Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Lightning Protection System Installation (Alternate Work)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the installation of a lightning protection system under Alternate No. 1, encompassing all essential components including air terminals, down conductors, grounding elements, and bonding provisions, all implemented in strict compliance with NFPA 780 and UL standards to ensure structural safety and regulatory adherence. The work is classified as a subcontract under NAICS code 238210 and is being managed by the Ohio Facilities Construction Commission under the Ohio agency designation, with performance expected to meet statewide infrastructure protection requirements. The solicitation was posted on July 31, 2026, with a firm response deadline of August 4, 2026, at 6:00 PM, limiting the window for interested parties to submit proposals. While specific location details, point of contact, or set-aside information are not provided, the contract is open for bidding through the BidExpress platform and requires full technical and logistical readiness to meet code-compliant installation standards without deviation. All parties must ensure capability to execute the scope with certified materials, qualified personnel, and documented compliance verification.

General Info

Installation of NFPA 780 and UL-compliant lightning protection system under Ohio state contract, bid due August 4, 2026.

Agency

Ohio Facilities Construction CommissionView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

OH, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio Facilities Construction Commission
ContactsNo contacts available
OfficeN/A
Organization / Agency
Ohio Facilities Construction Commission
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of a lightning protection system under Alternate No. 1, including air terminals, down conductors, grounding, and bonding per NFPA 780 and UL standards.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Variable Frequency Drives (VFD) Replacement Phase 3 (DBB)The Port of Seattle will replace 125 aging Robicon variable frequency drives (VFDs) with new equipment as part of Phase 3 of its VFD Replacement initiative. This effort aims to upgrade outdated infrastructure to ensure system reliability and improve operational efficiency across aviation facilities and infrastructure. The new VFDs will be fully integrated with the Port’s Direct Digital Controller (DDC) system to enable real-time energy usage monitoring, output control readings, and efficiency tracking, enhancing the Port’s ability to manage power consumption and maintain optimal performance. The scope includes all necessary wiring, testing, commissioning, and installation of associated equipment required to deliver a fully functional and synchronized system. The work falls under NAICS code 238210 and is managed by the Aviation Facilities & Infrastructure division, with technical oversight from Project Manager Sharon Miick and primary point of contact Yanet Maldonado. Although the solicitation number and set-aside details are not specified, the forecast was posted on July 31, 2026, signaling upcoming procurement activities. The project is critical for modernizing the Port’s electrical infrastructure and supporting long-term sustainability goals through precise control and monitoring of motor-driven systems. All work must be performed on-site at the Port’s facilities, with full accountability for system integration, performance validation, and operational readiness upon completion.
Aviation Facilities & Infrastructure

POSTED

24 minutes ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract requires the provision of design, permitting, and construction services to install 50 high-resolution cameras across 43 sites in the Bagwell and North Cargo Operations areas of the Port of Seattle. The primary objective is to enhance security and enforcement capabilities by replacing outdated systems with improved coverage, specifically targeting main terminal drive lanes and entrances previously unmonitored, with the goal of supporting forensic investigations and adherence to port movement rules. In the Bagwell area, the new cameras will shift focus from conveyor systems and security doors to critical transit corridors, while the North Cargo operations will benefit from flexible, user-controlled Pan Tilt Zoom units that provide broad surface area monitoring and dynamic viewing capabilities to address operational gaps. All work must be completed in accordance with specified technical and operational standards to ensure seamless integration with existing security infrastructure. The project is managed by the Aviation Project Management Group under the Port of Seattle, with primary point of contact Angela Peterson and Project Manager Randa Williams available for coordination. The North American Industry Classification System code 238210 identifies this as a specialty trade contracting effort focused on electrical and communication system installation. Although the solicitation has not yet been formally issued, the forecasted posting date is July 31, 2026, indicating this is a forward-looking opportunity for qualified contractors to prepare proposals. The place of performance is within the Port of Seattle’s operational boundaries, and all contractors must be prepared to navigate port-specific logistics, security protocols, and environmental constraints during installation and commissioning.
Aviation Project Management Group

POSTED

24 minutes ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Electrical Unit Price Portwide 2026_1 and _2This contract encompasses a broad range of electrical services to be performed across multiple Port of Seattle facilities including Seattle-Tacoma International Airport, maritime properties, and surrounding areas. The work includes but is not limited to the installation of raceways, wiring, medium voltage cabling, electrical boxes, transformers, temporary power and lighting systems, grounding, and associated testing, all in full compliance with applicable codes and regulations. The Contractor is responsible for providing all labor, tools, equipment, materials, and incidentals required to complete tasks as directed through Work Authorizations issued by the Port. Labor must be delivered according to the specified classifications outlined in the Schedule of Unit Prices, ensuring consistent pricing and accountability. The Port of Seattle anticipates a high volume of small-scale electrical projects over the coming year and plans to award two separate contracts under this solicitation to ensure sufficient capacity and rapid response times. The goal is to maintain operational continuity and meet dynamic project demands by leveraging two qualified contractors. The contract is identified under the NAICS code 238210 and is issued through Port Construction Services, with primary coordination handled by Heather Bowden and Lesley Miles. All work must be performed at designated Port-wide locations, and contractors are expected to adhere strictly to the terms and pricing structure detailed in the bid documents.
Port Construction Services

POSTED

24 minutes ago

DEADLINE

N/A
View Details
NAICS: 238210
New
Federal
Electrical Integration and Control System Interface for Chiller RepairThe contract requires the electrical integration of a repaired chiller into the facility’s existing power, control, and communication systems. This includes all necessary wiring, configuration of the programmable logic controller interface, and verification of interoperability with the building management system to ensure seamless operation and monitoring. The work must be performed at the facility located in Omaha, Nebraska, with a zip code of 68105, and must meet all technical and safety standards for commercial building systems. The scope focuses exclusively on post-repair system alignment, ensuring the chiller functions correctly within the broader infrastructure without requiring mechanical repairs or component replacements. This is a subcontract under the NAICS code 238210, which classifies it as electrical contracting work, issued by the Department of Veterans Affairs through the Network Contract Office 23. The solicitation was posted on August 1, 2026, with a firm response deadline of August 7, 2026, at 3:00 PM. There is no set-aside designation or additional eligibility criteria specified, and the contract is open to qualified subcontractors capable of delivering verified electrical and control system integration services. All work must be completed in alignment with facility requirements, and successful bidders will be expected to demonstrate prior experience with similar chiller integration projects involving PLCs and building management systems.
Network Contract Office 23 (36C263)

POSTED

1 day ago

DEADLINE

in 5 days
View Details

More opportunities from Ohio Facilities Construction Commission

Same awarding agency