This Solicitation opportunity from Texas was posted on March 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Dallas, through Dallas Water Utilities, is soliciting qualifications for professional engineering services under solicitation 25-504E to improve lift stations and diversion structures. The scope of work encompasses the full project lifecycle, including investigation, preliminary design, development of construction plans and specifications, bid phase services, construction administration, and start-up for necessary modifications, repairs, and replacements. This effort is informed by a technical memorandum assessing 16 lift stations and two diversion structures. The project is managed by Maria Wang, PE, and responses must be submitted electronically via the Bonfire portal by April 10, 2026.
Award decisions will be based on a trade-off analysis to determine the most advantageous bidder, evaluating expertise, capabilities, and approach, alongside a significant emphasis on the DRIVE Policy for Small Business Enterprise participation. A specific SBE participation goal of 34.39 percent has been established, with evaluation points awarded for SBE utilization, local economic impact, and the respondent's engagement score. Selected vendors must adhere to strict insurance requirements, including professional liability and workers compensation, and must disclose any potential conflicts of interest per the Texas Local Government Code. All deliverables are subject to City inspection and acceptance at the designated delivery site in Dallas County, Texas.
General Info
Dallas Water Utilities seeks engineering services for lift station and diversion structure improvements.
DOCX, High priority: read this firstsupporting-documents
HighAI Summary for BEH-FRM-605.SAW SBE Utilization Plan & Commitment to Local Eco Impact: This document is a City of Dallas Business Enterprise Hub (BEH) form used to capture a respondent's Small Business Enterprise (SBE) utilization plan and local economic impact commitments. It includes sections for SBE participation goals, first-time contracting, proposed team make-up, local supply chain usage, and local community impact. The form serves as a scoring tool under the DRIVE Policy and establishes contractual obligations for SBE commitments if the contract is awarded.
DOCX
DOCX, High priority: read this firstpast-performance
HighAI Summary for BEH-FRM-606 SAW Engagement Score & Past Commitment Form: A City of Dallas procurement form used to evaluate a respondent's historical performance regarding subcontractor utilization, mentor-protégé participation, engagement with Dallas-based industry groups, and timely payment practices to subcontractors.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for City of Dallas Contract 25-504E Addendum No. 1 - Lift Stations and Diversion Structures Improvements: Addendum No. 1 dated March 25, 2026, for the Lift Stations and Diversion Structures Improvements project (Contract No. 25-504E). Key updates include extending the submission deadline to April 10, 2026, establishing an SBE participation goal of 34.39%, and providing clarifications on required forms (BEH-FRM-604 and 605 replacing OPS-FRM-640). The document also includes responses to bidder questions and attaches pre-submittal meeting materials and site photographs.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for City of Dallas Contract 25-504E Addendum No. 2: Addendum No. 2 dated April 2, 2026, for Contract No. 25-504E (Lift Stations and Diversion Structures Improvements). This document extends the submission deadline to April 10, 2026, and provides clarifications on SBE utilization, page count restrictions, Bonfire upload procedures, and required forms for the Submission of Qualifications.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for Dallas Water Utilities Consultant Selection Guidelines: Revised February 27, 2026, these guidelines outline the two-step selection process for professional services contracts exceeding $100,000 for Dallas Water Utilities. The document details the evaluation criteria for Statements of Qualifications (SOQs), including specific weightings for expertise (15%), capabilities (20%), approach (35%), and other factors. It provides strict submission requirements, such as a 40-page limit and mandatory use of the Engineering Consultant Screening Questionnaire, noting that non-compliance will result in a non-responsive determination.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for Dallas Water Utilities - Lift Stations and Diversion Structures Improvement RFQ: Request for Qualification (RFQ) issued by Dallas Water Utilities (Contract 25-504E) seeking qualified engineering services for Lift Stations and Diversion Structures Improvement. The document includes the signature page, submission instructions via Bonfire, a required SOQ checklist, and schedules for pre-submittal conferences and site visits. The submission deadline is April 10, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for DWU Lift Stations and Diversion Structures Condition Assessment Technical Memorandum: Final technical memorandum dated January 8, 2024, prepared by Black & Veatch for the City of Dallas Water Utilities Department. The document provides a comprehensive condition assessment of 16 lift stations and 2 diversion structures, including methodology, risk assessments, TCEQ compliance reviews, and recommended rehabilitation costs to inform renewal and replacement projects.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Risk Requirements - Lift Stations Improvements RR260105-DWU-18469: This document outlines the mandatory insurance requirements for engineers performing work on the Lift Stations Improvements project (RR260105-DWU-18469) for the City of Dallas. It specifies required coverages and minimum limits for Workers' Compensation, Business Automobile Liability, Commercial General Liability, and Professional Liability insurance, including mandatory endorsements and notification procedures.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Sample Contract Form Engineering - City of Dallas: This document is a sample contract form for professional engineering services between the City of Dallas and an engineering firm. It outlines the terms of employment, contract administration, scope of engineer's services, payment terms, and ownership of documents. The contract specifies the fixed construction budget, payment limits, and conditions for adjustments in project scope or budget. It also details the responsibilities of both parties, including monthly payment procedures and rights related to default or disputes. The document serves as a template and may vary depending on the actual scope of services for a specific project.
DOCX
DOCX, Low priorityacknowledgement-of-addenda
LowAI Summary for Acknowledgement of Addenda for Dallas Water Utilities Contract: This document is an Acknowledgement of Addenda form for a Dallas Water Utilities contract. It is used by vendors or contractors to initial and confirm receipt of each addendum issued for the contract, numbered 1 through 8. The form includes spaces for the contract number, name of the submitter, and name of the vendor or contractor. It serves as a record of addenda acknowledgment but does not contain solicitation or contract terms.
DOCX
DOCX, Low priorityother
LowAI Summary for BEH-FRM-602.SAW SBE Affidavit: A Small Business Enterprise (SBE) Affidavit form for the City of Dallas. The document outlines the Dallas Regional Inclusive Vendor Enterprise (DRIVE) Policy, including aspirational benchmarks and contract-specific SBE goals. It requires the prime vendor to acknowledge compliance with SBE subcontracting, Commercially Useful Function (CUF) obligations, and monthly compliance auditing reporting.
DOCX
DOCX, Low priorityother
LowAI Summary for BEH-FRM-604 Local Participation & Workforce Impact Form: This document is the BEH-FRM-604 Local Participation & Workforce Impact form used by the City of Dallas. It collects prime vendor information including business name, addresses, and primary contact details. The form requires reporting of total employees company-wide, employees residing in the City of Dallas, and calculates the percentage of local workforce residency. It includes a certification section where an officer certifies the accuracy and completeness of the information provided. The City may verify the data and take actions if false or incomplete information is submitted. The form supports reporting and compliance related to local participation and workforce impact for various procurement actions.
DOCX
DOCX, Low priorityother
LowAI Summary for BEH-FRM-607 SBE Good Faith Effort Documentation Form: A standardized form used by the City of Dallas to document a prime vendor's Good Faith Efforts (GFE) to meet Small Business Enterprise (SBE) goals. It includes sections for prime attestations, subcontracting opportunity segmentation, outreach logs, quote evaluations, and certifications of compliance with the DRIVE policy.
DOCX
DOCX, Low priorityother
LowAI Summary for BEH-FRM-609.SAW Prime Self Performance Declaration: A template form used by Small Business Enterprise (SBE) prime vendors to declare self-performed work. It requires the identification of NAICS codes, work packages, and descriptions of work to verify Commercially Useful Function (CUF) compliance and certification under the DRIVE Policy.
DOCX
DOCX, Low prioritysbe-intent-form
LowAI Summary for City of Dallas BEH SBE Subcontractor Intent Form: A standard form from the City of Dallas Business Enterprise Hub (BEH) used by prime vendors to document their intent to subcontract specific work elements to a certified Small Business Enterprise (SBE). The form captures certification details, NAICS codes, contract amounts, and participation percentages to ensure compliance with SBE goals.
PDF
PDF, Low prioritypolicy
LowAI Summary for City of Dallas DRIVE Policy for Small Business Enterprise Participation: The Developing Regional & Inclusive Vendor Enterprises (DRIVE) Policy by the City of Dallas aims to promote economic opportunities for small and local businesses by expanding Small Business Enterprise (SBE) participation in city contracts over $100,000. The policy outlines standards for certification, monitoring, reporting, and capacity-building initiatives to support SBEs. It applies to contracts for goods, construction, architecture & engineering, professional services, and general services, excluding certain exemptions. The policy's purpose is to foster local economic growth, fair competition, and transparency in procurement, with objectives including promoting inclusion, compliance monitoring, business development, and nondiscriminatory practices. The City Manager and Business Enterprise Hub administer the program, ensuring adherence to the policy and maintaining the SBE Directory.
LowAI Summary for Conflict of Interest Questionnaire for Local Government Vendor: This document is a Conflict of Interest Questionnaire filed by a vendor doing business with a local governmental entity, in accordance with Chapter 176 of the Texas Local Government Code. It is used to disclose any business or family relationships with local government officers that might present a conflict of interest, including employment, business relationships, or gifts exceeding specified values. The questionnaire must be filed within seven business days after the vendor becomes aware of facts requiring disclosure. The document includes legal references and instructions for compliance with the law, ensuring transparency in vendor-government relationships.
To provide engineering services required for the investigation/study, preliminary design, design, development of construction plans and specifications, bid phase services, construction administration and start-up of items needing modifications, repairs and/or replacements throughout the Lift Stations and Diversion Structures as described in the Pre-liminary Scope of Work.
Project Manager: Maria Wang, PE Senior Engineer
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.