Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on August 15, 2013. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Krassel Loft Building Demolition

Awarded
AG-0261-S-13-0093Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
26ITB0921226K-CRB Abatement & Demolition Services for Fulton County Jail Project
Solicitation # 26ITB0921226K-CRB
Fulton County, Georgia, is soliciting bids for solicitation number 26ITB0921226K-CRB to provide abatement and demolition services for the Fulton County Jail project. The scope of work involves the demolition of three specific locations: the Fulton County Accountability Court, Jefferson Place Transition Housing, and the Bellwood Annex. The project covers approximately 32.86 acres, with 3.30 acres of disturbed area, and requires the removal of buildings, foundations, utilities, and pavement. A critical component of the contract is the identification, abatement, and lawful disposal of hazardous materials, including asbestos-containing materials and lead-based coatings, in compliance with NESHAP, OSHA, and GA EPD regulations. The final objective is to create a proposed green space for a future facility, which includes grading and restoring disturbed areas with topsoil and grass seed. The contract will be awarded to the lowest responsive and responsible bidder based on an evaluation of price, technical experience, and financial capacity. Bidders must attend a mandatory guided site visit on November 10, 2026, and submit their sealed bids by November 20, 2026. Required submissions include a bid bond for five percent of the bid amount, as well as various certifications and disclosure forms. The successful contractor must provide performance and payment bonds for 100 percent of the bid and utilize the B2GNow software for payment reporting. Work is to commence within ten days of a notice to proceed, which may be issued within 120 days of contract execution. All work is subject to inspection by the Construction Manager to determine substantial and final completion.
Fulton County Purchasing Department

POSTED

about 12 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The Krassel Loft Building Demolition project, managed by the Boise National Forest under the Department of Agriculture, involves the complete demolition and removal of the Krassel Loft Building in McCall, Idaho. The scope of work includes the removal of all wood, brick, concrete foundation walls, basement floors, adjoining porches, decks, and eastern walkways, as well as all electrical and plumbing systems. Additionally, the contractor is responsible for conducting asbestos inspections, preparing necessary reports, abating asbestos-containing materials, and coordinating utility disconnects with local companies while ensuring all excavation meets OSHA standards. Administrative updates to the solicitation were provided through two amendments. Amendment 000001 modified the scope of work and scheduled a site visit for July 25, 2013, while Amendment 000002 addressed submitted questions and provided the site visit attendance list. Despite these changes, the quote deadline remained July 31, 2013, with a requirement for vendors to submit a signed SF30 form. The project is categorized under NAICS code 238910.

General Info

Contract Value

$52,201

NAICS

238910 - Site Preparation Contractors

Place of Performance

500 North Mission Street, MCCALL, ID, USA

Set-Aside

NONE

Award Issued Date

Documents

6

AG-0261-S-13-0093, Amendment 000001 - Krassel Loft Building Demolition

PDF, High priority: read this first3 pages · amendment
High

AG-0261-S-13-0093 Attachment 2

PDF, High priority: read this first1 page · specifications
High

Amendment 000002 - Solicitation AG-0261-S-13-0093

PDF, High priority: read this firstamendment
High

Krassel Loft Building Demolition - AG-0261-S-13-0093

PDF, High priority: read this first33 pages · rfq
High

Krassel Loft Demolition - Selective Structure Demolition Specifications

DOC, High priority: read this first8 pages · specifications
High

Wage Determination ID130023 - Idaho Building Construction

PDF, High priority: read this firstwage-determination
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Boise National Forest
Contacts1 person available
OfficeBOISE, ID, 83709, USA
Office AddressBOISE, ID, 83709, USA
Contacts

Full Description

Show more
AMENDMENT 000002 THE PURPOSE OF THIS AMENDMENT IS TO ANSWER QUESTIONS SUBMITTED AND TO POST THE LIST OF COMPANIES AND/OR INDIVIDUALS THAT ATTENDED THE SITE VISIT. PLEASE SEE ATTACHMENT 1. PLEASE NOTE THAT THE SOLICITATION DUE DATE HAS NOT BEEN EXTENDED AND QUOTES ARE STILL DUE ON JULY 31, 2013. PLEASE ENSURE THAT YOU RETURN A SIGNED COPY OF THE SF30. AMENDMENT 000001 THE PURPOSE OF THIS AMENDMENT IS TO MODIFY THE SCOPE OF WORK AND TO INFORM VENDORS OF A SITE VISIT SCHEDULED FOR JULY 25, 2013. PLEASE SEE SF30 AND ATTACHMENT 1. THE SOLICITATION DUE DATE HAS NOT BEEN EXTENDED AND QUOTES ARE STILL DUE ON JULY 31, 2013. PLEASE ENSURE YOU RETURN A SIGNED COPY OF THE SF30. This project consists of demolishing the Krassel Loft Building. The demolition work will include complete demolition and removal of all building materials including all wood and brick, concrete foundation walls and basement floor, concrete porches and deck adjoining the building and concrete walkways located to the east of the building, all electrical and plumbing systems including sump drain found on east side of building, and any other building materials found within 5 feet of the building footprint. The project will require performing an Asbestos Building Inspection, preparing an Asbestos Inspection Report and Pre-Demolition Asbestos Inspection Report, and abating and removing identified asbestos containing materials. Coordination with respective utility companies for shut-off and disconnect of utilities (i.e. water, sewer, & power) will be required. The resulting excavation will need to meet OSHA standards.

More opportunities from Department Of Agriculture → Boise National Forest

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS