Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on February 22, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LACOSAN Full Circle Effluent Pipeline Project, Update to the 2004 Preliminary Design Report

Closed
RFP 24-21State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221310
New
SLED
DESC Well & Water Treatment and Maintenance
Solicitation # RFB DOS 2027-05
The State of New Hampshire Department of Safety, Division of Emergency Services and Communications, is soliciting bids under RFB DOS 2027-05 for well and water treatment operations and management services. The contract covers the maintenance of two wells located at 311 Meredith Road in Laconia, New Hampshire. Required monthly services include physical and comprehensive inspections of the water system from the meter through all filtration equipment, the provision and installation of consumables such as salt and cartridge filters, and the facilitation of water sampling and testing through a state-approved lab according to the NHDES Master Sampling Schedule. Any system deficiencies or concerns must be reported in writing to the State within 24 hours of inspection. The award will be granted to the vendor providing the lowest total cost who meets all terms and conditions. Qualified bidders must hold a New Hampshire Contract Operator Services certification per Administrative Rule Env-Dw 502 and provide documentation of at least two current clients receiving similar services. The contract is governed by New Hampshire law and requires compliance with NH RSA chapter 281-A for workers compensation, as well as comprehensive general liability insurance with minimum coverage of 1 million dollars per occurrence and 2 million dollars aggregate. Bids must be submitted in a searchable PDF format via email by the specified deadline, and vendors must be registered and in good standing with the New Hampshire Secretary of State.
Department Of Safety

POSTED

about 22 hours ago

DEADLINE

in 15 days
NAICS: 221310
New
Federal
Utilities Privatization of the Water System at U.S. Army Garrison-Hawaii (USAG-HI), Island of Oahu
Solicitation # SP060026R0813
DLA Energy, in coordination with the United States Army, is soliciting proposals for the privatization of the water distribution utility system at U.S. Army Garrison-Hawaii, Island of Oahu. This unrestricted competitive action involves the transfer of ownership, operation, maintenance, and repair responsibilities to a private entity for a maximum term of 50 years. The selected contractor will be responsible for all labor, materials, equipment, and capital investments necessary to ensure continuous and reliable service, including environmental compliance and major system renovations. The process includes a contractor-proposed transition period, after which the system will be conveyed via a Bill of Sale, with real property interests provided as easements or rights of access. Award will be based on a best value determination, where non-price factors—specifically technical capability, past performance, and risk—are significantly more important than price. Technical evaluation focuses on service interruption and contingency planning, operations and maintenance, and system deficiency corrections. Offerors must submit a comprehensive proposal consisting of four volumes, including a technical proposal and a socioeconomic plan demonstrating a commitment to small business subcontracting. Due to the sensitive nature of the requirement, several solicitation documents are secured, requiring vendors to obtain special access through SAM.gov and the Joint Certification Program. Proposals are due by January 7, 2027.
DLA Energy

POSTED

1 day ago

DEADLINE

in 2 months
NAICS: 221310
New
SLED
TUD Long-Term Water Service ContractThe Tuolumne Utilities District is establishing a long-term water service contract with the United States Bureau of Reclamation to secure Central Valley Project water from the New Melones Reservoir. This agreement is designed to increase water supply reliability and diversify the district's portfolio to support existing service areas and growth envisioned under the Tuolumne County General Plan 2040. The contract allows for the diversion of up to 6,000 acre-feet annually, with 2,500 acre-feet allocated for the district's existing service area and 3,500 acre-feet designated for the Chicken Ranch Rancheria Tribe of Me-Wuk Indians for agricultural, residential, and commercial use within their trust boundaries. The agreement remains effective through December 31, 2051, and utilizes existing pipelines and facilities for water conveyance. Payment is based on a rate structure that includes components for operations and maintenance, storage, water marketing, and dam safety, with tiered pricing applied if annual deliveries exceed 80 percent of the contract total. The district is responsible for constructing necessary conveyance facilities at no cost to the United States and must comply with all federal, state, and local water quality standards. Additionally, the contract mandates strict adherence to civil rights and non-discrimination laws, including the Civil Rights Act of 1964 and the Americans with Disabilities Act.
Tuolumne Utilities District

POSTED

1 day ago

DEADLINE

N/A
NAICS: 221310
New
SLED
26YS0058 - Supplemental Water Treatment Operator Labor Services
Solicitation # 26YS0058
The California Department of Veterans Affairs (CalVet) is soliciting bids for solicitation 26YS0058 to provide supplemental water treatment operator labor services for the Rector Reservoir Water Treatment Plant in Napa, California. The contract term runs from January 1, 2027, through December 31, 2029. The selected contractor will provide qualified, licensed operators to perform critical plant operations, including daily water treatment testing, dosage determinations, and the maintenance and repair of mechanical equipment such as pumps, chlorinators, and metering devices. Operators must possess a T-2 license from the State Water Resources Control Board and have at least three years of documented experience in a potable water treatment plant. Bids are due by November 5, 2026, at 5:00 PM and must be submitted via email to the designated Contract Analyst. The basis for award will be determined by compliance with all invitation for bid requirements and the verification of all-inclusive hourly rates for regular, overtime, and weekend/holiday time. Required submissions include a mandatory bid rate sheet, bidder certifications, tax IDs, and business licenses. The contractor must be able to respond to service requests within eight hours of notification and ensure all personnel complete a three-day paid orientation. Preference may be given to certified Small or Micro business enterprises, and bidders are encouraged to provide Disabled Veteran Business Enterprise certifications.
California Department of Veterans Affairs

POSTED

3 days ago

DEADLINE

in 8 days

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

2

Lake County Sanitation District Full Circle Effluent Pipeline PDR

PDF, High priority: read this firstspecifications
High

RFP No. 24-21: LACOSAN Full Circle Effluent Pipeline Project

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Lake County
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Lake County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The County of Lake is inviting sealed proposals for an update of the Full Circle Effluent Pipeline Preliminary Design Report which was initially issued in November of 2004.  Lake County has a long history of beneficial wastewater recycling and reuse. In 1997 the first phase of a project between the Lake County Sanitation District (LACOSAN), Northern California Power Agency (NCPA), and Calpine Corporation saw the completion of a treated effluent pipeline between the Southeast Regional Wastewater Treatment Plant, the Middletown Treatment Plant and the two geothermal power producing partners operating in a known geothermal resource area referred to as the Geysers.  This first phase was followed closely by a second phase of construction which gathered treated effluent from the Northwest Regional Wastewater Treatment Plant and the Clearlake Oaks County Waterworks District Treatment Plant and conveyed it to the SETP and ultimately on to the Geysers. This project known as the Basin 2000 project collected treated effluent from ten communities along the northern and eastern shores of Clear Lake. At the time of construction, the Basin 2000 project conveyed 85% of the countywide effluent to the Geysers providing a many faceted benefit to the County. The project utilizes wastewater recycling to enhance and protect the water quality of Clear Lake and generate power with a low carbon footprint.  In 2004 a Preliminary Design Report was completed for a project which would provide the same collection of treated effluent from wastewater treatment plants located on the western and southern shores of Clear Lake. This work has been given the name “Full Circle” because it continues and completes the reuse of treated wastewater from wastewater treatment plants encircling Clear Lake. The goal of the Full Circle Effluent Pipeline is to convey treated wastewater from existing wastewater treatment plants (WWTPs) at Lakeport and Kelseyville around the south side of Clear Lake and to inject this flow into the existing Southeast Geysers Effluent Pipeline (SEGEP) near Lower Lake for Geysers injection. To maximize flexibility for effluent reuse and improve injection quality, as well as reduce pipeline-fouling potential, the effluent from both Lakeport and Kelseyville WWTPs may be treated to tertiary (California Title 22) standards. Additionally, for reliability and redundancy reasons as well as implementability consideration, water may be drawn from Clear Lake and injected in the system, and water in the system may be used for agricultural irrigation along the pipeline alignment. There is renewed interest in the Full Circle project and preliminary discussions with the multiple partners previously involved indicates support for the project. There is a need to review and revise the former Preliminary Design Report, which was completed in November 2004 to account for changes. New technologies have emerged, new pipeline alignments may need to be considered as the highway has shifted, and new partners may want to participate in the potential for beneficial reuse of the treated effluent. Proposals should be submitted in accordance with the requirements of this solicitation, which are contained herein.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS