Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

La Forest Water Storage Reservoir Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The La Canada Irrigation District is planning the La Forest Water Storage Reservoir Project in La Canada Flintridge, California. This initiative involves the construction of a new 2.0 million gallon above-ground welded steel reservoir designed to increase domestic water storage and enhance fire flow capabilities within Pressure Zones 1 and 2. The project site is located approximately 750 feet north of the current end of La Forest Drive. In addition to the reservoir, the scope of work includes the development of a new paved access road, the installation of retaining walls, and the construction of stormwater facilities featuring a drain pipe. The project is managed by General Manager Justin Bailey and is currently listed as a forecast.

General Info

La Canada Irrigation District will build a 2 million gallon water storage reservoir.

Agency

California → La Canada Irrigation District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

La Forest Drive and Los Amigos Street, La Canada-Flintridge, CA, 91011

Set-Aside

NONE

Documents

(1)

LaForestMND_NOD-Signed_081826_flat_OCR

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → La Canada Irrigation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → La Canada Irrigation District
Office AddressN/A
Contacts
Justin BaileyGeneral Manager

Full Description

Show more
The La Cañada Irrigation District LCID is proposing to construct a new water storage reservoir to provide additional domestic water storage and fire flow capability in Pressure Zones 1 and 2. The specific improvements include a new above-ground 2.0 million gallon steel reservoir, 2.0-million-gallon above-ground welded steel water reservoir, a new paved access road, retaining walls, and new stormwater facilities with a drain pipe. The reservoir would be located about 750 feet north of the existing terminus of La Forest Drive in the City of La Canada Flintridge.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
LOCHAB Borehole Drilling Services
Solicitation # 19KE5026Q0082
The American Embassy Nairobi, under the Department of State, is soliciting proposals for borehole drilling services at the LOCHAB construction site in the Runda Area of Nairobi. This firm fixed price contract, identified as solicitation 19KE5026Q0082, involves drilling a 360-meter deep borehole, installing steel casings and screens, performing physical and chemical development, and conducting aquifer testing. The scope also includes the procurement and installation of a Grundfos SP17-27 pump with a 15KW-20HP motor and a logic control panel. The estimated contract value ranges from 25,000 to 100,000 USD. Award will be granted to the lowest priced, acceptable, and responsible quoter who meets all pass/fail gates, including SAM registration and technical qualifications. The selected contractor must begin performance within five calendar days of the award and complete all work within 30 construction days. Key requirements include providing an English-speaking on-site supervisor, maintaining a permanent business address in Kenya, and holding certifications from the National Contraction Authority, National Environmental Management Authority, and Water Resources management. Financial obligations include a bank guaranty of 20 percent of the contract price during performance and 10 percent during the guaranty period, as well as Defense Base Act insurance for employees. Invoicing must be submitted electronically via the my ILMS portal, with payments made in local currency via Electronic Funds Transfer within 30 days of a proper invoice. Proposals must be submitted electronically to nairobigsofp@state.gov by the deadline of August 19, 2026.
American Embassy Nairobi

POSTED

about 14 hours ago

DEADLINE

in about 5 hours
View Details
NAICS: 237110
New
Federal
Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
Solicitation # W912PF26RA011
This construction project at the Miotto Military Installation in Longare, Vicenza, Italy, is a Design-Bid-Build effort to remediate critical failures in the stormwater and sanitary sewer systems to achieve environmental compliance and mitigate flood risks. The scope requires comprehensive repairs, upsizing, and decoupling of cross-connected sewer lines to ensure independent discharge pathways, along with extensive site restoration driven by recent storm damage including soil erosion and landslide vulnerabilities. Key work includes installing a new underground TOC pipe to directly connect to the Bisatto River using established rights-of-way, constructing a stormwater lamination tank beneath a municipal sports field in accordance with Italian Genio Civile regulations, and replacing the field’s surface with synthetic turf over the tank. Additional features involve integrating natural stormwater management elements such as sedimentation tanks, retention ponds, and weir walls to slow and control runoff before discharge. The project includes optional scope items for asbestos pipe removal, landslide area stabilization, and sedimentation pond installation, each as separately priced line items. All work must adhere to U.S. Department of Defense Unified Facilities Criteria including UFC 1-200-01 for building standards, UFC 1-200-02 for sustainable design, and UFC 3-560-01 and UFC 3-600-01 for electrical safety and fire protection, while also complying with CSI MasterFormat and UFGS specification frameworks. Construction must follow a strict five-day work week with weekends and holidays excluded, and traffic on internal roads must remain accessible at all times with alternate one-way flows and sensor-equipped traffic lights. The contract has an estimated performance period of approximately three years, with phase one requiring all external works to commence and complete between September 2026 and September 2027 as mandated by local Italian authorities. Submission of detailed documentation is mandatory, including a visual review report, clash detection report, record model with as-built drawings, and a professionally sealed specification cover sheet. All technical data must be fully legible and consistent with manufacturer documentation, and system sensors and thermostats must be accurately reflected on as-built records. Quality assurance requires the contractor to maintain a Design Quality Control plan meeting professional engineering standards, while the government retains the right to audit submittals without relieving the contractor of responsibility for contract compliance. Final acceptance is contingent upon certification and testing as required by Italian law, with revisions to submitted data needing completion within 30 calendar days. Compliance with stringent security protocols includes restricted information disclosure,
0414 Aq Hq Contract Augmented

POSTED

about 14 hours ago

DEADLINE

in 8 days
View Details