Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on April 17, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LCC Block Upgrade

Closed
FA8204-14-R-RFILCCUFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336419
New
Federal
Weapons Shipping Harness Refurbishment Blanket Purchase Agreement
Solicitation # N6278927Q0001
Solicitation N6278927Q0001 is a request for quotes to establish a multiple award Blanket Purchase Agreement (BPA) for the refurbishment of SSN 688 class weapon shipping harnesses to support waterfront submarines at SUBASE New London in Groton, Connecticut. The scope of work includes the complete disassembly, refurbishment of all parts, reassembly, NDT testing, painting, and weight testing of these safety-critical tactical handling gear in accordance with NAVSEA specifications and strict naval nuclear safety standards. The BPA will have a five-year period of performance from January 27, 2027, to January 26, 2032, with a total ceiling of 500,000 USD and a per-call limit of 100,000 USD. Individual requirements will be competed among BPA holders based on the most advantageous quote. Awards will be made based on best value, evaluating technical qualifications and the ability to meet schedules, past performance, and price. Offerors must provide at least three references from the last three years and a description of their property management system. The procurement is not a small business set-aside and is limited to sources capable of meeting specialized military design and safety standards. Quotations are due by 4:00 PM EST on December 3, 2026, and must be submitted electronically. Contractors are required to use the Wide Area Workflow system for invoicing and must comply with CMMC cybersecurity requirements and SAM registration.
Supply Of Shipbuilding Groton

POSTED

7 days ago

DEADLINE

in about 1 month
NAICS: 336419
DIBBS
FLANGE, PIPE
Solicitation # SPE7M4-27-T-0838
Solicitation SPE7M4-27-T-0838, issued by the DLA Weapons Support Fluid Handling Division, is a request for quotations for eight 5-inch pipe flanges (NSN 4730-01-313-2154). The procurement is conducted under full and open competition with a need ship date of April 6, 2027, and a final required delivery date of May 2, 2027. Delivery is set as FOB Origin, with the destination being DLA Distribution San Joaquin in Tracy, California. The items are designated as critical application items and must adhere to specific technical drawings and specifications, including MIL-PRF-20042G. The contract imposes strict quality and environmental standards, requiring the manufacturer's inspection system to comply with SAE AS9003 or ISO 9001. Sampling must follow MIL-STD-1916 or ASQ H1331, with a zero-nonconformance requirement for acceptance. Prohibitions are in place regarding the use of Class I ozone-depleting chemicals and the intentional addition of mercury. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while palletization must follow DLA requirement RP001. Administrative requirements include electronic invoicing via Wide Area WorkFlow (WAWF) and compliance with various FAR and DFARS clauses, including the Buy American Act and the Berry Amendment. Cybersecurity compliance is mandatory, specifically referencing CMMC Level 2 and DFARS 252.204-7012 for safeguarding covered defense information. Additionally, a price evaluation preference is available for certified HUBZone Small Business Concerns.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

8 days ago

DEADLINE

in 3 days
NAICS: 336419
DIBBS
CABLE ASSY, POSTNANG
Solicitation # SPE4A7-27-T-1016
Solicitation SPE4A7-27-T-1016 is a request for quotations issued by the DLA Weapons Support ASC Supplier Oper AE and AF Div for the procurement of 3,000 units of Cable Assy, Postnang (NSN 1450-01-657-4915). The required delivery date is April 30, 2027, with shipping to the DLA Distribution DDSF New Cumberland facility in Pennsylvania under FOB Origin terms. A critical constraint of this acquisition is that no approved Technical Data Package is currently available as the data is proprietary, and the item is subject to strict export controls under ITAR or EAR. Consequently, eligible offerors and their sources of supply must possess an approved US/Canada Joint Certification Program certification and DLA authorization to access the technical data. The contract mandates rigorous quality and safety standards, including destination inspection and acceptance based on zero-nonconformance sampling plans per MIL-STD-1916 or ASQ H1331. Packaging and marking must adhere to MIL-STD-129 and MIL-STD-2073-1E, with a strict prohibition on the use of mercury or mercury compounds in hardware and packaging. Administratively, the contractor must utilize the Wide Area WorkFlow system for invoicing and comply with various DFARS and FAR clauses regarding cybersecurity, including CMMC Level 2 and DFARS 252.204-7012. Additionally, the procurement is subject to the Buy American Act and the Berry Amendment, with price evaluation preferences available for certified HUBZone Small Business Concerns.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

8 days ago

DEADLINE

in about 5 hours
NAICS: 336419
DIBBS
NIPPLE, PIPE
Solicitation # SPE7M3-27-T-0303
Solicitation SPE7M3-27-T-0303 is a request for quotations issued by the DLA Weapons Support Fluid Handling Division for the procurement of 674 copper alloy pipe nipples, identified by NSN 4730011152648. The items must be manufactured in accordance with ASTM B687 and are designated as critical application items. The contract prohibits the use of Class I ozone depleting chemicals and explicitly excludes any items produced via additive manufacturing processes. Delivery is required within 164 days after order, with an original required delivery date of March 17, 2027, and a need ship date of April 6, 2027. Shipping is FOB Origin, with the destination for inspection and acceptance located at DLA Distribution San Joaquin in Tracy, California. The procurement is subject to various federal regulations, including the Buy American Act and the Berry Amendment. Packaging must comply with ASTM D3951 and MIL-STD-129, while palletization must follow DLA requirement RP001. Quality assurance is managed through Certificate of Conformance procedures per FAR 52.246-15. Invoicing and payment are to be processed electronically via the Wide Area WorkFlow system. The solicitation is open to full and open competition, with a specific price evaluation preference provided for certified HUBZone small business concerns. Administrative contact for this requirement is William Cain.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

8 days ago

DEADLINE

in 3 days

General Info

Agency

N/A

NAICS

336419 - Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts

Full Description

Show more
SOURCES SOUGHT SYNOPSIS: Launch Control Center (LCC) Block Upgrade Solicitation Number: Notice Type: Posted Date: FA8204-14-R-RFILCCU Sources Sought 17 April 2014 Synopsis: 1. NOTICE: This is not a solicitation but rather a Sources Sought Synopsis to determine potential sources for information and planning purposes only. 1.1. The purpose of this Sources Sought is to conduct market research to determine if responsible sources exist, to assist in determining if this effort can be competitive and/or a total Small Business Set-Aside. The proposed North American Industry Classification Systems (NAICS) Code is 336419 which has a corresponding Size standard of 1000. The Government will use this information to determine the best acquisition strategy for this procurement. The Government is interested in all small businesses to include 8(a), Service-Disabled Veteran-Owned, Hubzone, and Women-Owned small business concerns. The government requests that interested parties respond to this notice if applicable and identify your business size status to the identified NAICS code. Additionally, please provide any anticipated teaming arrangements, along with a description of similar services offered to the Government and to commercial customers for the past three years. Any responses involving teaming agreements should delineate between the work that will be accomplished by the prime and the work accomplished by the teaming partners. 1.2. This notice of intent is not a request for competitive proposals. The Air Force will not pay for either the effort or the associated costs to respond, or for any information provided. A Determination by the Government not to compete this proposed contract based upon responses to information received will be normally considered solely for the purpose of determining whether to conduct a competitive procurement. 2. Program Details: 2.1. Background The LCC Block Upgrade will consist of replacing several LCC systems with either modified Commercial off-the-shelf (COTS) items and/or contractor developed items based on system requirements. The LCC Block Upgrade consists of the Oxygen Regeneration Unit (ORU), the Weapon System Printer, the Voice Communication Control Panel (VCCP), and the Journal Memory Loader (JML). It is intended for these programs to follow a similar development and fielding schedule that will be discussed later in this document. 2.1.1. The ORU system operates in an enclosed environment during a nuclear event and must be capable of removing carbon dioxide and introducing oxygen without access to the outside environment. 2.1.2. The printer is used in the Rapid Execution and Combat Targeting (REACT) subsystem, and is defined to be a Type I device in accordance with S-133-30001. There is a single printer for the system which is shared by both the weapon system control element (WSCE) and the rapid message processing element (RMPE) processors. The WSCE processor receives messages addressed to the printer from the WSCE internal print function, and from the primary and secondary higher authority communications (HAC)/RMPE, over a separate digital interface. 2.1.3. The VCCP provides the capability to control and monitor all voice communications at the LCC . The CI consists of two Voice Control Panels (VCP), one for each operator position, for independent selection and control of available voice circuits; and one UHF Control Panel (UCP) for shared control of the UHF radio. 2.1.4. The JML Disk Drive Assembly consists of two standard 3.5" diskettes drives housed inside the nuclear hardened JML chassis. The diskette drives are becoming unsustainable; it is the intention of the program office to replace the Disk Drive Assembly with a form, fit, and function assembly utilizing the existing JML chassis. A solid state memory solution is preferred, however, other options will also be considered. 3. Physical and Functional Interfaces: please see the attached specifications for the legacy interface and size requirements. 4. Effort: This effort officially designated as the LCC Block Upgrade will be to produce and install a minimum of 45 LCC Block Upgrade kits which will include a Printer, VCCP, ORU, and a JML replacement. Additionally this effort will require that trainer and test facilities be updated to reflect the Weapon System kits, however, these updates might not necessarily have the same requirments as the operational LCC kits. The installations will take place at six locations: Minot AFB, ND, F.E. Warren AFB, WY, Malmstrom AFB, MT, Colorado Springs, CO, Hill AFB, UT, and Vandenburg AFB, CA. 5. Information Requested. 1. Respondents must have an established, mature capability that meets (or can be modified to meet) or exceeds the requirements for the LCC Block Upgrade. Please detail your ability to meet this requirement. 2. Describe your experience installing, maintaining, and testing equipment in extreme weather conditions and/or at remote locations. 3. Please describe your experience in engineering, maintaining, troubleshooting and integrating DoD-approved subsystems. 4. Describe your ability to manage sub-contractors, in terms of schedule and performance. 5. This effort will include installations in the field. Installation teams will need to have the appropriate clearances to enter facilities. Please describe past efforts, programs, and/or experiences obtaining the needed clearances. 6. What is your estimated timeline from contract award to installation completion? 7. Please provide any recommendations, questions and/or concerns. General Questionnaire 1. If you plan to be the integrator, what benefit is there to having you as the integrator? 2. How would you ensure that small business are considered for subcontract work? 3. What access do you have to government shared databases or how would you recommend to report and provide system data on a regular basis to the program office? 4. What contract type(s) would you recommend is appropriate for this effort? 5. What potential risks do you see in terms of cost, schedule, and performance specifically addressing how these programs are combined into a single "Block Upgrade"? Specific Questionnaire JML 1. What type of media do you propose for the replacement Disk Drive Assembly? 2. Assuming your company is not manufacturing the actual replacement hardware, how will you ensure the replacement Disk Drive Assembly does not contain any compromised firmware? 3. Assuming the replacement Disk Drive Assembly does not directly integrate into the JML chassis, what level of modification to the chassis / replacement Disk Drive Assembly do you expect? 4. How do you intend to ensure the replacement Disk Drive Assembly meets all reliability requirements, including: design life, mean time between corrective maintenance actions, and mean time to repair? 5. Assuming a COTS product will be integrated into your solution, how do you intend to ensure your solution meets design requirements as described in S-133-00200H-PTI section 3.3? Do you foresee any waivers being required? 6. What level of testing do you propose to ensure the replacement meets Electromagnetic Interference / Electromagnetic Compatibility requirements? 7. What level of testing do you propose to ensure the replacement meets transportation shock and vibration requirements? 8. What level of testing do you propose to ensure the replacement meets altitude requirements? 9. What level of testing do you propose to ensure the replacement meets temperature / humidity requirements? 10. How will you demonstrate that the replacement meets nuclear shock and vibration survivability requirements for Launch Control Center environments? 11. How will you demonstrate that the replacement meets Electromagnetic Pulse survivability requirements for Launch Control Center environments? 12. How will you demonstrate that the replacement meets nuclear radiation survivability requirements for Launch Control Center environments? 13. What level of testing do you propose on the lot of replacements procured (including spares) to ensure nuclear survivability requirements will be met for all items? 14. The image for the RMP IPL is stored in a 2 diskette solution (due to memory availability). Do you foresee any integration issues with the RMP assuming increased memory capability in the replacement Disk Drive Assembly? 15. What design considerations will be made for the trainer system JML / Disk Drive Assemblies? 16. What form of training documentation will be provided with the replacement? 17. What is your strategy for operator and maintenance Technical Order (TO) updates? 18. What level of testing do you propose to ensure the JML fault isolations and error codes still function properly on the operator console and the maintenance test sets? ORU 1. What are the minimum and maximum O2 production rates: volume/unit time, volume/cartridge (candle, canister, etc)? a. What are the minimum and maximum CO2 production rates: volume/unit time, volume/cartridge (candle, canister, etc)? b. What is the method of O2 production - is it active or passive, does it have any power requirements? c. What is the method of CO2 removal - active or passive, does it have any power requirements? d. What is the shelf life of the product? e. What is the required maintenance of the product? f. What is repairable or nonrepairable? What is the availability of repair parts? 2. What size models do you offer? a. If your current model offered is larger than our size limitations, is it scalable? b. Is it adaptable to our application? c. If so, how much development work would be required? 3. How would you dispose of the current sealed KO2 canisters? 4. How much heat is introduced to the surrounding environment by the proposed system? VCCP 1. Are there digital alternatives to the current technology? 2. What are possible solutions to "normalize" the volume on the headset to account for both low and high volume issues? 3. Do you have the capability to modify or customize a case to fit in the current Panel location? 4. What COTS equipment do you have that could work as a possible replacement solution? 5. Would development work be needed to make this solution work? If so, how much? Printer 1. Do you have any current models that would work as a replacement solution? 2. Would this replacement require modification to fit into the current printer location? If so, how much? 3. Are there alternative printer technologies that might be a better solution than the current technology? 7. Subject to the Government's consideration, a viable source, not already qualified to provide the requisite services should submit a concise and program specific response presenting sufficient information to substantiate that they have demonstrated: - The capability to produce the items in section 2.1. - The ability to acquire the infrastructure, hardware, software, tools, staff, etc. required for the production of the items in section 2.1. - The ability to provide engineering support and necessary training of associated equipment and hardware. - Experience with generating, editing, reviewing, and validating Drawings, Process Orders (PO's), Operating Instructions (OI's), Technical Orders (TO's) and Time Compliance Technical Orders (TCTO's). 8. Contracting Office Information. Responses must be submitted by 6 May 14 to: Bruce Richeson ATTN: Bruce Richeson, AFNWC/PZBA Department of the Air Force, Air Force Materiel Command, Air Force Nuclear Weapon Center, 6014 Dogwood Ave (Bldg 1258), Hill AFB, UT, 84056-5816 Or, Bruce.Richeson@us.af.mil No phone or FAX requests will be accepted.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS