Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 6, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LAK-DS Pair-Gain Modem Upgrade-Replacement for Bldg. 10330

Closed
FA301624Q5129Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its assets. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections on energized transformers to identify thermal anomalies, installing standardized external oil sampling devices to improve technician safety, and performing comprehensive oil testing analysis. Additionally, the selected contractor must evaluate nitrogen preservation systems to ensure positive pressure is maintained and provide on-site training for up to 20 agency staff members on infrared camera usage and defect identification. All work must adhere to NETA MTS, IEEE, NFPA 70E, and ASTM D923 standards, with thermography performed by ASNT Level 1 certified technicians or equivalent. The agency intends to make a single award to the most capable and cost-effective offeror. Evaluation criteria include a proven track record of at least two similar projects within the last five years, personnel qualifications, the proposed staffing plan, and the ability to meet the project timeline. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and required certifications such as a Non-Collusion Statement and Workers Compensation Certificate. Payment will be processed electronically via ACH within 30 days of invoice approval, with options for expedited payment in exchange for a discount. The contract is set aside for small businesses and various SBA-certified categories, and requires strict adherence to California Labor Code provisions for public works contractors.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves inspecting, testing, repairing, and certifying emergency lighting systems to ensure proper egress illumination in compliance with NFPA 101 (2024), NFPA 70, and OSHA standards. Key deliverables include a full inventory of fixtures, functional testing via simulated power outages, the application of durable tracking labels to each fixture, and the integration of recurring maintenance into the facility's Computerized Maintenance Management System. The estimated contract value ranges between $25,000 and $100,000. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids of $25,000 or more, contractors must provide a bid bond equal to 20% of the base bid, as well as performance and payment bonds from a surety company with at least an A- rating. Award decisions will be based on overall best value. The contract is subject to strict federal labor and safety regulations, including the Davis-Bacon Act, Executive Order 14026 regarding minimum wages, and Executive Order 13706 for paid sick leave. Bidders must submit a detailed cost breakout on company letterhead and complete a supplier onboarding packet including a W-9 and self-certification of business size or socioeconomic status per FAR 52.219-8. First-tier subcontractors with awards exceeding $45,000 must also disclose any federal debarment or suspension status.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in about 1 month

General Info

Contract Value

$56,118.14

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

TX

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

4 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Aug 5, 2024 to Aug 8, 2024. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 8, 2024 to Aug 13, 2024. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA

Full Description

Show more
The Contractor shall Engineer, Furnish, Install, and Test (EFI and T) new single mode (SM), loose buffer tube, water blocked, outside plant (OSP) fiber optic cable (FOC) suitable for underground applications in accordance with Attachment 1-Statement of Work. This requirement is from Bldg. 10203 to Bldg. 10330 at JBSA-Lackland. The intent is to install the cable in one continuous length, to the extent that it is practical. The cable will meet RUS 7 CFR 1755.900 criteria; will comply with industry standards with regard to manufacturers? cable marking, jacket, rip cords, water blocking, fiber color coding, jacketing materials, etc. In addition, the FOC will comply with industry standards with regard to mode field diameter, core cladding concentricity, attenuation, and dispersion characteristics at 1310 nm and 1550 nm. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished. This is a firm fixed price contract in which the contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to complete the specific requirements IAW the attached SOW. This requirement shall not provide partial or progress payments. Copies of all required licenses, certificates and permits shall be provided to the Government upon request.**Please take note of the below key dates**Unescorted Base Access Request (UAR) due date: 15 July 2024 at 2:00 PM CST. Site Visit: 23 July 2024 at 10:30 AM CST. Questions due date: 26 July 2024 at 2:00 PM CST. Proposal Submission due date: 5 August 2024 at 2:00 PM CST. Point of Contact: Contract Specialist: Mr. Joseph Gyakari, Email: joseph.gyakari@us.af.mil; Contracting Officer: Mr. Doralo Fuller, Email: doralo.fuller@us.af.mil.-------------------------***Amendment 0004***The purpose of this amendment is apply the following changes: 1. Extend the RFQ closing date from 8 August 2024 @ 3:00PM CST to 13 August 2024 @ 3:00PM CST. 2. Incorporate a revised RFQ document. Additions are highlighted in red, Strikethrough has been applied to all exclusions. All other terms and conditions to the RFQ remain unchanged. --------------------------***AMENDMENT 0003*** The purpose of this amendment is to incorporate revision 2 of the Statement of Works (SOW), dated 8-2-2024-Additions are highlighted in red, Strikethrough has been applied to all exclusions.--------------------***AMENDMENT 0002*** The purpose of this amendment is to extend the Request for Quote (RFQ) closing date from 5 August 2024 @ 3:00PM CST to 8 August 2024 @ 2:00PM CST. All other terms and conditions to the RFQ remain unchanged--------------------. ***AMENDMENT 0001*** The purpose of this amendment is to apply the following changes:(a) Add a revised SOW dated 7/31/2024-Additions are highlighted in red, Strikethrough has been applied to exclusions (Attachment 1).(b) Add responses to the contractor submitted questions and answers (Attachment 3).(c) Incorporate the Service Contract Act Wage Determination (Attachment 6)(b) Other than the changes mentioned above, all other terms and conditions to the RFQ remain unchanged.**AMENDMENT 0001**The purpose of this amendment is to apply the following changes:(a) Add a revised SOW dated 7/31/2024-Additions are highlighted in red, Strikethrough has been applied to exclusions (Attachment 1).(b) Add responses to contractor submitted questions and answers ((Attachment 3).(c) Add the Service Contract Act (SCA) Wage Determination (Attachment 6)(d) Other than the changes mentioned above, all other terms and conditions to the RFQ remain unchanged.

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

New
Federal
DCF3 PROJECTION SYSTEM
Solicitation # A070977
The Department of Defense, specifically the 502 Cons Cl under the Office of the Air Force, is issuing a sources-sought Request for Information (RFI) for the DCF3 Projection System, solicitation number A070977. The objective is to identify capable providers for the installation of standalone audio-visual (AV) classroom equipment in sixteen classrooms at the BMT DCF3 (Building 9270) located at JBSA-Lackland, Texas. The scope of work includes providing all personnel, equipment, and materials to install laser projectors, zoom lenses, lecterns, scaling switchers, and associated cabling. The system must operate as a standalone solution and is strictly prohibited from interfacing with the Air Force network. Key deliverables include the integration of Apple Government-Furnished Equipment, the provision of technical documentation, and the delivery of user training for staff. Technical requirements specify that projectors and extension columns must be Trade Agreement Act (TAA) compliant, and touch panels must be FCC Class A certified. The contractor is responsible for ensuring high video resolution and sound quality, with final acceptance based on a post-installation walkthrough and inspection at the project site. Security requirements are stringent, requiring criminal history checks and background investigations for all personnel accessing the base, as well as strict adherence to Force Protection Condition procedures and a total prohibition of weapons on site. This RFI is strictly voluntary and is not a formal solicitation for quotes; interested parties must submit their capabilities and open-market pricing via email to Tommie Low by October 27, 2026, at 10 a.m. CST.

POSTED

about 21 hours ago

DEADLINE

in 7 days
View Details
NAICS: 811310
New
Federal
Aviation Support Equipment Load Testing
Solicitation # F2MT2M6146AQ01
This Sources Sought Notice, solicitation number F2MT2M6146AQ01, is a market research effort to identify qualified sources capable of providing aviation support equipment load testing and maintenance for the 433rd MXS/AMXS at Joint Base San Antonio-Lackland, Texas. The scope of work involves non-personal services including annual preventive maintenance inspections, load tests, certification, and both scheduled and unscheduled repairs to ensure the safe operation of aircraft support equipment. All services must adhere to OSHA Standards 1910 and 1926, ANSI Standards B30.16 and B30-5, and applicable Air Force Instructions and Technical Orders. Key deliverables include an initial annual preventive maintenance schedule, certification reports due within two workdays of completion, and repair estimates provided within 48 hours of an initial survey. Performance requirements specify that standard preventive maintenance must be completed and equipment returned within 48 hours of pickup, while approved repairs must be returned within three business days. Interested vendors must submit their response, including company details, CAGE code, and a statement of capability with product literature, to Dalwyn Corporan-Polanco by 10:00 AM CDT on October 20, 2026. This notice is for research purposes only and does not constitute a solicitation or a promise to issue one.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

5 days ago

DEADLINE

in about 6 hours
View Details
NAICS: 238220
New
Federal
Brand Name or Equal - WaterFurnace Model: UBH015R for B3631 & B3635 - Turnkey Replacement
Solicitation # A070764SS
The 502d Contracting Squadron is conducting market research via a Sources Sought Synopsis to identify capable industry sources for the turnkey removal and replacement of 48 ceiling-suspended Dedicated Outside Air System Water-Source Heat Pumps at the JBSA Ft Sam Houston San Antonio Military Medical Center Dormitory Annex, specifically in buildings B3631 and B3635. The project is projected as a Firm-Fixed Priced Purchase Order under NAICS code 238220. The contractor must provide all personnel, equipment, and supervision to install units that meet strict technical specifications, including a 1.25-ton capacity, horizontal ceiling-plenum configuration, and the use of low-GWP refrigerants such as R-454B or R-32, as R-410A is strictly prohibited. A critical requirement is that replacement units must fit through existing access openings measuring approximately 3 feet 11.5 inches by 2 feet to avoid structural demolition. The scope of work includes the integration of the units into the central Building Automation System via BACnet IP/MSTP and the use of AHR/ISO 13256-1 certified water-to-refrigerant coaxial heat exchangers. Performance must be completed within 275 days of award. Interested respondents must provide company identification, SAM.gov certifications, and confirmation that technicians hold EPA Section 608 Universal Certifications. Small business prime contractors must also verify they can cover at least 51 percent of the contract cost with their own personnel. Responses are due by October 26, 2026, and must be submitted in PDF format with a maximum length of ten pages, excluding equipment cut sheets.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS