Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Leon Housing Water Consolidation Project

Closed
20260825099State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of $16,690,000. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a substantial completion timeline of 560 calendar days. Bidders must provide a bid bond using form EJCDC C-430 and submit required MWBE documentation, including a Good Faith Efforts Form and Table A. The project is administered by Willis Engineers, who serve as the Owner's Representative. Payment is processed via Applications for Payment, with payments becoming due 30 days after presentation to the owner. Technical standards for the work include compliance with AWS D1.2 for welding, NEMA standards for motors, and ASTM C 1093 for masonry testing.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to motor control center components, and the installation of new instrumentation, electrical systems, and slide gates. Key deliverables for the project include lead abatement, metals fabrication, painting and coatings, concrete resurfacing, and the installation of FRP reinforcing systems and access hatches. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond premiums reimbursed by Garney Pacific. Interested parties must submit their quotes, including their bond rate and any redlines to standard subcontract forms, by November 17, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of dual 14 to 16-inch diameter HDPE DR 11 pipelines from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station featuring a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on DBE participation. Bids are due by 2:00 PM on October 29, 2025. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 7 hours ago

DEADLINE

in about 18 hours

AI Contract Overview

Show more

The Leon Housing Water Consolidation Project, managed by the Coachella Valley Water District, aims to consolidate four subsumed water systems—Leon Housing, Duran's Farms, Villa de Josue, and Oscar Cruz—into the district's receiving system. The scope of work includes the installation of approximately 7,400 linear feet of 12-inch potable water mains, 220 linear feet of 24-inch steel casing for jack and bore operations, and 2,210 linear feet of 2-inch pipelines equipped with meters and backflow devices. Additionally, the project requires 6-inch diameter piping to connect water mains to 15 fire hydrants or backflow preventors, along with the installation of various appurtenances such as blow-off assemblies and valves. The total estimated contract value is 6,634,954 dollars, which includes a 10 percent change order contingency. Technical specifications mandate the use of ductile iron and PVC piping, resilient-seated gate and butterfly valves, and specific concrete and masonry standards for thrust blocks and manholes. The contractor is responsible for comprehensive site activities, including dewatering, trenching, hydrostatic testing, and disinfection of piping. Environmental compliance is critical, requiring adherence to the Mitigation Monitoring and Reporting Program and the federal Endangered Species Act. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a construction completion deadline of December 31, 2028. Required security includes performance and payment bonds equal to 100 percent of the contract price, and bidders must comply with prevailing wage laws and California Air Resources Board certifications.

General Info

Coachella Valley Water District seeks bids for Leon Housing Water Consolidation by September 2026.

Documents

25

Agreement No. D2202070 Amendment - Drinking Water Construction Grant

PDF, High priority: read this firstamendment
High

Appendix E - Environmental: Mitigation Monitoring and Reporting Program

PDF, High priority: read this firstsow
High

Sect 03 30 00 Concrete Specifications

PDF, High priority: read this firstspecifications
High

Section 10 10 10 - Utility Marker Post

PDF, High priority: read this firstspecifications
High

Section 31 23 19 - Dewatering

PDF, High priority: read this firstsow
High

Section 33 11 00 Basic Pipeline Specifications

PDF, High priority: read this firstspecifications
High

Spec No. 2026-27 - Basic Concrete Masonry Specifications

PDF, High priority: read this firstsow
High

Spec No. 2026-27 - Leon Housing Water Consolidation Project Specifications

PDF, High priority: read this firstspecifications
High

Spec No. 2026-27 – Section 03 23 24 Controlled Low Strength Material

PDF, High priority: read this firstspecifications
High

Spec No. 2026-27 - Section 33 12 16.10 Resilient-Seated Gate Valves

PDF, High priority: read this firstspecifications
High

Spec No. 2026-27 Section 33 12 17 Blowoff Assemblies

PDF, High priority: read this firstspecifications
High

Spec No. 2026-27 TC 31 23 17 Trenching, Excavation, Backfill and Compaction

PDF, High priority: read this firstsow
High

Spec No. 2026-27 TC 32 10 00 - Paving

PDF, High priority: read this firstsow
High

Spec No. 2026-27 TC 33 11 13.00 - Piping Systems and Appurtenances

PDF, High priority: read this firstsow
High

Spec No. 2026-27 TC 33 11 13.10 Ductile Iron Water Pipe (Zinc) and Fittings

PDF, High priority: read this firstspecifications
High

Spec No. 2026-27 TC 33 12 13 Copper Pipe, Tubing, Brass and Bronze Pipe Fittings

PDF, High priority: read this firstspecifications
High

Spec No. 2026-27 TC 33 12 16.20 Butterfly Valves

PDF, High priority: read this firstspecifications
High

Spec No. 2026-27 TC 33 12 16.40 Miscellaneous Valves

PDF, High priority: read this firstspecifications
High

Spec No. 2026-27 TC 33 12 18 - Combination Air/Vacuum Valve Assemblies

PDF, High priority: read this firstspecifications
High

Spec No. 2026-27 TC 33 12 19 Fire Hydrants

PDF, High priority: read this firstspecifications
High

Spec No. 2026-27 TC 33 14 00 Hydrostatic Testing

PDF, High priority: read this firstspecifications
High

TC 09 90 00 Basic Coating and Painting Specification

PDF, High priority: read this firstsow
High

TC 33 11 13.20 PVC Pipeline Specifications

PDF, High priority: read this firstspecifications
High

TC 33 13 00 - Disinfection of Piping

PDF, High priority: read this firstspecifications
High

Spec No. 2026-27 – TC 33 05 23 Jacked Pipe Casing

PDF, Low priorityspecifications
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Coachella Valley Water District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Bid #2026-27 / 3310001-020C: $18

More opportunities from California → Coachella Valley Water District

Same awarding agency

NAICS: 237110
New
SLED
Well Rehabilitation Project FY27, Wells No. 5711-2 And 5727-1
Solicitation # 2026-44
The Coachella Valley Water District is soliciting bids for the Well Rehabilitation Project FY27, focusing on the rehabilitation of Wells No. 5711-2 and 5727-1 in Palm Desert, California. The scope of work includes the removal and inspection of permanent pumps and motors from estimated depths of 340 to 345 feet, mechanical and chemical cleaning, well redevelopment, disinfection, and the installation of new permanent pumps. Additionally, the contractor must perform EMT casing thickness, caliper, and deviation surveys, as well as discrete zone sampling and aquifer testing. All work must be completed within 240 calendar days from the Notice to Proceed. To be considered responsive, bidders must demonstrate significant experience, including the completion of at least four similar projects valued at 300,000 dollars or more within the last five years, and must self-perform at least 30 percent of the work. Required certifications include a valid California contractor's license, CARB fleet compliance, and registration with the Department of Industrial Relations. The successful bidder must provide performance and payment bonds equal to 100 percent of the contract price and All-Risk Installation Floater Insurance. Bids must be submitted electronically via Planet Bids by November 18, 2026, with pricing entered through the platform's line items tab and bid forms uploaded as a single PDF.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 22 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS