This Solicitation opportunity from Massachusetts was posted on August 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
L1275-C2, Terminal B (BLDGS. 27 & 29) Ctu/Steam Trap Replacement And Flash Tank Improvement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the demolition and replacement of existing steam traps, associated piping, trim, condensate transfer units, and installation of new flash tanks at Terminal B (Buildings 27 & 29) in East Boston, Massachusetts. The scope includes removing old equipment, installing new traps, piping, insulation, and transfer units, as well as electrical and control reconnections, ceiling restoration, and system integration. The project is valued at approximately 4 million dollars, with a bidding process requiring electronic submissions via Bid Express, and bids are due by October 1, 2025. The procurement emphasizes compliance with Massachusetts public works laws, including wage requirements, and mandates a minimum of 7% MWBE participation, along with bonds and insurance coverage totaling $10 million. A virtual pre-bid conference is scheduled for September 5, 2025, to clarify project details. The contractual and regulatory framework incorporates Massachusetts General Laws governing public construction, including provisions for responsible bidding, bonding, insurance, and affirmative action. While federal FAR clauses are not explicitly cited, the contract references key state statutes such as Chapter 149, Sections 26-27G and 44A-44H, which establish bidding procedures, wage standards, and project award criteria. The award will be made to the lowest responsible and responsive bidder, with no specific weights assigned to evaluation factors beyond responsiveness, eligibility, and price. The contract stipulates strict compliance with eligibility certifications, including certificates of eligibility for bidders and sub-bidders, and mandates submission of bonds and insurance certificates. Although detailed specifications, attachments, and inspection procedures are not explicitly listed, the project emphasizes adherence to safety, diversity, and legal requirements, with the Massachusetts Port Authority acting as the primary administrative body.
General Info
Place of Performance
MA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
