Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 30, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lake Barkley Control Stand Renovations

Closed
W912P5-16-T-0075Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236210
New
Federal
F-15EX 8-Bay Maintenance Hangar Complex-Industry Day
Solicitation # W50S8527H1CU0
The National Guard Bureau is seeking market intelligence for the construction of an aircraft maintenance hangar complex at Selfridge Air National Guard Base in Harrison Township, Michigan. This project supports 21 Primary Aircraft Authorization F-15 EX aircraft and is estimated to have a magnitude between 150 million and 200 million dollars. The scope includes the demolition of buildings 3, 5, 117, and 120, with new parking constructed in the footprints of buildings 117 and 120. The construction may be executed in three phases: Hangar 1, a 2-bay corrosion control and fuel cell hangar; Hangar 2, a 4-bay maintenance hangar; and Hangar 6, a 2-bay munitions and training facility. The project also requires necessary utility and infrastructure upgrades. The government is considering a fixed-price agreement utilizing an Other Transaction Agreement under the authority of 10 U.S.C. 2808a, with funding potentially provided in annual phases of approximately one-third of the total cost. Technical requirements include compliance with DoD antiterrorism and force protection standards, adherence to Air Force and base design standards, and specialized foundations to meet flood plain requirements. Design is anticipated to be 100 percent complete by early 2027. This notice is for planning purposes only and is not a formal solicitation. Interested firms under NAICS code 236210 must provide company details, bonding capacity, and evidence of experience with aviation facilities and constrained-site construction to the designated points of contact by the response deadline of December 1, 2026.
W7NF Uspfo Activity Miang 127

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 236210
New
SLED
Facilities & Parks New Supply Warehouse Building
Solicitation # ITB FM 04-27
The Board of County Commissioners of Okaloosa County, Florida, is soliciting bids under ITB FM 04-27 for the construction of a new 9,000 square foot metal supply warehouse for the Facilities and Parks Department located at 5489 Old Bethel Road in Crestview. The project involves comprehensive site preparation and construction, including the installation of energy-efficient HVAC systems, electrical and plumbing work, and telecommunications wiring. All work must comply with the 2023 8th Edition Florida Building Code, ADA standards, and OSHA regulations, with specific structural requirements to withstand 160 MPH ultimate wind speeds. A fire alarm system is explicitly not required for this project. Bids must be submitted electronically via OpenGov by November 4, 2026, at 3:00 pm CST. The contract will be awarded to the responsive and responsible vendor with the lowest bid, though the County reserves the right to negotiate the most advantageous agreement. The selected contractor must provide a dedicated project manager and furnish both bid and performance bonds. The project timeline is 12 months from the notice to proceed. Payment will be processed through the County Finance Office in accordance with the State of Florida Local Government Prompt Payment Act, contingent upon annual appropriation. For projects involving federal grant funding, contractors must be registered in SAM.gov and comply with Buy America and Trafficking Victims Protection Act requirements.
Facilities & Parks

POSTED

6 days ago

DEADLINE

in 6 days

General Info

NAICS

236210 - Industrial Building Construction

Place of Performance

Barkley Navigation Lock 785 Barkley Dam Road, Grand River, KY, 42045, USA

Set-Aside

SBA

Documents

3

Solicitation W912P5-16-T-0075

PDF, High priority: read this firstrfp
High

Nashville District Corps of Engineers Foreign National Site Visit Request Form

PDF, Low priority1 page · special-notice
Low

Nashville District Corps of Engineers U.S. Citizen Site Visit Request Form

PDF, Low priority1 page · special-notice
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Nashville
Contacts1 person available
OfficeNASHVILLE, TN, 37203-1070, USA
Office AddressNASHVILLE, TN, 37203-1070, USA
Contacts

Full Description

Show more
PERFORMANCE WORK STATEMENT BARKLEY LOCK Control Stand Renovation 1. GENERAL Barkley lock is a high lift navigation lock located at mile 30.6 on the Cumberland River in Grand Rivers, Kentucky. The lock structure is comprised of 2 concrete lock walls, 2 filling valves, 2 empty valves, and 4 lock miter gates. This equipment is operated by a lock operator from 1 of 2 locations on the lock landward wall called "control stands". These control stands are original to the lock construction in 1966. Due to the age and use of the buildings, the windows and doors no longer open and close properly, making security lacking. The heating and air units do not keep up with the demand of the buildings which is a concern during extreme weather events. Lastly the flooring is worn and in need of replacing. 2. SCOPE The scope of this contract is to provide renovations to both (2) controls stands. The contractor shall repair the doors, windows, HVAC, and flooring to both locations to provide the level of security, safety, and comfort required for the use of the buildings. 3. REQUIREMENTS AND PRODUCT SPECIFICATIONS All repairs conducted shall meet industry standards and meet the specification listed below. 3.1 Doors Each control stand has one door to be used for access. The contractor is required to remove the doors and replace in 1 business day so as to not lapse on security of the facility. Doors will be a minimum of 1 3/4-inch thick solid core wood or hollow steel. Hollow steel doors will be industrial type construction with at least 20-gauge skin plate thickness and will be internally reinforced with continuously spaced stiffeners. Door frames will be constructed of a minimum of 18-gauge steel. The doors provided by the contractor shall be of heavy duty industrial grade construction. They shall be metal doors and be complete with hinges, handles, locks, and automatic closer. Door hinge mounting screws should not be exposed to the exterior of the facility. If screws are exposed, they will be spot welded, peened, covered, or filled with material in a way to prevent easy removal. Nails will not be used to mount hinges or any other door hardware. Hinges should not be removable from the outside. Security hinges are preferred in this case. If conventional hinges are used, hinge pins must be spot-welded, peened, covered, or otherwise secured to prevent removal. Doors will have the ability to be secured from the inside for operator safety and will be secured with a deadbolt locking device, crossbar, or similar locking device resistant to jimmying and manipulation from the outside. Latch style door locks will not be used. Locking devices will conform to U.S. Army Corps of Engineers guide specifications. Doors must also Doors have the ability to be secured from the outside for security when not in use and will have locking devices conforming to U.S. Army Corps of Engineers guide specifications for the type of structure or with U.S. Government approved tumbler-type, key-operated padlocks. The servicing facility engineer will verify lock conformance with the guide specification. Any fitted widow will glass will be covered with 4-mil fragment retention film or they will have 1?2-inch thick laminated glass or plastic security glazing. The contractor will be responsible to install both doors in completion and use-able. It is the responsibility of the contractor to provide the new doors and all associated hardware to provide a complete installation. New door locks or new hardware provided will use the same key. The doors shall be hung so that they swing out of the building. Types of doors will be decided in conjunction with the Security Office and the Lockmaster upon consultation. 3.1.1 Demolition It is the responsibility of the contractor to remove and dispose of the existing doors. All keyed hardware shall be reused in the new doors or new hardware provided that uses the same key for use. 3.1.2 Installation The contractor will be responsible to install both doors in completion and useable. It is the responsibility of the contractor to provide the new doors and all associated hardware to provide a complete installation. Door locks may be reused or new hardware provided that uses the same key. The doors shall be hung so that they swing out of the building. Each control stand has one door to be used for access. The contractor is required to remove the doors and replace in 1 business day so as to not lapse on security of the facility. Doors will be a minimum of 1 3/4-inch thick solid core wood or hollow steel. Hollow steel doors will be industrial type construction with at least 20-gauge skin plate thickness and will be internally reinforced with continuously spaced stiffeners. Door frames will be constructed of a minimum of 18-gauge steel. The doors provided by the contractor shall be of heavy duty industrial grade construction. They shall be metal doors and be complete with hinges, handles, locks, and automatic closer. Door hinge mounting screws should not be exposed to the exterior of the facility. If screws are exposed, they will be spot welded, peened, covered, or filled with material in a way to prevent easy removal. Nails will not be used to mount hinges or any other door hardware. Hinges should not be removable from the outside. Security hinges are preferred in this case. If conventional hinges are used, hinge pins must be spot-welded, peened, covered, or otherwise secured to prevent removal. Doors will have the ability to be secured from the inside for operator safety and will be secured with a deadbolt locking device, crossbar, or similar locking device resistant to jimmying and manipulation from the outside. Latch style door locks will not be used. Locking devices will conform to U.S. Army Corps of Engineers guide specifications. Doors must also Doors have the ability to be secured from the outside for security when not in use and will have locking devices conforming to U.S. Army Corps of Engineers guide specifications for the type of structure or with U.S. Government approved tumbler-type, key-operated padlocks. The servicing facility engineer will verify lock conformance with the guide specification. Any fitted widow will glass will be covered with 4-mil fragment retention film or they will have 1?2-inch thick laminated glass or plastic security glazing.. The contractor will be responsible to install both doors in completion and use-able. It is the responsibility of the contractor to provide the new doors and all associated hardware to provide a complete installation. New door locks or new hardware provided will use the same key. The doors shall be hung so that they swing out of the building. Types of doors will be decided in conjunction with the Security Office and the Lockmaster upon consultation. The scope of this contract is for the Contractor to provide renovations to both (2) controls stands. The contractor shall repair the doors, windows, HVAC, and flooring to both locations to provide the level of security, safety, and comfort required for the use of the buildings. 3.2 Windows Each control stand has a series of windows that surround the entire building. The contractor shall be responsible to replace all windows on each control stand. The contractor is required to remove and replace windows in such a way that security of the buildings is not compromised. The windows shall be provided by the contractor and be of heavy duty industrial grade construction. The windows shall be metal frame, be able to be opened from the inside, and be complete with all hinges, slides, rails, handles, and high security locking devices. The glass will be covered with 4-mil fragment retention film or they will have 1?2-inch thick laminated glass or plastic security glazing. All contractor and associated sub-contractor employees shall comply with all applicable project and local security policies and procedures (provided by the district representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by the District Security Management Office. Contractor workforce must comply with all personal identity verification requirements (FAR Clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes. 3.2.1 Demolition It is the responsibility of the contractor to remove and dispose of the existing windows. 3.2.2 Installation The contractor will be responsible to install all windows in completion and useable meaning that all windows shall be useable/able to be open, closed, and locked as part of the installation process. All windows shall be replaced to include windows where HVAC window units currently sit. The windows shall be provided by the contractor and be of heavy duty industrial grade construction. The windows shall be metal frame, be able to be opened from the inside, and be complete with all hinges, slides, rails, handles, and high security locking devices. The glass will be covered with 4-mil fragment retention film or they will have 1?2-inch thick laminated glass or plastic security glazing.. The scope of this contract is for the Contractor to provide renovations to both (2) controls stands. The contractor shall repair the doors, windows, HVAC, and flooring to both locations to provide the level of security, safety, and comfort required for the use of the buildings. 3.3 HVAC It shall be the responsibility of the contractor to install a complete and working HVAC system for each building. 3.3.1 Demolition The control stands each currently have 2 units that do not work properly; one window unit and one wall unit. It is the responsibility of the contractor to remove these units, drain coolant and provide statement of disposal, and provide removed units to the lock staff for turn in. The contractor will not take possession of the removed equipment. 3.3.2 Installation The contractor shall provide 1 unit per control stand for a total of 2, complete and installed in working condition. The units shall be of the split pack variety and sized to properly cool and heat the buildings. Location will be determined with the lock staff upon arrival. 3.4 Flooring The current flooring is a rubber mat that lays on the surface of the metal and concrete floor. The contractor shall be responsible to replace this flooring with a durable substitute that is removable if need be, but designed to provide a dielectric covering for the floor. The rubber flooring shall meet the following minimum requirements: 1. Shall have minimum tread as to not make cleaning difficult; 2. It shall be in roll/sheet form so as not to have multiple joints that may collect debris; 3. Shall be black in color; 4. Minimum " in thickness. 3.4.1 Demolition All old flooring shall be removed by the contractor and properly disposed of. 3.4.2 Installation The contractor shall install new flooring complete, meaning cut and fit properly to walls and adjoining equipment lying flat without undue rises or bubbles. 4. Hours of Work and Location Repairs shall be accomplished at the address below. Repairs shall only occur Monday through Thursday from the hours of 6 am. until 4:30 pm CDT. There will not be any repairs that occur on Federal holidays. US Army Corps of Engineers Barkley Navigation Lock 758 Barkley Dam Road Grand Rivers, KY. 42045 5. SUSTAINABILITY The Contractor shall utilize energy- and water-efficient building-related products and equipment, per the following link to the list of DOE Covered Product Categories: http://energy.gov/eere/femp/find-product-categories-covered-efficiency-programs) for updates. The contractor shall utilize energy- and water-efficient building-related products and equipment on items such as windows, doors, HVAC, and flooring. Also, the Contractor shall ensure that the roofing materials meet energy efficiency requirements. All deliverables be printed double sided on paper that contains post-consumer fiber (recycled content). The Contractor shall comply with the following specifications for sustainable products: - Use of Sustainable Design and Development principles - Low or no toxic or hazardous chemicals (e.g., low VOC paint) - Use of chemicals and products that do not contain ozone-depleting substances (ODS). Note that if FAR clause 52.223-11 is included, it does not indicate compliance. This clause requires contractors to label products with ODS, but does not address the use of alternatives. - Use of biobased products for equipment maintenance 6. SECURITY All contractor and associated sub-contractor employees shall comply with all applicable project and local security policies and procedures (provided by the district representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by the District Security Management Office. Contractor workforce must comply with all personal identity verification requirements (FAR Clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes. Since the work is being done within a controlled area but is expected to last less than six months, the investigation requirements fall under Category B1 for US Citizens and Category C for Foreign Nationals. Contract employees will need to be supervised/ escorted by a Corps employee while within the restricted area. In the event it is determined the contract will extend beyond six months, the contractor will need to comply with the requirements in Category B2 for US Citizens. Guidance and forms for the requirements are available on the Nashville District Public Website: http://www.lrn.usace.army.mil/BusinessWithUs/ContractSecurityRequirements.aspx. Convict Labor: Because the work is being performed in a restricted area, there are restrictions on use of persons either imprisoned or previously convicted of a felony. The Contractor shall not employ in the performance of this contract any person undergoing a sentence of imprisonment imposed by any court of a State, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, or the U.S. Virgin Islands, or the US Federal Government. The Contractor shall not employ in the performance of this contract any person who has been convicted of a felony imposed by any court of a State, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, or the US Federal Government. All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas. Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

More opportunities from Department Of Defense → W072 Endist Nashville

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS