Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

Lights & Electric Repairs

Active
W50S9B26Q0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This solicitation, issued by the Virginia Air National Guard's 192d Wing/MSC at Joint-Base Langley-Eustis, VA, seeks quotes for electrical repairs and the replacement of existing fluorescent and incandescent lighting with LED fixtures at the 200th Combat Weather Flight facility in Sandston, VA. The contract falls under NAICS code 238210 for Electrical Contractors and is set aside entirely for small businesses, with an estimated magnitude of less than $25,000. The work includes installing new circuits and receptacles, repairing exterior floodlights, and replacing various light fixtures as detailed in the provided Statement of Work. All work must comply with industry standards, applicable building codes, and safety regulations, including UFC, IBC, and NFPA-70, and any deviations must be pre-approved. The contract's period of performance is 60 calendar days from the Notice to Proceed, covering all phases from procurement to installation. Interested contractors must submit electronic quotes by July 9, 2026, including a technical narrative, past performance information with references, and a detailed price schedule. A site visit is scheduled for June 25, 2026, which all prospective offerors are encouraged to attend after registering by June 24. Wage determinations per the Davis-Bacon Act apply, and clauses addressing site conditions are included to ensure informed bidding. The evaluation of past performance emphasizes recent, relevant projects involving similar electrical or lighting retrofit work. Protests related to the solicitation will be handled through the National Guard Agency Protest Program, designed to offer a timely dispute resolution process. The solicitation package includes several attachments detailing scopes of work, specifications, wage determinations, and necessary forms to guide submissions.

General Info

Virginia Air National Guard solicits small business quotes for LED lighting retrofit under $25,000, 60-day performance.

Agency

Department Of Defense → W7N5 Uspfo Activity Vaang 192View Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Sandston, VA, 23150, USA

Set-Aside

SBA

Documents

(9)

Solicitation W50S9B16Q0004 Past Performance Reference Questionnaire

DOCXpast-performance

Davis-Bacon Wage Determination VA20260155 for Henrico County, VA

PDFwage-determination

Electrical Scope Notes for Outlet and Fixture Installation

PDFsow

Lighting Scope for Training Room and Offices

PDFsow

Att+5.2+Emergency+Lighting+Layout.pdf

PDF

SOW Replace Lights Electrical Repairs Project CVVM 26-2005

DOCXsow

Attachment 5.4 – Electrical Specifications

DOCXspecifications

Solicitation W50S9B-26-Q-0004 Replace Lights Electrical Repair

DOCXrfp

Attachment 1 Provisions and Clauses

PDFclauses

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7N5 Uspfo Activity Vaang 192
Contacts2 people available
OfficeLANGLEY AFB, VA, 23665-2207, USA
Organization / Agency
Department Of Defense → W7N5 Uspfo Activity Vaang 192
View Agency Profile
Office AddressLANGLEY AFB, VA, 23665-2207, USA

Full Description

Show more

1. Description of Solicitation


This is a Combined Synopsis/Solicitation for commercial products or commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) Part 12, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; offers are being requested and a separate written solicitation will not be issued.


2. Solicitation Details


Solicitation Number


W50S9B-26-Q-0004


Solicitation Date


15 June 2026


Issued By


Virginia Air National Guard


192d Wing/MSC


165 Sweeney Blvd, Bldg. 768


Joint-Base Langley-Eustis, VA 23665


Government Point of Contact (POC)


Contracting Officer: MSgt Orlando Loaiza


Email: orlando.loaiza.1@us.af.mil / 192msg.msc.contracting@us.af.mil


Phone: 757-225-1794



Key Dates & Response Times


Site Visit: 25 June 2026 at 10:00 AM EST


Questions Due: 30 June 2026, 2:00 PM EST


Quotes Due: 9 July 2026, 1:00 PM EST



3. Classification and Set-Aside Information


NAICS Code


238210 – Electrical Contractors and Other Wiring Installation Contractors


Size Standard


$19.0 Million


Product Service Code (PSC)


Z2JZ – Repair or Alteration of Miscellaneous Buildings



Disclosure of Magnitude


Less than $25,000



Set-Aside


100% total small business set-aside


4. Description of Requirement


The purpose of this project is to make electrical repairs and replace existing fluorescent/incandescent lights with LEDs at the 200th Combat Weather Flight facility.


The work described in the Statement of Work (SOW) includes the furnishing of all materials, equipment, and labor to perform the work. All work shall conform to industry standards, Unified Facilities Code (UFC), International Building Code (IBC), and NFPA-70 requirements. Any deviation from the manufacturer’s installation requirements must be approved prior to performing work on-site.


Availability of Funds Statement:


Funds are not presently available for this requirement. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.


5. Line Items


CLIN


Description


QTY


UI


Unit Price


Extended Price


0001


BASE – Electrical Work: Install two (2) new circuits and provide four (4) new receptacles. Repair one (1) exterior flood light. Remove and replace ten (10) 2'x4' light fixtures. All work as specified in the attached Statement of Work.


1


Job


$________


$_________


OPTION


0002


OPTION 1 – Remove and Replace Lights: Remove and replace ten (10) 2'x4' and eleven (11) 2'x2' recessed troffer light fixtures. Remove and replace fourteen (14) 1'x2' pendant light fixtures, five (5) recessed can lights, and two (2) wall-mounted pendant lights. All work as specified in the attached Statement of Work.


1


Job


$________


$_________


6. Period of Performance


The Government’s Period of Performance is sixty (60) calendar days from the date of the Notice to Proceed (NTP). This timeframe must be inclusive of all project phases, including but not limited to material procurement, submittal approval, and installation.


7. Pre-Quotation Conference & Site Visit


Date and Time: 25 June 2026 at 10:00 AM EST
Location: 200th Combat Weather Flight, 6025 Beulah Rd, Sandston, VA 23150


Registration Requirements


All prospective quoters that intend to attend the site visit must register no later than 24 June 2026 at 1:00 PM EST. Please email the following attendee details to the POC listed in Section 2.4:


  • Full First Name, Middle Initial (use “NMI” if none), and Last Name.
  • Names must match the attendee’s REAL-ID-compliant Government-issued identification.

Important Notes


  • The clauses at FAR 52.236-2 (Differing Site Conditions) and 52.236-3 (Site Investigations and Conditions Affecting the Work) will be included in any contract awarded. Quoters are strongly encouraged to inspect the site.
  • Information provided during this conference or site visit shall not modify the terms of the solicitation; changes are only valid if formal amendments are issued in writing.

8. Wage Determination


The Construction Wage Rate Requirements (formerly known as the Davis-Bacon Wage Rates) are applicable to this project. The current wage determination(s) at the time of contract award will be formally incorporated into the final contract.


9. Quotation Submission Instructions


Quotes must be submitted electronically to the Point of Contact listed in Section 2. Quoters must include pricing for all line items, a completed copy of provisions/clauses, and the following required submittal packages:


  1. Technical Narrative: A written proposal explaining how the Contractor intends to meet the SOW requirements. This submission is limited to 10 single-sided pages.
  2. Past Performance & Experience: A list of comparable projects completed during the past three (3) years for both government and private industry. Must include:

  • Project type, dollar value, contract number, and location.
  • Proof of successful performance.
  • Customer Point of Contact (POC) details.
  • Distribution of Past Performance Questionnaires (Attachment 4): Quoters shall distribute the Past Performance Questionnaire (PPQ) Package to the points of contact for the comparable projects listed in their experience narrative. To ensure an objective evaluation, completed questionnaires must be sent directly from the reference/client to the Contracting Officer (MSgt Orlando Loaiza at orlando.loaiza.1@us.af.mil) via email. All completed PPQs must be received no later than the solicitation closing date (9 July 2026, 1:00 PM EST). Questionnaires submitted directly by the offeror will not be accepted.

  1. Price Schedule: Standard pricing schedule using the Line Items table provided in Section 5, or an alternative detailed pricing structure.

10. Past Performance Evaluation Method


The Government will evaluate the relevancy and quality of the offeror’s past performance utilizing the completed Past Performance Questionnaires (Attachment 4) received directly from references, as well as information obtained from other independent sources such as the Contractor Performance Assessment Reporting System (CPARS).


Recency is defined as a contract or project reference that was active or completed within three (3) years prior to the original issuance date of this solicitation; references for projects completed more than three years ago will not be evaluated.


If a reference is determined to be recent, the Government will then evaluate its Relevancy based on the similarity of the past contract effort to the current requirement in terms of scope, magnitude of effort, and complexity. To be considered relevant, a reference should involve commercial facility electrical installations, repairs, or LED lighting retrofits of a similar magnitude (Less than $25,000) inside a government, military, or commercial facility. General facility maintenance or construction projects that included minor electrical or lighting sub-components will be considered somewhat relevant, while projects with no electrical, lighting, or facility maintenance scope will be deemed not relevant and will not be evaluated.


11. Provisions and Clauses


Provisions and clauses are referenced within the solicitation’s attachment. The full text of federal provisions and clauses may be accessed electronically at https://www.acquisition.gov.


12. National Guard Agency Protest Program


NG Agency Protest Program is intended to encourage interested parties to seek resolution of their concerns with the National Guard (NG) as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office (GAO) or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods as if filed at the GAO. The NG protest decision goal is to resolve protests within 35 calendar days from filing. An agency protest may be filed with either the Contracting Officer or the NG Agency’s Protest Decision Authority, but not both, in accordance with NG protest procedures. To be timely, the protests must be filed with the periods specified in FAR 33.103. To file a protest under the NG Agency Protest Program, the protest must request resolution under that program and be sent to the address below:


National Guard Bureau


Office of the Director of Acquisitions/ Head of Contracting Activity


ATTN: NGB-AQ-O


111 S. George Mason Dr.


Arlington, VA 22204


Email: ng.ncr.ngb-arng.mbx.ngb-task-order-ombudsman@mail.mil


All other agency-level protests should be sent to the Contracting Officer for resolution at the address in the solicitation. See FAR clause 52.233-2.


NG Public-facing, general Protest information is found at: https://www.nationalguard.mil/Leadership/Joint-Staff/Special-Staff/Director-of-Acquisitions/


Directorate of Acquisitions information for the contracting enterprise is found at https://gko.portal.ng.mil/ngb/STAFF/D01/D01/OI/Protests%20and%20Complaints/Forms/AllItems.aspx


13. List of Attachments


  • Attachment 1 - Solicitation Provisions and Clauses
  • Attachment 2 - Davis-Bacon Act WD # VA20260155, Mod 1 dated 18 May 2026
  • Attachment 3 - Past Performance Questionnaire Package
  • Attachment 4 - Statement of Work Replace Lights REV01 18 MAY 26
  • Attachment 5.1 - Lighting Scope
  • Attachment 5.2- Emergency Lighting Layout
  • Attachment 5.3 - Electrical Scope
  • Attachment 5.4 - Electrical Specifications

Similar Contracts