This Solicitation opportunity from Department Of Defense was posted on July 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
LATCH ASSEMBLY, AIRCRAF
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the procurement of a Latch Assembly, Aircraft, identified by NSN 1560015253551 and part number 114SS670-12, with a total quantity of two units to be delivered FOB origin. The item is classified as a critical application component and requires compliance with stringent technical and quality standards referenced in the DLA Master List of Technical and Quality Requirements, including MIL-STD-1916 or ASQ H1331 for sampling, zero non-conformances for acceptance unless otherwise stated, and adherence to MIL-STD-130 for Item Unique Identification (IUID). Manufacturing and inspection must occur at the origin, with inspection and acceptance points also set at the manufacturer’s facility. The supplier must meet DLA packaging requirements per RP001, comply with ASTM D3951 for commercial packaging, and follow MIL-STD-129 for marking and labeling, all of which supersede general commercial standards. The item is not hazardous per HMIC review, eliminating the need for a Safety Data Sheet. The contract mandates compliance with CMMC Level 2 self-assessment, Non-Tailored Quality Requirements per ISO 9001:2015, and documentation requirements for source approval. A First Article Test (FAT) is required under a separate line item, with the quantity indicated as one unit signaling the test requirement, not a purchase quantity. Delivery is due within 282 days from contract award, with a required delivery date of September 14, 2027, and must be shipped to the designated DLA distribution center in Tracy, California. The contract enforces a zero variance in quantity, and no pricing is permitted for the FAT item, as its cost is assumed embedded in the main line item unless otherwise stipulated. The supplier must be an approved source, with Norco Aerospace, Inc. (CAGE 08844) as the primary manufacturer and ECI Defense Group, Inc. (CAGE 3SDB5) as an approved distributor. The solicitation number is SPE4A7-26-T-579G, with an original posting date of July 16, 2026, and a response deadline of July 24, 2026. This item falls under NAICS code 336413 for aerospace product and parts manufacturing and is
General Info
Agency
NAICS
Place of Performance
REC WHSE 57, TRACY, CA, 95304-5000, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
LATCH ASSEMBLY, AIRCRAFT
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RQ017: PHYSICAL INDENTIFICATION/BARE ITEM MARKING
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
RC001: DOCUMENTATION REQUIREMENTS FOR SOURCE APPROVAL REQUEST (SAR)
RD002, COVERED DEFENSE INFORMATION APPLIES
RD004: Cybersecurity Maturity Model Certification (CMMC) Level 2 Self-Assessment RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ042: Non-Tailored Higher-Level Quality Requirements (ISO 9001:2015) for Manufacturers and Non-Manufacturers
THIS MATERIAL DOES NOT HAVE A SHELF LIFE REQUIREMENT
RT001: MEASURING AND TEST EQUIPMENT
HMIC code review determined not hazardous
Hazardous Material Indicator Code (HMIC) review for HMIC P (FSC is listed in Table II of FED STD 313). This material has been reviewed and
SPE4A7-26-T-579G
SECTION B
determined that it is not hazardous. A SDS (Safety Data Sheet) package review is not required for procurement. This item requires Item Unique Identification (IUID) in accordance with the enclosed/referenced IUID technical requirements and MIL-STD-130. DFARS 252.211-7003 clause applies.
IAW BOEING COMPANY., CAGE 77272 P/N 114SS670-12 SOURCES: NORCO
AEROSPACE, INC., CAGE 08844,(AM-271-28) NOTE: ECI DEFENSE GROUP, INC.,
CAGE 3SDB5 IS AN APPROVED DISTRIBUTOR FOR CAGE 08844
CRITICAL APPLICATION ITEM
MARATHONNORCO AEROSPACE, INC. 08844 P/N 114SS670-12
TDP Rev A Gen 1 IAW REFERENCE REVISION NR DTD PART PIECE NUMBER:
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7017408741 0001 EA 2.000
NSN/MATERIAL:1560015253551
DELIVERY (IN DAYS):0282
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
PREP FOR DELIVERY:
PKGING DATA-QUP:001
IF MATERIAL IS CONSIDERED HAZARDOUS IAW FED-STD-313,
PACKAGE IN ACCORDANCE WITH TQ REQUIREMENT IP025.
IF THE MATERIAL IS NOT CONSIDERED HAZARDOUS, IN ACCORDANCE WITH
FED-STD-313, THE MATERIAL SHALL BE COMMERCIALLY PACKAGED IN ACCORDANCE
WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
W62G2T
SPE4A7-26-T-579G
SECTION B
PR: 7017408741 PRLI: 0001 CONT’D
W1A8 DLA DIST SAN JOAQUIN
25600 S CHRISMAN ROAD
REC WHSE 57
TRACY CA 95304-5000
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE
C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
W62G2T
W1A8 DLA DIST SAN JOAQUIN
25600 S CHRISMAN ROAD
REC WHSE 57
TRACY CA 95304-5000
US
Need Ship Date:01/03/2027 Original Required Delivery Date:09/14/2027
CONTRACTOR FIRST ARTICLE TEST THE NUMBER OF UNITS SHOWN SIGNIFIES THE
TEST REQUIREMENT. SEE FAR CLAUSE 52.209-3 CITED IN SECTION A OF THIS
SOLICITATION FOR THE ACTUAL QUANTITY REQUIRED.
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0002 0000000000 EA 1.000
NSN/MATERIAL:0001S00000053
DELIVERY (IN DAYS):0030
THIS LINE ITEM SIGNIFIES THE FIRST ARTICLE TEST REQUIREMENT (FAT). SEE
CLAUSES FOR INFORMATION CONCERNING THE FAT REQUIREMENT. OFFERS THAT DO
NOT CITE A PRICE FOR THIS LINE ITEM SHALL BE EVALUATED UNDER THE
ASSUMPTION THAT THERE IS NO SEPARATE CHARGE FOR THE FAT. IN THE EVENT
THE FAT REQUIREMENT IS WAIVED, NO AWARD WILL BE MADE FOR THIS LINE ITEM.
THE NUMBER OF UNITS SHOWN APPEARS AS “1 EA”. THIS QUANTITY SIGNIFIES
THE TEST REQUIREMENT. OFFERORS WILL FIND THE ACTUAL QUANTITY REQUIRED
BY THE GOVERNMENT FOR THE FAT LINE ITEM PER FAR 52.209-3 OR 52.209-4 IN
SECTION A OF THIS SOLICITATION.
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
SPE4A7-26-T-579G
SECTION B
PR: PRLI: CONT’D
ACCEPTANCE POINT: ORIGIN
Need Ship Date:00/00/0000 Original Required Delivery Date:00/00/0000
SPE4A7-26-T-579G NSN/Part Number: 1560-01-525-3551 Quantity: 2 EA Purchase Request: 7017408741QTY: 2 Delivery: 282 days ADO
More opportunities from Department Of Defense → ASC SUPPLIER OPER AE AND AF DIV
Same awarding agency
