Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on September 7, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lemon Dam High Pressure Gate Modification

Awarded
R16PS00929Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 10 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Bureau of Reclamation, Upper Colorado Region, is seeking a small business contractor for the Lemon Dam High Pressure Gate Modification project located near Durango, Colorado. This fixed-price construction contract involves the modification and repair of four high-pressure gates and hoists, including the installation of new composite self-lubricating leaf seats, bronze frame seats, and new hydraulic components. The scope of work includes surface preparation and coating of the gates and hoists, the fabrication and installation of a steel intake bulkhead gate, and optional refurbishment of four trashracks. The project requires a 16-month performance period following the notice to proceed, with work scheduled to begin after summer reservoir releases. The contractor must manage water diversion and maintain river flow through a specific hose and pumping system during the isolation of the outlet works. The estimated value of the requirement ranges between 1 million and 5 million dollars under NAICS code 237990. This is a total small business set-aside conducted under FAR Part 36 and FAR Part 15.

General Info

Contract Value

$1,313,625

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Lemon Dam, 15 miles from Durango, CO, DURANGO, CO, 81301, USA

Set-Aside

NONE

Award Issued Date

Documents

23

519-D-93.pdf

PDF

519-D-94.pdf

PDF

Amendment_004_SF_30.pdf

PDF

Lemon_Dam_High_Pressure_Gate_Modification_Amendment_001_SF_30.pdf

PDF

PRICE_SCHEDULE_for_Amendment_4.docx

DOCX

SF_30_Amendment_003.pdf

PDF

site_visit_sign_in_sheet_7.6.16.pdf

PDF

Solicitation_Questions_%281%29.docx

DOCX

Solicitation_Questions_and_Answers_7.19.2016.docx

DOCX

Sol_R16PS00929_Amd_000002_SF_30.pdf

PDF

SpecificationLemonDam_revised_7.5.16.pdf

PDF

Summary_of_changes_Ammendment_001.pdf

PDF

Tab_09_-_Synopsis_Lemon_Dam_High_Pressure_Gate_Modification_%284%29.docx

DOCX

Tab_09_-_Synopsis_Lemon_Dam_High_Pressure_Gate_Modification.docx

DOCX

Tab_13_-_ATT_1_Wage_Determination_R16PS00929.pdf

PDF

Tab_13_-Att_2_Specification_Lemon_Dam_High_Pressure_Gate_Modification_R16PS00929.pdf

PDF

Tab_13_-R16PS00929_1442.pdf

PDF

Tab_14_-_Attachment_3_Performance_Questionnaire_R16PS00929.docx

DOCX

Tab_14_-_Attachment_4_Subcontract_Worksheet_R16PS00929.docx

DOCX

Tab_14_-Lemon_DamR16PS00929_Solicitation_Vol_I_7.5.16.pdf

PDF

Tab_14_-Lemon_DamR16PS00929_Solicitation_Vol_I_7.7.16.docx

DOCX

Tab_14_-Lemon_DamR16PS00929_Solicitation_Vol_I.pdf

PDF

TrashRackPhotos.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 28, 2016 to Jul 26, 2016. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Denver Federal Center
Contacts1 person available
OfficeDENVER, CO, 80225, USA
Office AddressDENVER, CO, 80225, USA
Contacts
Melissa CouvretteContract Specialist

Full Description

Show more
See attachments for Amendment 4 See attachments for Amendment 3 See attachments for Amendment 2 This amendment required to post the full solicitation package (see attached documents) R16PS00929 Lemon Dam High Pressure Gate ModificatioSYNOPSIS R16PS00929 Lemon Dam High Pressure Gate Modification The Bureau of Reclamation, Upper Colorado Region, has a requirement to replace the gate seats and perform coating repairs to the guard gates and appurtenant features of the Lemon Dam outlet works. Lemon Dam is located on the Florida River approximately 16 miles Northeast of Durango, Colorado in La Plata County. A. The work will begin after summer reservoir releases have been complete. This ranges from 9/1/2016 to 9/30/2017. All work as described in this solicitation shall be completed 16 months after notice to proceed B. Fabricate and provide a steel intake bulkhead gate. C. Remove, refurbish, the four trashracks that are located in the intake structure below the water surface of the reservoir. Reinstall the trashracks after the bulkhead has been removed. Refurbishment of the trashracks also referred to trashracks repair and trashracks coating the Section B is optional and is at the discretion of the CO. If the CO elects not to repair and coat the trashracks, the trashracks will remain below the surface of the reservoir and will not be exposed to the atmosphere. D. Isolate the main outlet works by setting the contractor provided bulkhead in the intake structure, and drain the inlet tunnel. E. Water will be released through the bulkhead to maintain river flow. There will be two hoses plumbed through the bulkhead that connect into a 12-inch hose. The 12-inch will run the length of the upstream tunnel which is approximately 1000 -feet. There will be a regulating valve adjacent to the high pressure gates that will control the releases of water through the tunnel. There will be times such as during the set-up an disassembly of the hose system that releases cannot be made through the bulkhead; releases will be made by pumping no less than 3 cubic feet per second into the stilling basin to maintain constant releases from the reservoir to the Florida River. F. The tunnel wyes upstream of the 4 - 2'- 3" x 2'- 3" High Pressure Gates. Water flow in the tunnel will be diverted to flow through gates 1 and 3 when work is being performed on gates 2 and 4, and the water will be diverted to flow through gates 2 and 4 when work is being performed on gates 1 and 3. G. Modify and repair 4 - 2'- 3" x 2'- 3" High Pressure Gates and hoists. This includes but is not limited to: 1. Furnishing and installing new composite self-lubricating high-pressure gate leaf seats and new bronze frame seats. 2. Performing surface preparation and applying coatings on the four high-pressure gate leaves and hoists. 3. Performing surface preparation and applying coatings on the four high-pressure gates. 4. Installing new hydraulic valves, pipe, and fittings at each hoist. H. Test the four high pressure gates under the equivalent pressure of lake head. This will be performed without charging the tunnel between the bulkhead and the high pressure gates. Pressure can be placed upstream side of the gates by installing an expansion bulkhead downstream of the wye. I. Close the High Pressure gates and fill the intake tunnel, and remove the bulkhead for the intake structure. J. Perform operational tests on all four high pressure gates. It is anticipated the contract will be a fixed price construction contract. This is a total small business set aside. The North American Industry Classification System Code (NAICS) is 237990 Other Heavy and Civil Engineering Construction with a small business size standard of $33.5M. The estimated magnitude of the requirement in terms of physical characteristics and estimated range is between $1,000,000 and $5,000,000. Anticipated award is for a contract with an estimated 16 month duration. Request for Proposal No. R16PS00929, using procedures prescribed by FAR Part 36 - Construction Architect-Engineer Contracts in conjunction with FAR Part 15 - Contracting by Negotiation, will be posted shortly after transmission of this synopsis. All responsible sources may submit a proposal which shall be considered by the agency. An electronic copy of the solicitation will be available within the next few weeks at Federal Business Opportunities www.fbo.gov or directly at FedConnect https://www.fedconnect.net/FedConnect/Default.htm. Once logged into the "FedBizOpps" web-site, type in the Solicitation Number "R16PS00929" in the Keyword/Solicitation # field. A site visit will be held. The date and details will be provided in Section L of the solicitation and on the website https://www.fbo.gov/ Submit all questions in writing to contact@example.gov. Only questions submitted in writing will be addressed during the site visit and subsequent amendment. Prospective offerors must be registered and must maintain an active registration in the System for Award Management database found at http://www.sam.gov. The Bureau of Reclamation, Upper Colorado Region, has a requirement to construct an approximate 74-acre foot regulating reservoir and appurtenant structures. The work is located on Orchard Mesa, approximately 5 miles southwest of Grand Junction, Colorado in Mesa County. A. The work will begin after summer reservoir releases have been complete. This ranges from 9/1/2016 to 9/30/2017. All work as described in this solicitation shall be completed 16 months after notice to proceed B. Fabricate and provide a steel intake bulkhead gate. C. Remove, refurbish, the four trashracks that are located in the intake structure below the water surface of the reservoir. Reinstall the trashracks after the bulkhead has been removed. Refurbishment of the trashracks also referred to trashracks repair and trashracks coating the Section B is optional and is at the discretion of the CO. If the CO elects not to repair and coat the trashracks, the trashracks will remain below the surface of the reservoir and will not be exposed to the atmosphere. D. Isolate the main outlet works by setting the contractor provided bulkhead in the intake structure, and drain the inlet tunnel. E. Water will be released through the bulkhead to maintain river flow. There will be two hoses plumbed through the bulkhead that connect into a 12-inch hose. The 12-inch will run the length of the upstream tunnel which is approximately 1000 - feet. There will be a regulating valve adjacent to the high pressure gates that will control the releases of water through the tunnel. There will be times such as during the set-up an disassembly of the hose system that releases cannot be made through the bulkhead; releases will be made by pumping no less than 3 cubic feet per second into the stilling basin to maintain constant releases from the reservoir to the Florida River. F. The tunnel wyes upstream of the 4 - 2'- 3" x 2'- 3" High Pressure Gates. Water flow in the tunnel will be diverted to flow through gates 1 and 3 when work is being performed on gates 2 and 4, and the water will be diverted to flow through gates 2 and 4 when work is being performed on gates 1 and 3. G. Modify and repair 4 - 2'- 3" x 2'- 3" High Pressure Gates and hoists. This includes but is not limited to: 1. Furnishing and installing new composite self-lubricating high-pressure gate leaf seats and new bronze frame seats. 2. Performing surface preparation and applying coatings on the four high-pressure gate leaves and hoists. 3. Performing surface preparation and applying coatings on the four high-pressure gates. 4. Installing new hydraulic valves, pipe, and fittings at each hoist. H. Test the four high pressure gates under the equivalent pressure of lake head. This will be performed without charging the tunnel between the bulkhead and the high pressure gates. Pressure can be placed upstream side of the gates by installing an expansion bulkhead downstream of the wye. I. Close the High Pressure gates and fill the intake tunnel, and remove the bulkhead for the intake structure. J. Perform operational tests on all four high pressure gates. It is anticipated the contract will be a fixed price construction contract. This is a total small business set aside. The North American Industry Classification System Code (NAICS) is 237990 Other Heavy and Civil Engineering Construction with a small business size standard of $33.5M. The estimated magnitude of the requirement in terms of physical characteristics and estimated range is between $1,000,000 and $5,000,000. Anticipated award is for a contract with an estimated 16 month duration. Request for Proposal No. R16PS00929, using procedures prescribed by FAR Part 36 - Construction Architect-Engineer Contracts in conjunction with FAR Part 15 - Contracting by Negotiation, will be posted shortly after transmission of this synopsis. All responsible sources may submit a proposal which shall be considered by the agency. An electronic copy of the solicitation will be available within the next few weeks at Federal Business Opportunities www.fbo.gov or directly at FedConnect https://www.fedconnect.net/FedConnect/Default.htm. Once logged into the "FedBizOpps" web-site, type in the Solicitation Number "R16PS00929" in the Keyword/Solicitation # field. A site visit will be held. The date and details will be provided in Section L of the solicitation and on the website https://www.fbo.gov/ Submit all questions in writing to contact@example.gov. Only questions submitted in writing will be addressed during the site visit and subsequent amendment. Prospective offerors must be registered and must maintain an active registration in the System for Award Management database found at http://www.sam.gov.

More opportunities from Department Of The Interior → Denver Federal Center

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS