Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Energy was posted on December 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LCLS-II-HE High Power Radio Frequency (HPRF) Penetration Installation

Closed
Federal
Submission Closed
Solicitation #
RFP360237

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the installation of the LCLS-II-HE High Power Radio Frequency (HPRF) Penetration at SLAC National Accelerator Laboratory, operated by Stanford University for the Department of Energy. It is solicited through a Request for Proposal (RFP) issued on December 1, 2025, with amendments extending the proposal deadline to December 5, 2025, and scheduling a site walk for December 3, 2025. The procurement emphasizes a best value trade-off selection process, evaluating proposals based on technical merit, past performance, safety, schedule, and price, with no fixed weights assigned. Offerors are required to submit separate technical and business proposals, with detailed instructions on proposal formatting, submission deadlines, and required attachments, including certifications, insurance, wage determinations, and past performance questionnaires. The scope of work involves installing cable and waveguide penetrations, shield blocks, support structures, conduit bundles, and associated components during a scheduled Long Down Time in 2026. The work must adhere to detailed engineering drawings, technical specifications, and quality assurance procedures, including inspections, testing, and special process certifications. The contract includes comprehensive clauses covering FAR and DOE-specific requirements, safety protocols, site access, security, and environmental standards. It mandates strict compliance with SLAC’s safety and security policies, including badge access, export controls, and handling of government-furnished property. Payment will be made via monthly invoices, with detailed certification and documentation requirements, and the contract terms specify the roles of designated personnel, quality control standards, and the order of precedence among contract documents. Overall, the agreement establishes a structured, safety-conscious, and technically rigorous framework for executing the installation during the specified performance period, with emphasis on compliance, safety, and quality assurance.

General Info

NAICS

54138

Place of Performance

Menlo Park, CA, 94025, USA

Set-Aside

NONE

Documents

34
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this first9 pages · contract-document
High
PDF, High priority: read this first7 pages · contract-document
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first3 pages · special-terms-and-conditions
High
PDF, High priority: read this first1 page · acknowledgement-form
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this first3 pages · past-performance
High
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this first4 pages · reps-and-certs-supplement
High
PDF, High priority: read this first3 pages · rfp
High
PDF, High priority: read this first1 page · subcontract-form
High
PDF, High priority: read this first1 page · rfp
High
PDF, High priority: read this first1 page · sow
High
PDF, High priority: read this first1 page · sow
High
PDF, High priority: read this first6 pages · rfp
High
PDF, High priority: read this first8 pages · rfp
High
PDF, High priority: read this first17 pages · rfp
High
PDF, High priority: read this first3 pages · specifications
High
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this first4 pages · specifications
High
PDF, High priority: read this first1 page · general-terms-and-conditions
High
PDF, High priority: read this first1 page · representations-and-certifications
High
PDF, High priority: read this firstwage-determination
High
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this first4 pages · drawing
High
PDF, High priority: read this first4 pages · specifications
High
PDF, Low priorityother
Low
PDF, Low priority1 page · list-of-attachments
Low
PDF, Low priority1 page · request-for-clarifications
Low
PDF, Low priority1 page · special-notice
Low

Read all 34 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Dec 5, 2025 to Dec 6, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Dec 6, 2025 to Dec 9, 2025. The notice description changed.

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Slac National Accel Labor -Doe Contractor
Contacts1 person available
OfficeMenlo Park, CA, 94025, USA

Full Description

Show more

Amendment 4:


Proposal due date extended to 5:00pm Pacific Time, Monday, 12/08/25.


Amendment 3:


Attached 'HPRF LDT Crane Mobilizations' schedule.


Amendment 2: 


In order to accommodate a site walk for Wednesday, 12/03/25, RFP 360237 is hereby amended as follows:


•             Request for Clarifications due 5:00pm Wednesday, 12/03/25


•             Proposals due 5:00pm Friday, 12/05/25


Contact Mattia Checchin at Sign up to see this detail, Sign up to see this detail to schedule a site walk.


++++++++++


Amendment 1:  Added Section K and its one attachment.


SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions.


You are invited to submit a Firm-Fixed-Price / Time and Materials/Labor Hour proposal in accordance with Line Items in Section B of this RFP and the proposal preparation requirements and other applicable provided documents. Your proposal must be received no later than Thursday, December 4, 2025, 5:00pm Pacific Time, and be valid for 90 days after submission. Submissions can be provided by electronic files in PDF or any digital format.


Please refer to the attached RFP_360237 for complete details.

More opportunities from Department Of Energy → Slac National Accel Labor -Doe Contractor

Same awarding agency

NAICS: 334516
Federal
SPEAR Beam Position Monitors (BPMs)
Solicitation # SLAC_RFP369851_(AT)
SLAC National Accelerator Laboratory, operated by Stanford University for the Department of Energy, is soliciting proposals for the procurement of 104 Beam Position Monitors (BPMs) to support the orbit stability upgrade project at the SPEAR storage ring. This is a Firm Fixed Price (FFP) subcontract for off-the-shelf commercial items that must be configured to meet specific technical requirements, including support for 45-degree button geometry and the provision of turn-by-turn, 10 kHz, and 10 Hz data streams. The scope of work includes the delivery of the BPMs, a Fast Orbit Interlock System, a Fast Orbit Feedback System, and two on-site visits for installation, training, and commissioning. There is no set aside used for this procurement. Proposals must be submitted in two volumes—Technical and Business—by December 4, 2026, at 5:00 PM PT, and must remain valid for 90 days. The selection process follows a Lowest Price Technically Acceptable (LPTA) model, evaluating technical capabilities such as orbit calculations, automatic calibration, and a minimum two-year warranty. Delivery is required in stages, with 56 BPMs due within seven months of award and the remainder, including fast orbit feedback and interlock applications, due within eight months. Offerors must provide price certifications, financial standing documentation (such as a Dun and Bradstreet report with a SER Score of 6 or lower), and complete all required representations and certifications.
Analytical Laboratory Instrument Manufacturing

POSTED

9 days ago

DEADLINE

in 6 days
View Details
NAICS: 3333
Federal
DC Power Supply
Solicitation # SLAC_369019_DCPowerSupply
SLAC National Accelerator Laboratory, operated by Stanford University for the Department of Energy, is soliciting quotes for one modular, remotely controllable DC power supply system for detector electronics. The system must provide stable, low-noise, programmable DC power (30-60 VDC) supporting up to 13.5 A and 650 W per output, with capacity for up to 16 independently controllable outputs. Key technical requirements include Ethernet-based remote monitoring, SNMP support for SLAC controls integration, a local configuration interface, and a compact form factor (preferably 3U height and 450 mm depth). The system must be air-cooled, compatible with standard 19-inch racks, and operate on 100-240 VAC mains power. The source selection will be based on the Lowest Price Technically Acceptable (LPTA) method, evaluating the ability to meet technical specifications, past performance, and delivery schedules. An acceptable lead time is within 30 weeks after the purchase order is issued. Quotations are due by November 30, 2026, and must include a price, lead time, Buy American Act certification, and a completed Representations and Certifications Rider. The resulting award will be a fixed-price purchase order with NET-30 payment terms. All subcontractors must be registered in SAM.gov. There is no specified set-aside status for this procurement.
Commercial and Service Industry Machinery Manufacturing

POSTED

10 days ago

DEADLINE

in 2 days
View Details
NAICS: 32599
Federal
SLAC_NOV2026_CHEMICAL_INVENTORY_SYSTEM (CIS)
Solicitation # SLAC_NOV2026_CHEMICAL_INVENTORY_SYSTEM_(CIS)
The SLAC National Accelerator Laboratory, operated by Stanford University for the Department of Energy, is seeking information through a Request for Information (RFI) for a web-based Chemical Inventory System (CIS). The system is intended to serve as a comprehensive tool for managing both hazardous and non-hazardous laboratory inventory, ensuring compliance with DOE and California state regulations, including the Hazardous Materials Business Plan (HMBP) and the California Environmental Reporting System (CERS). Key functional requirements include point-of-use inventory tracking, SDS management in PDF format, and the ability to bar-code containers on-site with a scan-out function for disposal. The system must also support GHS Pictograms, secondary labeling per OSHA Hazard Communication requirements, and provide customizable notifications for expiring chemicals. The evaluation process focuses on a scoring matrix where functionality is rated as Does Not Meet, Meets, or Exceeds. Vendors are required to provide pre-recorded demonstrations covering user experience and container information, as well as documentation regarding IT and cybersecurity approvals such as SOC 2 Type II, ISO 27001, or FedRAMP. Additionally, the system must be capable of tracking small business procurement to satisfy DOE Affirmative Procurement guidelines. There is no set aside used for this solicitation. The RFI process includes a deadline for responses by January 9, 2027, and requires that any future subcontractor provide an implementation plan within 90 days of award, with bi-annual updates.

POSTED

10 days ago

DEADLINE

in about 1 month
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS