Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Landfill Gas Collection Well Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract encompasses the drilling and installation of new or replacement gas collection wells within the boundaries of a landfill to enhance the efficiency of methane gas extraction and ensure adherence to environmental regulations. This work is critical for optimizing the capture of landfill gas, reducing emissions, and maintaining compliance with state and federal environmental standards. The project involves precise engineering and site-specific execution to integrate wells into existing collection systems while minimizing disruption to landfill operations. Performed under a subcontract awarded by Riverside County in California, the work falls under NAICS code 238990 for other construction support activities and is scheduled to be initiated by the posted date of July 14, 2026. Although specific details regarding location, point of contact, or set-aside provisions are not provided, the contract is tied to a regulated landfill environment requiring technical expertise in geotechnical drilling, gas flow management, and environmental monitoring. All activities must align with California’s environmental compliance frameworks and ensure long-term operational reliability of the gas collection infrastructure.

General Info

Drill and install gas collection wells at California landfill to enhance methane capture and ensure environmental compliance.

Agency

California → Riverside County

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Drilling and installation of new or replacement gas collection wells within landfill boundaries to improve gas extraction efficiency and regulatory compliance.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
City of Williams – Wastewater Collection System Improvement Project (Job No. 2290.16)
Solicitation # 2290.16
The City of Williams is soliciting quotes for the Wastewater Collection System Improvement Project, identified as Job No. 2290.16, with a total estimated value of $4.1 million. The scope of work includes replacing up to 10,500 linear feet of 8-inch to 24-inch collection pipeline, replacing laterals and installing new two-way cleanouts within the right-of-way, replacing existing manholes, and lining approximately 320 linear feet of a 15-inch collection pipeline. The project requires supply and services for aggregate and asphalt, precast concrete manholes, ready-mix concrete, sawcutting, shoring rental, SWPPP services, striping, traffic control, trucking, and waterworks pipe and fittings. The solicitation is restricted to small business set-asides including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business, with strong encouragement for subcontractors to utilize DBE and SBE-certified firms through second-tier subcontracting, owner-operated equipment, or direct purchase of supplies. All subcontractors must comply with applicable state, county, and federal regulations as detailed in the project specifications. Plans, specifications, bonding requirements, insurance details, and job overview information are available through Ranger Pipelines, Inc. via their online portal or by email. The bid opening is scheduled for August 8, 2026, at 2:00 PM, and all responses must be submitted prior to that time. The project location is in California, and inquiries should be directed to the Estimating Department at Ranger Pipelines, Inc. using the provided contact information.
Ranger Pipelines Incorporated

POSTED

about 10 hours ago

DEADLINE

in 3 days
View Details