Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Land Use Element and Safety Element Draft Program Environmental Impact Report

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Ferndale is implementing a comprehensive update to its land use and safety frameworks to align with the 2024 General Plan Land Use Element and current State housing laws. This project involves the adoption of an Addendum to the certified Program Environmental Impact Report and amendments to the Ferndale Zoning Map for 31 parcels. The scope includes updating the Land Use and Safety Elements of the General Plan, with a specific focus on identifying risks from fires, floods, earthquakes, and landslides, as well as addressing climate change and emergency evacuation routes per SB 375. The project emphasizes infill principles to accommodate growth within existing city boundaries by increasing land use density and updating development standards to comply with the 6th Cycle Housing Element. Key regulatory changes include the removal of obsolete zones such as RS, R4, and CAG, and the updating of R2 and R3 residential zones to permit multiple dwellings. Commercial zones C1 and C2 are being amended to allow residential uses by right above the ground floor and via use permit on the ground floor. Additionally, the project introduces revised definitions for employee housing, dwellings, and family, establishes flag lot standards, and implements new objective design criteria. These updates are designed to support the implementation of the Housing Element and reflect current land use needs across the City of Ferndale. The project was officially approved on August 20, 2025, with a determination that it will not have a significant environmental effect.

General Info

Ferndale updates zoning to align with 2024 General Plan and state housing laws, revises parcels, permits mixed-use, adds employee housing.

Place of Performance

n/a, Ferndale, CA, 95536

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Ferndale
Contacts1 person available
OfficeN/A

Full Description

Show more
Adopt the Addendum to the certified Program Environmental Impact Report (PEIR); adopt of amendments to the Ferndale Zoning Map and Ferndale Zoning Ordinance. The Proposed Project includes amendments to the Ferndale Zoning Map for 31 parcels to ensure consistency with the adopted General Plan Land Use Element and Land Use Map, as well as text amendments to multiple articles of the Ferndale Zoning Ordinance. The proposed amendments to the Ferndale Zoning Ordinance include updates to definitions, permitted uses, and development standards to ensure consistency with the 2024 General Plan Land Use Element and current State housing law. Key changes include revised definitions for employee housing, dwellings, and family; the addition of "flag lot" standards; and the relocation and clarification of certain terms. The ordinance removes obsolete zones (e.g., RS, R4, CAG) and updates residential zones (R2 and R3) to permit multiple dwellings and dwelling groups. Commercial zones (C1 and C2) are amended to allow residential uses above ground floor by right, and on the ground floor with a use permit. Employee housing is added as a permitted or conditional use in several zones and combining districts. The amendments also modify yard, height, and density standards, introduce new objective design criteria, and make technical corrections throughout Articles 3–7. These updates support implementation of the Housing Element, compliance with changes in State laws, and reflect current land use needs across the City of Ferndale.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 11 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 14 hours ago

DEADLINE

in 25 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS