Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on December 21, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Knowledge Management Assessment

Closed
JAP122109Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541990
New
Federal
Water Resources Analytical and Professional Support Services - Multiple Award Task Order Contract (MATOC)
Solicitation # W912HQ27S0006
The US Army Corps of Engineers Mission Support Battalion is soliciting a Multiple Award Task Order Contract (MATOC) for Water Resources Analytical and Professional Support Services. This Indefinite Delivery Indefinite Quantity (IDIQ) contract is designed to provide the Institute for Water Resources (IWR) with technical research, analytical support, data management, facilitation, and training services that are not readily available within the agency. The contract has an anticipated maximum shared capacity of 49,500,000.00 dollars, with a period of performance consisting of one base year and four one-year option periods, plus a possible six-month extension. A partial small-business set-aside is anticipated based on specific tasks within the Performance Work Statement. The scope of work covers all Civil Works mission areas, including navigation, flood risk management, aquatic ecosystem restoration, hydropower, regulatory, recreation, and water supply. Key requirements include the development and maintenance of automated information systems, economic and socio-economic assessments, hydrologic and hydraulic engineering tools, and expertise in water security and integrated water resources management. The contract also involves support for dam and levee safety, conflict resolution, and financial analysis for public works infrastructure. Technical requirements include the provision of key personnel such as a Senior Project Integrator, IT Systems Engineer, and Cloud Systems Engineer, each with specific advanced degree and experience mandates. All deliverables must be provided with unlimited rights to the government, and the contractor is required to maintain a Task Delivery Order Quality Control Plan. Security requirements include a favorable National Agency Check for personnel accessing unclassified systems and adherence to DFARS 239.7602-2 regarding data storage within the United States. Submission requirements for the sources-sought phase include a completed questionnaire, a capabilities statement not exceeding 20 pages, and resumes for key personnel.
W4LD USA Hecsa

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 541990
New
Federal
U.S. Embassy Mexico—International Narcotics & Law Enforcement Affairs (INL Mexico) CONOCER Criminal Analyst Certification Services
Solicitation # 19AQMM26Q0469
Solicitation 19AQMM26Q0469 is an unrestricted Indefinite Delivery Indefinite Quantity (IDIQ) procurement issued by the U.S. Embassy Mexico's International Narcotics and Law Enforcement Affairs (INL Mexico) office. The primary objective is to strengthen the capacity of Mexican state and federal crime analysts by providing certification services under the CONOCER Competency Standard, specifically targeting up to 850 analysts in Competency Standard 1599 to improve investigative quality and reduce impunity for high-impact crimes. The contract is structured as a Firm Fixed Price (FFP) agreement with a five-year ordering period running from December 1, 2026, to November 30, 2031. The scope of work includes evaluation services, the issuance of certifications, and associated travel and VAT reimbursements, with performance occurring at various locations across Mexico. To be eligible, the contractor must be formally registered as a CONOCER Evaluation and Certification Institution and assign qualified personnel, including a CONOCER Evaluator for the 1599 Competency Standard. Award will be based on a trade-off approach where technical factors—specifically key personnel, technical approach, relevant corporate experience, and past performance—are deemed more important than the evaluated price. The evaluation process focuses on the greatest value to the government rather than a numerical formula. Administrative requirements include electronic invoicing via the Invoice Processing Platform (IPP) and adherence to strict submission guidelines, with the final response deadline set for November 1, 2026.
Acquisitions - Aqm Momentum

POSTED

1 day ago

DEADLINE

in 17 days
NAICS: 541990
New
Federal
Maintenance Service for Portable Fire Extinguishers - BPA
Solicitation # 2031ZA27Q00004
Solicitation 2031ZA27Q00004 is a request for quotations for a single-award, firm fixed-price Blanket Purchase Agreement (BPA) to provide portable fire extinguisher maintenance services for the Bureau of Engraving and Printing (BEP) DC Facility. The contract is a total small business set-aside under NAICS 541990. The period of performance is five years, spanning from December 1, 2026, through November 30, 2031. The scope involves the inspection, maintenance, testing, repair, and replacement of approximately 1,000 portable fire extinguishers across the BEP main and annex buildings in Washington, D.C. Services will be managed through annual BPA calls for inspections and as-needed calls for specific repairs or replacements. The contractor must be ICC/NAFED certified and adhere to NFPA-10 and OSHA 29 CFR Part 1910 standards. Key technical requirements include six-year teardowns, hydrostatic testing at five or twelve-year intervals, and the provision of metal valve replacement extinguishers. An annual equipment report is required within 48 hours of service completion. Award will be granted to the lowest-priced, technically acceptable offer with no adverse past performance. Evaluation is based on the completeness of the technical approach and the level of risk associated with the proposal. Offerors must submit their quotes in two volumes: a technical capability volume and a pricing volume using the provided pricing sheet. Submissions must be made by October 30, 2026. The contractor is required to maintain worker's compensation, general liability, and automobile liability insurance. All payment requests must be processed electronically through the Invoice Processing Platform (IPP).
Office Of The Chief Procurement Officer

POSTED

1 day ago

DEADLINE

in 10 days

General Info

NAICS

541990 - All Other Professional, Scientific, and Technical Services

Place of Performance

MacDill Air Force Base, TAMPA, FL, 33621, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4814 6 Cons Pk
Contacts1 person available
OfficeTAMPA, FL, 33621-5119, USA
Office AddressTAMPA, FL, 33621-5119, USA
Contacts
Joseph A. PowellContract Specialist

Full Description

Show more
This is not a solicitation or request for a proposal. This is only a sought for information. Executive Summary: USCENTCOM requires a baseline assessment of its Information Management (IM) and Information Technology (IT) structures and processes in support of establishing a Knowledge Management (KM) program to include the establishment of a KM organization within the command as well as a Command Knowledge Management Officer (CKMO). This study will include but is not be limited to: the review of current IM Officer and Chief Information Officer (CIO) roles and responsibilities, key functions and processes currently executed in support of IM within the Headquarters and the functions and processes within USCENTCOM, its components and assigned Joint Task Forces (JTFs). BACKGROUND: The Clinger-Cohen Act (CCA) of 1996 shapes the government's approaches to information management and information technology (IM/IT) to improve the efficiency and effectiveness of mission performance. The CENTCOM Assessment Team (CAT) report revealed that there is not a Department-wide definition of KM and provided a recommended definition. Additionally, three other discussions were included, specifically Communities of Interest (COI), Information Capture and Knowledge Exchange (ICKE), and the Three Needs Model (3NM - Need-to-Know, Need- to-Share, and Need-to-Use). These concepts are also pertinent to the understanding KM and the establishment of a KM program. USCENTCOM has not established an organization to provide governance, leadership and stewardship for KM, but has recognized the requirement to do so. The outcome of this study will become the foundation for the Command's movement towards attaining this goal. 1. SCOPE/OBJECTIVE: The focus of this task is to perform a comprehensive baseline study of the Command's IM organization and processes, use of technology (IT) currently employed at USCENTCOM and its components/JTFs to support IM and KM business practices to include the capture, storage, indexing, exchange, security (to include operational security considerations), accessibility and presentation of information in order to promote the ability to improve and reduce the decision making cycle required in support of USCENTCOM mission and our national defense. Upon completion, the assessment team will provide, at a minimum: - Final study report with recommendations on organization structure (CKO) and primary KM functions - A draft implementation plan for the establishment KM organization and initial priorities for KM within the command - A proposed outline for a draft KM regulation - A proposed outline for a KM Strategic Plan - A proposed draft Strategic Vision Statement - A report/discussion on the use of current information technologies in use in this command that can be utilized to support KM as well as those technologies that are used outside this command that could be beneficial in support of USCENTCOM KM efforts 2. PERIOD OF PERFORMANCE. The period of performance for this delivery order shall be approximately 120 days from the award of the contract. 3. TASK DESRIPTIONS. Contractor team shall accomplish their assessment in the following three phases: a. PHASE 1. Data Collection 1. Review existing documentation and regulations. 2. Conduct key leader and stakeholder interviews and focus groups. b. PHASE 2. Analysis 1. Assess operational and business processes. 2. Assess manpower requirements and organizational structure to meet requirements. 3. Assess technologies that support information and knowledge management process across the USCENTCOM Command and Control (C2) organizational structures and IT infrastructure. c. PHASE 3. Finalize Recommendations, COAs, and Presentation of Results 1. Provide final deliverable products to the CENTCOM study coordinator NLT 96 hrs prior to the final outbrief of results. 2. The contractor shall present and formally deliver the Final Briefing and Report to the Government. 4. GOVERNMENT SUPPORT: The government will provide: a. Electronic copy of all existing and current draft USCENTCOM regulations, CONOPS and instructions pertaining to processes and governance of IM and IT. b. Scheduling assistance, escort, and facilities for all interviews conducted for the purposes of this study. c. Necessary identification and badges required for access to base and appropriate facilities. 5. TECHNICAL EXHIBITS: All current policies and standard operating procedures will be supplied to the study team. 6. APPLICABLE TECHNICAL ORDERS, SPECIFICATIONS, REGULATIONS, AND MANUALS a. To be identified 7. TECHNICAL REQUIREMENTS: The following describes security clearance and tasks to be accomplished under this study: a. The contractor shall ensure that all members supporting this study have and maintain a minimum of a SECRET security clearance. b. The contractor will review existing and current draft USCENTCOM regulations, CONOPS and instructions pertaining to processes and governance of IM and IT for applicability to a KM program. c. The contractor will review existing and current draft USCENTCOM Theater Campaign Plan and identify where KM can be inserted and leveraged to support this and associated plans such as Security Cooperation to meet USCENTCOM Strategic Goals d. The contractor will conduct necessary interviews with USCENTCOM leadership, or their designated representatives in order to understand the KM needs of the command, the operational/business processes of the command, develop an assessment of current levels of satisfaction, and identify and assess senior leadership views on the establishment of a command CKMO. e. The contractor will conduct necessary interviews with USCENTCOM functional and technical subject matter experts in order to assess the level of knowledge/skills resident in the CENTCOM staff for KM functions, understand the KM needs of the command, the operational/business processes of the command, develop an assessment of current levels of satisfaction, and identify and address the users and implementers within the establishment of a command CKMO. f. The contractor will ensure an electronic record is kept of all interviews, briefings and reports used in the study process. g. The contractor will provide accountability to the study coordinator at the end of each phase. h. The contractor will provide a final report to designated USCENTCOM staff (e.g. CCJ3). 8. SUMMARY OF FORMAL DELIVERABLES (Note: see Measurements and Standards, paragraph 16) a. Assessment of applicability current and emerging KM policies in support of USCENTCOM mission and organizations: Written report of findings. Delivery date: Interim report provided no less than four (4) business days prior to the Final Briefing and Report. Final report provided at time of Final Briefing presentation. b. Recommended Courses of Action (COAs) for organization and structure of a CKMO: Written report of recommended COA. Delivery date: Interim report provided no less than four (4) business days prior to the Final Briefing and Report. Final report provided at time of Final Briefing presentation. c. Recommended manning requirements and structure required to manage the KM coordination processes within the command: Written report of recommended manpower. Delivery date: Interim report provided no less than four (4) business days prior to the Final Briefing and Report. Final report provided at time of Final Briefing presentation. d. Recommended immediate, mid-term, and long-term priorities: Written report of recommended priorities and their associated objectives. Delivery date: Interim report provided no less than four (4) business days prior to the Final Briefing and Report. Final report provided at time of Final Briefing presentation. e. Recommended information technology and knowledge management tools and associated practices that would reduce duplication of effort and improved information capture and sharing throughout USCENTCOM. Delivery date: Interim report provided no less than 4 business days prior to the Final Briefing and Report. Final report provided at time of Final Briefing presentation. f. Draft USCENTCOM Regulation (CCR) governing CKMO organization, processes, boards and operations within the command: Written draft regulation. Delivery date: Interim report provided no less than four (4) business days prior to the Final Briefing and Report. Final report provided at time of Final Briefing presentation. g. Formal Brief of Findings and Recommendations: Microsoft Office compatible briefing and formal presentation to the government, final audience to be determined. Delivery date: Draft briefing four (4) business days prior to the Final Briefing and Report. Final presentation and deliverables to be presented NLT 120 days after commencement of study. 9. INSPECTION AND ACCEPTANCE. The government shall accept technical reports and documentation prepared in response this study based on the requirements established in sections 4, 8 and 16 of this document. Examples of acceptable report / deliverable formats used by the Government will be provided to the contractor at contract start date and when reports or other required documentation changes. The Government Program Manager / Quality Assurance Program representative will determine final acceptance of all products. To determine contract compliance, the Government Program Manager / Quality Assurance Program representative will acknowledge receipt of all products. Upon receipt of the report / deliverable, the Government will have 2 weeks to review the report to ensure that it is in compliance. Upon completion of the review and notification to the contractor, the contractor will have 2 weeks to rectify any deficiencies. This will attest to the on-time and satisfactory nature of each product delivered. 10. WARRANTY. N/A 11. PROGRAM MANAGEMENT. USCENTCOM will provide a task manager who will coordinate the execution of all work performed under this delivery order. 12. WORK ENVIRONMENT: Interviews and focus groups will be conducted in an office or conference room setting. Off site assessment tasks will be provided in contractor provided facilities. 13. TRAVEL REQUIREMENTS. External travel requirements are not anticipated. The contractor will be required to travel to Headquarters UUSCENTCOM (Tampa, FL). Use of Video Teleconferencing will be used to the maximum extent for OCONUS interview and data collection efforts. Travel requirements to Qatar and Bahrain may be necessary, but are not expected. 14. MATERIAL REQUIREMENTS: GOVERNMENT FURNISHED PROPERTY (GFE). The Government shall furnish working space, including necessary utilities, in support of the data collection activities of this study. Additionally, access to commercial telephone service as required for consultation from government facilities to contractor resources during these same activities will be provided. The government will provide the facilities necessary to complete the final study out brief. The contractor shall provide all other support required for this study. 15. ADDITIONAL SECTIONS. Personnel Requirements. Contractor employees performing services shall be required to comply with all USCENTCOM and installation rules and regulations applicable to the conduct, safety, security, and procedures governing site entry and exit. All contractor personnel must be U.S. citizens and posses an existing Secret clearance. Contractor personnel will be required to safeguard data files and output products in accordance with appropriate security measures for the classification of data being handled. 16. Measurements and Standards. Objective Standards AQL Monitoring Method Incentive Progress Reporting Up-to-date and accurate 95% compliance with government schedules Observation and exception reporting Positive Performance Evaluation: Objective Standards AQL Monitoring Method Incentive Project Management Planning and execution Forecasting Scheduling LOE Planned vs. actual 10% variance with allowance for government approved exceptions 100% inspection Positive Performance Evaluation: Objective Standards AQL Monitoring Method Incentive Technical Documentation and Analysis Deliverables and reports meet government standards No more that 2 revisions or resubmissions Observation and inspection Positive Performance Evaluation: 17. ATTACHMENTS (Optional). NONE AGAIN, THIS IS NOT A SOLICITATION OR A REQUEST FOR A PROPOSAL. IF INTERESTED, PLEASE COMMENTS TO THE EMAIL ADDRESS LISTED FOR JOSEPH POWELL, CONTRACT SPECIALIST.

More opportunities from Department Of Defense → FA4814 6 Cons Pk

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS