Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lemen Avenue Utility Improvements Project

Closed
CIP 26-15State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves comprehensive wastewater infrastructure upgrades for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of 20-inch ductile iron force main and significant improvements to the Morgans Branch Pumping Station. Key station upgrades include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers and manholes, with a total project estimate of 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MBE/WBE compliance, including an EPA MBE participation goal of 10.9 percent. Bidders must provide a completed EJCDC C-410 Bid Form, bid security, and evidence of authority to sign. The successful contractor will be required to provide performance and payment bonds and maintain proof of insurance. Performance is subject to liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payment terms are set at thirty days after presentation to the owner, and the work must adhere to strict technical standards, including AWS D1.2 for welding and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 18 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing and restoration, as well as the relining, modification, or replacement of small and large diameter steel and ductile iron pipes and associated supports. Additional requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and the replacement of motor control center components. The project also encompasses electrical and instrumentation improvements, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is specifically targeting DBE, MBE, WBE, and SBE subcontractors, with a focus on services such as lead abatement, metals fabrication, painting, coatings, and trucking. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions to these documents must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The Lemen Avenue Utility Improvements Project (CIP 26-15) is a solicitation issued by the City of Woodland, California, for comprehensive utility installation and road restoration. The scope of work includes the installation of approximately 305 feet of water pipe with laterals and one fire hydrant, the relocation of two meter services, and the installation of approximately 660 feet of sewer pipe featuring three manholes and two cleanouts. Additionally, the project requires the installation of approximately 550 feet of storm drain pipe, four manholes, and one curb inlet, along with the replacement of an existing inlet and connection to a vault style manhole. Surface improvements consist of a 2 inch mill and overlay of approximately 24,900 square feet and the restoration of traffic striping. The solicitation was posted on September 23, 2026, with a response deadline and bid opening date of October 13, 2026. Project documentation includes detailed technical plans, bidding instructions, and general construction conditions. Through subsequent addenda, the City of Woodland extended the project completion and performance period from 50 to 60 days and provided updated bid schedules with increased quantities for 8 inch PVC pipe and 45 degree fittings. Guillermo De La Torre serves as the primary point of contact for this SLED organization project.

General Info

City of Woodland utility installation and road restoration project due October 13, 2026.

Documents

4

CIP 26-15 Plans

PDF, High priority: read this firstspecifications
High

Lemen Avenue Utility Improvements Project (CIP 26-15)

PDF, High priority: read this firstifb
High

Lemen Avenue Utility Improvements Project (CIP 26-15) - Addendum No. 1

PDF, High priority: read this firstamendment
High

Lemen Avenue Utility Improvements Project (CIP 26-15) - Addendum No. 2

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Woodland
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → City of Woodland
Office AddressN/A
Contacts

Full Description

Show more
Installation of approximately 305 feet of water pipe including laterals, 1 fire hydrant, and relocation of 2 existing meter services; Installation of approximately 660 feet of sewer pipe including laterals, 3 manholes, 2 cleanouts, connecting to an existing manhole, and removal of an existing manhole; Installation of approximately 550 feet of storm drain pipe, 4 manholes, 1 curb inlet, replacement of an existing inlet with a curb inlet, and connecting to an existing vault style manhole; 2” mill and overlay of approximately 24,900 square feet and restoration of traffic striping.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS