The work to be performed under this contract includes the furnishing of all labor, materials, tools and equipment for the Linda Manor and Old Florin Town Septic to Sewer Conversion (Project) located in the Rio Linda and Florin areas of Sacramento County, CA (location map shown in Orawings). The Project includes construction of the following items: Construction of approximately 9,483 linear feet of sanitary sewer gravity main Vitrified Clay Pipe (VCP) by open-cut (which includes 4,777 linear feet of 8-inch pipe for residential parcels and 418 linear feet of 8-inch pipe for the non-residential parcels in the Old Florin Town community, and 4,288 linear feet of 8-inch pipe for the residential parcels in the Linda Manor community). Construction of approximately 55 linear feet of 21-inch RCP Class III or Vitrified Clay Jacking Pipe (VCP-J) casing by bore and jack for the Old Florin Town community. Construction of approximately 94 linear feet of 16-inch SOR 14 C900 Polyvinyl Chloride (PVC) and 6-inch (PVC) Air Jumper by open cut for the Linda Manor community. Construction of approximately 11,315 linear feet of 4-inch and 6-inch High Oensity Polyethylene (HOPE) service laterals by open cut and/or Horizontal Oirectional Orill (HOO) (which includes 6,838 linear feet of 4-inch to 6-inch HOPE pipe for residential parcels and 1,197 linear feet of 6-inch HOPE pipe for non-residential parcels in the Old Florin Town community and 4,477 linear feet of 4-inch HOPE pipe for the residential parcels in the Linda Manor community). Connecting approximately 107 service laterals (which includes 51 service laterals in the Linda Manor community and 52 service laterals in the residential Old Florin Town community and 4 service laterals in the non-residential Old Florin Town community) to existing septic plumbing on private property, abandoning approximately 107 existing septic systems (which includes 51 septic systems in the Linda Manor community and 52 septic tanks in the residential Old Florin Town community and 4 septic systems in the non- residential Old Florin Town community) by removing cover, pumping dry, puncturing bottom, and filling void. Oisconnect septic plumbing and leach lines and abandon in place. Connection to SacSewer's Upper North West Interceptor (UNWI) in the Linda Manor community. Sewer bypass system during construction and removal and site restoration following tie- ins in the Old Florin Town community. Removal, replacement, and installation of sewer manholes and necessary tie-ins. For the Linda Manor community (all for residential) this includes: 1 connection to an existing interceptor (listed above), installation of 15 precast 48" manholes, and installation of 1 polymer (or approved equal) 60" manhole. For the Old Florin Town community this includes: installation of 15 precast 48" manholes (residential), installation of 3 precast 48" manholes (non-residential), installation of 1 precast 60" manhole (residential), installation of 1 precast 48" doghouse manhole (non-residential), removal of 1 existing flusher branch with installation of 1 precast 48" manhole (residential) and removal of 1 existing manhole with installation of 1 precast 48" manhole (residential). Pavement restoration, restoration of landscaping, and other surface improvements. All Work associated with this contract must include, but is not limited to, mobilization/demobilization, dewatering of excavations, sheeting, shoring, and bracing of excavation, traffic control, erosion and sediment control, cleaning, debris removal and disposal, verification of pipe lengths and diameters, installation of PVC and VCP by open cut, installation of HOPE by open cut and horizontal directional drilling, installation of casing by boring and jacking, permitting, site restoration, and additional items or details that are required by the Contract Oocuments to be performed, placed, constructed or installed. Work also includes sewer flow control for pipeline work including bypass pumping as shown on the Contract Orawings or directed by the Resident Engineer. Additional items or details not mentioned above but required by these specifications and drawings must be performed, placed, constructed, or installed in accordance with the Contract Oocuments. The Contractor must make an independent determination of all project requirements and include the associated costs in their bid. All work will be completed as outlined in provided permit requirements. Performance of work for connection to the Upper Northwest Interceptor in Elkhorn Boulevard and the bore and jack under Florin Creek will be limited to the period between May 1 and October 15 during the construction season. The successful bidder will achieve substantial completion of the Work in Linda Manor by September 30, 2025 and in Old Florin Town by November 30, 2025. CONTRACTOR LICENSE REQUIRED: Class A - General Engineering ESTIMATED CONSTRUCTION COST: $8,852,000 Note: There is a mandatory Prebid Conference Meeting.