTP
Solicitation # 872281
Solicitation 872281, managed by the Bristol Alliance of Companies for U.S. Immigration and Customs Enforcement, involves a comprehensive series of facility repairs and upgrades at the Port Isabel Detention Center in Los Fresnos, Texas. The project scope encompasses multiple critical infrastructure improvements, including the replacement of boilers across several buildings, the installation of a new fire alarm system in the dining facility, and extensive painting and structural repairs for 11 buildings. Additionally, the contract requires significant plumbing repairs in Multipurpose Building 3 and critical upgrades to the wastewater treatment plant, specifically replacing worn valves, installing a sewage grinder on the influent trough, and utilizing coastal weather resistant materials to ensure long term durability. The project is estimated to have a magnitude between 1.5 million and 2 million dollars and is issued as a task order for 8(a) MACC IDIQ offerors. Contractors must adhere to the TX20260236 wage determination for Cameron County and meet strict requirements regarding key personnel qualifications, quality control, and safety standards. The procurement process includes a mandatory site survey and a detailed pricing template broken down by CSI division. Proposals are subject to technical evaluations focusing on the approach to safety and quality assurance, with a response deadline of September 10, 2026.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 14 days
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. Managed by Garney Pacific, Inc. for the Jurupa Community Services District, the scope of work includes trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities. Additional requirements encompass pavement removal and restoration, traffic control, utility coordination, the construction of flow control facility components, and the overall disinfection, startup, and commissioning of the pipeline system. This solicitation seeks subcontractor and supplier quotes for various trade scopes, including steel pipe welding, electrical and instrumentation, trenchless construction, and the supply of aggregates, ready-mix concrete, and steel fittings. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes and any exceptions to the Garney Standard PO and Subcontract Forms must be submitted to Alyssa Callaway by September 18, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 8 days
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the modification of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and comprehensive drainage and tie-in work. Additionally, the project requires the planting of six native trees and approximately 345 native plants, along with limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. The primary objective of the project is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, with an encouragement for these entities to form consortiums for larger bid items. Bids must be submitted by September 17, 2026, at 4:00 P.M. The primary point of contact for this effort is Jennifer Wilson, with administrative coordination handled by Jonah Leith.
Harbel, Inc.

POSTED

about 6 hours ago

DEADLINE

in 7 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional deliverables include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. Civil works involve the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids are due by September 29, 2026. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of equipment and materials. All negotiations must be finalized 24 hours prior to the bid opening. Technical plans and specifications are available through the James W. Fowler website.
James W. Fowler Co.

POSTED

about 6 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

Fisheries and Oceans Canada is seeking contractors to perform redevelopment and equipment replacement on Well 84-3, a high capacity groundwater well at the Kitimat River Hatchery in British Columbia. The well is critical for supplying groundwater to aquaculture operations and is situated near the Kitimat River within a confined sand and gravel aquifer. The project requires specialized expertise in groundwater well redevelopment, submersible pump installation, and working in confined spaces. The solicitation, titled "Kitimat River Hatchery – Well 84-3 Repair and Re-Development," was posted on March 24, 2026, with a response deadline of April 8, 2026. The contracting authority for this federal government opportunity is Elizabeth Lewis, who can be contacted for more details. The work will be performed in the Prince Rupert area, British Columbia, and requires a contractor with proven experience in similar technically demanding groundwater projects.

General Info

Fisheries and Oceans Canada seeks contractor for Kitimat River Hatchery Well 84-3 redevelopment.

Agency

Government of Canada → Department of Fisheries and OceansView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

*British Columbia, CAN

Set-Aside

NONE

Documents

(2)

Solicitation 30007771 - Request for Qualifications for Kitimat River Hatchery Well Repair

PDFrequest-for-qualifications

RFQ 30007771 Kitimat River Hatchery Well 84-3 Repair and Re-Development

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Department of Fisheries and Oceans
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Department of Fisheries and Oceans
View Agency Profile
Office AddressN/A
Contacts
ELIZABETH LEWISPoint of Contact

Full Description

Show more
Fisheries and Oceans Canada (DFO) intends to undertake redevelopment and equipment replacement work on an existing high capacity groundwater well (Well 84 3) at the Kitimat River Hatchery, located in Kitimat, British Columbia. The well supplies groundwater to critical aquaculture operations and is located adjacent to the Kitimat River in a confined sand and gravel aquifer. The work is technically specialized and will require contractors with demonstrated experience in groundwater well redevelopment, submersible pump installation, and confined space well work.

More opportunities from Government of Canada → Department of Fisheries and Oceans

Same awarding agency

NAICS: 238210
New
International
Pigeon Hill Electrical Repairs, Pigeon Hill, NB
Solicitation # 30008305
Solicitation 30008305 is a federal project issued by the Department of Fisheries and Oceans for electrical repairs at Pigeon Hill, New Brunswick. The scope of work encompasses all labor, materials, and services required for electrical demolition and relocation, the installation of electrical distribution systems, wiring devices, conduits, trenching, and protective plates. Key deliverables include the provision of temporary lighting and power, system testing for acceptance by inspection authorities, and the submission of red-lined record drawings to the consultant. The project requires the use of high-quality, new materials, specifically No. 316 stainless steel for exterior fastenings and corrosion-resistant marine electrical materials. The contract is awarded to the lowest compliant bidder and is subject to the Federal Prompt Payment for Construction Work Act, which mandates payment within 28 calendar days of a proper invoice. Construction is scheduled to take place between October 1, 2026, and January 29, 2027, with substantial completion required by the latter date. The contractor is solely responsible for site safety and must maintain comprehensive insurance, including commercial general liability coverage for six years beyond the date of substantial performance. All waterway equipment must comply with the Canada Shipping Act 2001, and the contractor must coordinate site markings with the Canadian Coast Guard.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

6 days ago

DEADLINE

in about 9 hours
View Details
NAICS: 237990
International
Maintenance dredging with floating equipment at Baie-Comeau, QC
Solicitation # 30008246
Fisheries and Oceans Canada is soliciting bids for maintenance dredging at the Baie-Comeau fishing harbour in Quebec. The project involves the removal of approximately 3,500 cubic meters of seabed sediments using floating mechanical or pumping equipment. The contractor is solely responsible for identifying and securing land-based disposal sites and must provide a written agreement with the landowner to the Departmental Representative at least two weeks before starting work. All dredged materials must be managed according to the Grille de gestion des sols excavés from the Ministère de l'environnement et de la lutte contre les changements climatiques de la Province du Québec. The contract will be awarded to the lowest compliant bidder. Work must be completed by December 18, 2026, although some project documentation mentions a deadline of March 31, 2027. Performance is measured via pre- and post-dredging bathymetric surveys using DGPS-RTK technology. Required security includes performance and labour and material payment bonds of at least 50 percent of the contract amount, or an alternative security deposit of 20 percent. Bids must be submitted electronically by September 15, 2026, and must include a combined price form, subcontractor listings, and a reciprocal procurement declaration.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS