Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

LAPC Sewer Line Replacement Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Los Angeles Community College District is moving forward with an urgent campus-wide replacement of aging and damaged sewer infrastructure at Los Angeles Pierce College, addressing critical failures in a system that has exceeded its service life and is now prone to frequent breaks, blockages, and structural failures. Approximately 6,500 linear feet of sewer lines, ranging from 8 to 12 inches in diameter and buried an average of 12 feet underground, will be excavated and replaced using traditional trenching methods to restore reliable function without increasing system capacity or adding new utility components. The existing sewer line segment owned by the City of Los Angeles via easement is also included in the replacement scope. The deteriorated condition of the system poses an immediate risk to public health, safety, and environmental integrity, with potential for sewer overflow, service interruption, and contamination, making this a high-priority emergency repair initiative. The project has been deemed exempt from environmental review under CEQA as of March 4, 2026, by the District’s Board of Trustees, based on the urgent need to mitigate documented infrastructure failure. Final approval of the project and a formal Notice of Exemption will follow confirmation of funding from the California Community Colleges State Chancellor’s Office. The initiative is managed under the District’s Facilities Planning & Development division, with Dr. Leigh T. Sata serving as the primary point of contact. The project remains a necessary intervention to ensure uninterrupted campus operations and compliance with public health and safety standards.

General Info

Replace 6,500 linear feet of failing sewer lines at Pierce College via trenching to ensure public health and safety.

Agency

California → Los Angeles Community College District

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles Community College District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles Community College District
Office AddressN/A
Contacts
Dr. Leigh T. SataVice Chancellor & Chief Facilities Executive Facilities Planning & Development and Build-LACCD

Full Description

Show more
Los Angeles Community College District ("District") is proposing a project to replace/repair its existing sewer system at Los Angeles Pierce College ("LAPC"). The proposed project involves the campus-wide replacement of aging and damaged sewer line utility infrastructure, including a segment of sewer line owned by the City of Los Angeles via easement ("Project"). Approximately 6,500 linear feet of sewer lines ranging from 8 to 12 inches and an average of 12 feet deep would be replaced throughout campus. Trenching would be used to replace all sewer lines, which consists of excavating land until the entirety of the sewer line section is exposed before workers manually conduct repairs or replacement. The proposed Project would repair failing existing sewer utilities by replacing existing, deteriorated infrastructure with new lines. The overall capacity of the LAPC sewer system would remain the same, and no additional utility infrastructure would be added as part of Project activities. There is substantial evidence to support that the sewer line system is immediately failing infrastructure, making it an urgent, high-priority project that rises to the level of emergency repairs. The majority of the existing infrastructure is far beyond its service life, resulting in frequent sewer line breaks and blockages. The deteriorated sewer line serving the campus has reduced reliability and is at risk of failure, overflow, or service interruption due to frequent cracking, fractures, and offset joints. Failure of the sewer system would pose an immediate threat to public health and safety and could result in environmental contamination and disruption of essential campus services. On March 4, 2026, the Board of Trustees of the District found that the Project was exempt from CEQA review. Once the California Community Colleges State Chancellor's Office confirms the award of Project funding, The Board of Trustees of the District will approve the Project and a further Notice of Exemption will be filed.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, was posted on November 10, 2026, with a response deadline of December 4, 2026. The opportunity is open to various SBA-certified small business categories, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The scope of work involves comprehensive sewer infrastructure improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of sanitary sewer pipes ranging from 6 to 30 inch PVC and 18 to 24 inch DIP, the construction of standard and doghouse manholes, and the execution of 24-inch diameter DIP trenchless crossings with associated launch and receiving shafts. Additional requirements include the fit out of a CSO regulator, outfall installation, and site work such as clearing 5,130 square yards of wooded areas, seeding, and fine grading. Contractors must also provide specialized services including SWPPP implementation and maintenance, geotechnical instrumentation and monitoring, and railroad insurance. The project involves significant excavation work, including extra depth excavation for pipes and manholes, as well as the abandonment of existing pipes and manholes. Interested firms should contact John Connelly at Cleary Construction for bid documents and to discuss subcontracting opportunities.
Cleary Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. The project requires all necessary labor, materials, and equipment to ensure a fully functional system, with specific technical requirements including AC paving, pipe and fitting installation, jack and bore operations, cold planing, demolition, potholing, welding, and the implementation of SWPPP. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, as well as other certified partners such as MBE, SBE, WBE, SBRA, and LSAF. Interested parties must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for the project are Destiny and Nathan Plummer of Norstar Plumbing and Engineering, Inc. All work must be performed in strict accordance with the provided bid documents and agency specifications.
Norstar Plumbing and Engineering, Inc

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS