KPSFS Power Plant Automatic Control System
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Department of Defense is seeking highly specialized engineering and software repair services for the failed Power Plant Automatic Control System at Kaena Point Space Force Station in Hawaii. The selected contractor will be responsible for assessing, testing, and repairing the closed loop computer logic controller to restore the installation's emergency automatic control capabilities. The primary objective is to ensure that critical satellite tracking mission loads can successfully transition to emergency backup generators within 30 seconds of a commercial grid failure. This requirement, identified by solicitation number FA521526P0020 under NAICS code 811210, mandates that all testing be non-destructive to maintain the structural and software integrity of existing generator switch gears and breakers. The project is managed by the office located at JBPHH, Hawaii, with primary coordination handled by A1C Michael R. Perreira.
General Info
Place of Performance
HI, 96792, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Kaena Point Space Force Station has a critical requirement for highly specialized engineering labor, trouble shooting, and software repair services for the failed Power Plant Automatic Control System (ACS). The scope of this effort requires the contractor to safely assess, test, evaluate, troubleshoot, and repair the localized, closed loop computer logic controller that operates the installations power plant emergency automatic control system. The repaired system must successfully achieve automated outage sensing and transition capabilities, transferring critical satellite tracking mission loads to emergency backup generators within approximately 30 seconds of a commercial grid failure. Testing must be non-destructive to ensure the total structural and software integrity of the existing generator switch gears and breakers.
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
