LAKE WORTH INLET, NORTH JETTY REHABILITATION, PALM BEACH COUNTY, FLORIDA

Awarded
W912EP20C0014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the rehabilitation of the North Jetty at Lake Worth Inlet in Palm Beach County, Florida, to restore it to its original profile and cross-section. The project requires the procurement, delivery, and precise placement of armor stones weighing between 6 and 14 tons, sourced from Georgia and South Carolina. Contractors must perform substantial manipulation of new and existing stones to achieve specific interlocking tolerances. Before construction begins, a pre-construction benthic community survey is mandatory, and any necessary coral relocations must be completed to mitigate environmental impact. Operational requirements include the use of US Coast Guard certified vessels for marine construction in specific work areas, as land access is restricted by buried utilities and sea turtle nesting regulations. Work must be conducted during daylight hours, and all work areas must remain closed to the public. The contractor is responsible for assessing all marine environmental conditions, including tides, currents, and weather, prior to bidding. Quantity estimations for armor stone are based on absent volume and a 25 percent void space, with strict limitations on using construction tolerances for Variation in Estimated Quantities claims.

General Info

Contract Value

$1,475,116.87

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
Contacts

Full Description

Show more
Work associated with the subject requirement consists of repairs to restore the North Jetty of Lake Worth Inlet to its original profile and cross-section. The North Jetty is approximately 900 feet in length with a height of +0.82 feet NAVD88. Repairs require substantial moving and manipulation of new and reworking of existing stones to obtain the required interlocking within the tolerances provided. The reworking of stone is only for the incorporation of new stone. Stones to be manipulated range from up to 14 tons with a specific weight of 165 pounds per cubic foot. Stone of such weight is available from various locations in Georgia and South Carolina. Locations of jetty rehabilitation are shown on the drawings. Prior to work on the jetty, a pre-construction benthic community survey shall be performed on the jetty structure and any adjacent submerged areas that may be impacted by contractor's operations. Any coral relocations required as a result of the benthic survey shall be completed prior to jetty work. Repairs require the procurement and delivery of stones and placement of stones along the identified repair areas. The distribution of the 6 to 14 ton stones is shown on the drawings. Estimated armor stone quantities were calculated based on 1) the absent volume between the design template neatline and the existing surface generated from the survey, and 2) the expected void space around the placed armor stones. The void space is estimated to be 25% of the absent space. The quantity estimations do not account for the volume between the design template neatline and the upper tolerance neatline. The quantity of material above design surface but below the tolerance shall not be taken into account in the event of a Variation in Estimated Quantities (VEQ) claim. Allowable construction tolerances shall not be used to expand the footprint of work beyond the limits required to establish the finished grade shown on the drawings. Tolerances will be used as a means to provide minor flexibility with the construction without the need for the Contracting Officer to reject the work at each repair area over the possibility of a few select Armor Stone occasionally projecting above the finished grade noted on the drawings. The Contractor shall be responsible for obtaining information concerning the marine work environment including rain, fog, existing depths, shoaling, scouring, wind, wave, current, and tide conditions that could influence safety and construction operations prior to submitting a proposal or bid. Access and staging areas have been identified on the drawings. The access and staging areas shown on the drawings are for access to the site and staging of materials, but not access to the individual work areas. Access to the individual jetty work areas via land is limited due to sea turtle nesting restrictions and buried existing utilities. Work areas must be closed to the public during construction. Water based equipment is required for this work at Areas A and B and shall be US coast Guard certified vessel for marine construction. Work shall be conducted during daylight hours.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS