Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on March 19, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LCLS-II Cryo Install - Tank Farm Foundation

Closed
0000285996Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Agency

N/A

NAICS

238110 - Poured Concrete Foundation and Structure Contractors

Place of Performance

SLAC National Accelerator Laboratory 2575 Snad Hill Road Menlo Park, CA 94025, MENLO PARK, CA, 94025, USA

Set-Aside

8A

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Alberto RochaSr. Subcontract Administrator

Full Description

Show more
Sources Sought for consideration of capability and capacity to provide construction services to: LCLS-II Cryo Install - Tank Farm Foundation Provide construction services for: GHe Tank and LN2 Dewar (aka LN2 Tank) Foundations per attachments 1, 2, 3 and the notes below. - 1. Services shall be in accordance with attachments 5 and 6 as referenced / required by this document and Attachments 1, 2 and 3. - 2. All steel exposed to the weather shall be galvanized. Grind off galvanize at welds, repair at exposed welds. - 3. As indicated on 79120-0050 (Attachment 3), the 28', 14', 60" and 20" GHe Tank dimensions shall be considered verified. - 4. As indicated on 79120-0050, the 45'-8", 16', 25.125", 20" and 16" LN2 Tank dimensions shall be considered coordinated / verified. The fixed and floating saddle locations shall be considered verified. - 5. Services shall include disposal of excavated compacted fill and rock. - 6. Services exclude GHe and LN2 Tank Installation and the associated materials, including - a. Shim plates (i.e. the plates between the tank saddle and 1" shear plates) - b. Non-shrink grout beneath the tank saddles - c. Plate washers and double nuts above the tank saddle - d. Welds between the 1" shear plates and the tank saddle (GHe Tanks, LN2 Tank Fixed Saddle) - e. Welds between the 1" shear plates and shims (LN2 Tank Floating Saddle) - f. 2.5" Shear Blocks (LN2 Tank Floating Saddle) - g. Welds between the shear plates and the shear blocks (LN2 Tank Floating Saddle) Tank Farm Pipe Support, LN2 Fill Station and GHe Fill Stations Foundations per attachment 1 and the notes below. - 1. Contractor shall provide twenty three (23) foundations per Detail B2 in Attachment 1. A specific location for each footing will be provided by the Owner prior to the start of work. - 2. The ground shall be excavated / prepared and the foundations constructed / installed in accordance with attachments 5 and 6. - 3. All materials shall be provided by the Contractor. - 4. A Third Party Inspection Agency (contracted by the Owner) shall perform required special inspections. Contractor shall inform agency of installation schedule and make the provisions necessary for inspection. - 5. Services shall include disposal of excavated compacted fill and rock. Tank Farm grounding ring per attachment 4 in accordance with attachments 5 and 6 and the notes below. - 1. Grounding ring shall be #4/0 bare ground cable buried 36" below grade. Services shall include connection of grounding ring to existing grounding conductor buried below the trench. - 2. Connections between grounding / bonding conductors shall be irreversible (crimped or cad welded). - 3. Provide two pig tails, no less than 5', at the centerline of the road trench (one at the trench and one at the north wall of the tank farm). - 4. All other grounding work is excluded. - 5. Grounding conductors, conduits, bus bar and jumpers shall be installed to miss all footings and existing buried conduits. - 6. Services shall include disposal of excavated compacted fill and rock. Aggregate base placement in accordance with attachment 1 and the notes below.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS