Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Lake Piru Early Warning System Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → United Water Conservation District

NAICS

N/A

Place of Performance

Piru Canyon Road, CA, 93040

Set-Aside

NONE

Documents

(1)

UWCD Lake Piru Early Warning System Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → United Water Conservation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → United Water Conservation District
Office AddressN/A
Contacts
Adrian QuirozSenior Engineer

Full Description

Show more
United Water Conservation District (United) proposes to install a new siren to address a coverage gap in the existing emergency alarm systems at Lake Piru (Project). This new safety device will be located on the western shore of Lake Piru, near United’s existing Water Treatment Facility (34.473026, -118.757202), and will alert boaters on the lake and campers and visitors at the Lake Piru Recreation Area of an imminent emergency. The device will be equipped with a rotating speaker with four active speaker cells, capable of reproducing six standard warning tones and an audible range of 6,100 feet (1.2 miles) at 70 decibels (dB) and 12,200 feet (2.3 miles) at 60 dB. An excavator will be used to dig an 8-foot-deep hole to install a 60-foot pole. The hole will be backfilled with the native excavated soil and the Project will be completed in one day.