Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Laguna County Sanitation District Solids Handling Phase 3 Project

Closed
20260908046State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of $16,690,000. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a substantial completion timeline of 560 calendar days. Bidders must provide a bid bond using form EJCDC C-430 and submit required MWBE documentation, including a Good Faith Efforts Form and Table A. The project is administered by Willis Engineers, who serve as the Owner's Representative. Payment is processed via Applications for Payment, with payments becoming due 30 days after presentation to the owner. Technical standards for the work include compliance with AWS D1.2 for welding, NEMA standards for motors, and ASTM C 1093 for masonry testing.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to motor control center components, and the installation of new instrumentation, electrical systems, and slide gates. Key deliverables for the project include lead abatement, metals fabrication, painting and coatings, concrete resurfacing, and the installation of FRP reinforcing systems and access hatches. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond premiums reimbursed by Garney Pacific. Interested parties must submit their quotes, including their bond rate and any redlines to standard subcontract forms, by November 17, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 8 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of dual 14 to 16-inch diameter HDPE DR 11 pipelines from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station featuring a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on DBE participation. Bids are due by 2:00 PM on October 29, 2025. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 8 hours ago

DEADLINE

in about 17 hours

AI Contract Overview

Show more

The Laguna County Sanitation District is seeking to prequalify Design-Build Entities for the Solids Handling Phase 3 Project at its Wastewater Treatment Plant in Santa Maria, California. The project involves the design and construction of a new biosolids storage facility featuring a reinforced concrete pad, engineered pushwall structures, and a Valco Pruden pre-engineered metal building suitable for future solar installation. The scope includes all necessary civil, structural, mechanical, electrical, and site improvements, as well as the relocation of existing utility lines, to improve operational efficiency and reduce biosolids hauling and disposal costs. The estimated project construction cost, including coordination and structural design, is approximately 2,678,000 dollars. This is a two-step Best Value Selection process. In the first step, the District will evaluate candidates based on essential requirements, organizational history, experience with similar construction projects, and proposed key personnel. Only the four highest-ranked qualified entities will proceed to the Request for Proposals stage. Prequalification submissions are due by 2:00 p.m. PST on October 1, 2026, and must include specific documentation such as audited financial statements, surety bonding capacity, and OSHA safety logs. The anticipated Notice to Proceed is February 2027, with an expected construction duration of approximately five months.

General Info

Prequalification for Laguna County's $2.68M biosolids storage facility design-build project in California.

Documents

1

PRJ-000566 Laguna County Sanitation District Solids Handling Phase 3 RFQ

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Laguna County Sanitation District, a dependent district of the County of Santa Barbara
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid #PRJ-000566: The Laguna County Sanitation District is seeking to prequalify Design-Build Entities for the Solids Handling Phase 3 Project at its Wastewater Treatment Plant. The project involves the design and construction of a new biosolids storage facility. Key components include a reinforced concrete pad integrated with existing site surfaces, engineered pushwall structures for biosolids containment and loading, and a Valco Pruden pre-engineered metal building (or approved equal) to protect biosolids from winter moisture. The metal building should be suitable for future solar installation. The scope also covers related civil, structural, mechanical, electrical, and site improvements necessary for a fully functional solids storage facility, as well as the relocation of existing utility lines. The project aims to improve operational efficiency, enhance solids drying performance, reduce moisture content during winter storms, and lower biosolids hauling and disposal costs.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS