Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on February 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lift Station 18 Improvements

Closed
PE-63760-NONST-2026-000000006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
2025 CDBG- No. 25p-y-095-1-6798
Solicitation # 25P-Y-095-1-6798
Solicitation 25P-Y-095-1-6798 is a request for sealed bids from the McIntosh County Board of Commissioners for water system improvements in Georgia. The scope of work includes the construction of approximately 8,956 linear feet of 6-inch C900 Class 150 PVC water main, the installation of seven 6-inch mechanical joint ductile iron gate valves, twelve 3-way fire hydrant assemblies, and two connections to existing water mains. Additionally, the project requires the installation of a new 5,000-gallon hydropneumatic tank, 40 square yards of Class A pavement removal and replacement, and all necessary erosion control and appurtenances. All work must be completed within 60 consecutive calendar days from the date of the notice to proceed. This is a Section 3 Covered Contract under the HUD Act of 1968, and bidders must provide Section 3 documentation prior to the notice of award. The project also mandates compliance with the Build America, Buy America (BABA) Act. Bids must be submitted on the provided proposal forms and accompanied by a bidder's bond for 10 percent of the bid amount. Successful bidders will be required to furnish payment and performance bonds along with insurance certificates. The deadline for submission is 1:00 PM local time on December 1, 2026, at the McIntosh County Commissioners Office in Darien, Georgia.
Mcintosh County Board of Commissioners

POSTED

31 minutes ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The project involves extensive upgrades to the City of Adel's Lift Station #18, a triplex submersible sewage pumping station. The primary goal is to replace aging infrastructure and increase the station's capacity by constructing a new wetwell adjacent to the existing equipment. Key components of the project include the installation of a pour-in-place concrete wetwell and valve pad, three new submersible pumps with guide rails and access hatches, updated station piping, an electrical panel with controls, sanitary sewer manholes, fencing, and a new graded aggregate base site pad. During construction, the existing equipment will maintain lift station operation. Once the new system is operational, the old structures and piping will be abandoned in place per the project plans. The contractor is responsible for making all necessary connections and disconnections between the existing and new systems, with bypass pumping required to tie into the current force main. This solicitation, issued by the City of Adel, Georgia, was posted on February 19, 2026, with a submission deadline of March 27, 2026. The point of contact for the project is Rhonda Rowe, who can be reached via email or phone for further information. The improvements aim to modernize Lift Station #18, ensuring enhanced functionality and reliability for the city's sewage pumping needs.

General Info

Upgrade City of Adel Lift Station #18 with new wetwell, pumps, piping, electrical, and site improvements.

Documents

1

00100 Advertisement for Bids - Lift Station 18 Improvements

PDF, High priority: read this first4 pages · advertisement-for-bids
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Adel
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Adel
Office AddressN/A

Full Description

Show more
This project will include improvements of the City of Adel's Lift Station #18. This station is a three-pump (triplex) submersible sewage pumping station. To replace aging infrastructure and upsize the lift station capacity, a new wetwell complete with pump station components will be installed at the site of the existing pump station next to the existing equipment. The following major components will be installed: pour-in-place concrete wetwell and valve pad, three submersible pumps, guide rails, access hatches, station piping, electrical panel and controls, sanitary sewer manholes, fencing, new GAB site pad. Existing equipment will be relied upon for lift station operation during construction. Following turnover to new equipment, existing structures will be abandoned in place, and pipes will be cut, capped, and abandoned in place where indicated on the plans. Contractor will also make the appropriate connections and disconnections to and from the existing and proposed system. Bypass pumping will be required to make tie-ins to the existing force main.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS