Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Linda Manor and Old Florin Town Septic to Sewer Conversion

Closed
Bid #6035State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562119
New
Federal
P100--Facility Scrap and Recycling Services — VA Northeast Ohio Healthcare System – Louis Stokes VA Medical Center
Solicitation # 36C25027Q0075
The Department of Veterans Affairs, Network Contracting Office 10, is soliciting quotes for facility scrap and recycling services for the Louis Stokes VA Medical Center and its associated offsite facilities in Cleveland, Ohio. This small business set-aside under NAICS 562119 involves the on-call removal, recycling, and disposal of scrap materials, including metals, wood, plastics, and ceramics. The contractor must pick up materials within 48 hours of notification, with emergent needs addressed within 24 hours. The contract is structured with five ordering periods and a performance end date of October 14, 2031, with a possible six-month extension. Award will be based on a comparative evaluation of administrative compliance, technical approach, price, and past performance. Technical evaluations focus on the methodology for pickup and disposal, communication and ordering plans, quality control, and the ability to remit recycling proceeds to the Agent Cashier within a strict 14-day deadline. Submissions must include specific administrative documents, such as a Certificate of Insurance and a Limitations on Subcontracting Compliance Worksheet, with pricing submitted exclusively in Microsoft Excel format. The contractor must also adhere to VHA Directives for waste-stream reporting and comply with VA cybersecurity and HIPAA privacy regulations.
250-NETWORK Contract Office 10 (36C250)

POSTED

about 5 hours ago

DEADLINE

in 25 days

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Oct 25, 2024 to Jan 28, 2025. NAICS code changed from 238910 to 562119. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → SacSewer
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → SacSewer
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The work to be performed under this contract includes the furnishing of all labor, materials, tools and equipment for the Linda Manor and Old Florin Town Septic to Sewer Conversion (Project) located in the Rio Linda and Florin areas of Sacramento County, CA (location map shown in Orawings). The Project includes construction of the following items: Construction of approximately 9,483 linear feet of sanitary sewer gravity main Vitrified Clay Pipe (VCP) by open-cut (which includes 4,777 linear feet of 8-inch pipe for residential parcels and 418 linear feet of 8-inch pipe for the non-residential parcels in the Old Florin Town community, and 4,288 linear feet of 8-inch pipe for the residential parcels in the Linda Manor community). Construction of approximately 55 linear feet of 21-inch RCP Class III or Vitrified Clay Jacking Pipe (VCP-J) casing by bore and jack for the Old Florin Town community. Construction of approximately 94 linear feet of 16-inch SOR 14 C900 Polyvinyl Chloride (PVC) and 6-inch (PVC) Air Jumper by open cut for the Linda Manor community. Construction of approximately 11,315 linear feet of 4-inch and 6-inch High Oensity Polyethylene (HOPE) service laterals by open cut and/or Horizontal Oirectional Orill (HOO) (which includes 6,838 linear feet of 4-inch to 6-inch HOPE pipe for residential parcels and 1,197 linear feet of 6-inch HOPE pipe for non-residential parcels in the Old Florin Town community and 4,477 linear feet of 4-inch HOPE pipe for the residential parcels in the Linda Manor community). Connecting approximately 107 service laterals (which includes 51 service laterals in the Linda Manor community and 52 service laterals in the residential Old Florin Town community and 4 service laterals in the non-residential Old Florin Town community) to existing septic plumbing on private property, abandoning approximately 107 existing septic systems (which includes 51 septic systems in the Linda Manor community and 52 septic tanks in the residential Old Florin Town community and 4 septic systems in the non- residential Old Florin Town community) by removing cover, pumping dry, puncturing bottom, and filling void. Oisconnect septic plumbing and leach lines and abandon in place. Connection to SacSewer's Upper North West Interceptor (UNWI) in the Linda Manor community. Sewer bypass system during construction and removal and site restoration following tie- ins in the Old Florin Town community. Removal, replacement, and installation of sewer manholes and necessary tie-ins. For the Linda Manor community (all for residential) this includes: 1 connection to an existing interceptor (listed above), installation of 15 precast 48" manholes, and installation of 1 polymer (or approved equal) 60" manhole. For the Old Florin Town community this includes: installation of 15 precast 48" manholes (residential), installation of 3 precast 48" manholes (non-residential), installation of 1 precast 60" manhole (residential), installation of 1 precast 48" doghouse manhole (non-residential), removal of 1 existing flusher branch with installation of 1 precast 48" manhole (residential) and removal of 1 existing manhole with installation of 1 precast 48" manhole (residential). Pavement restoration, restoration of landscaping, and other surface improvements. All Work associated with this contract must include, but is not limited to, mobilization/demobilization, dewatering of excavations, sheeting, shoring, and bracing of excavation, traffic control, erosion and sediment control, cleaning, debris removal and disposal, verification of pipe lengths and diameters, installation of PVC and VCP by open cut, installation of HOPE by open cut and horizontal directional drilling, installation of casing by boring and jacking, permitting, site restoration, and additional items or details that are required by the Contract Oocuments to be performed, placed, constructed or installed. Work also includes sewer flow control for pipeline work including bypass pumping as shown on the Contract Orawings or directed by the Resident Engineer. Additional items or details not mentioned above but required by these specifications and drawings must be performed, placed, constructed, or installed in accordance with the Contract Oocuments. The Contractor must make an independent determination of all project requirements and include the associated costs in their bid. All work will be completed as outlined in provided permit requirements. Performance of work for connection to the Upper Northwest Interceptor in Elkhorn Boulevard and the bore and jack under Florin Creek will be limited to the period between May 1 and October 15 during the construction season. The successful bidder will achieve substantial completion of the Work in Linda Manor by September 30, 2025 and in Old Florin Town by November 30, 2025. CONTRACTOR LICENSE REQUIRED: Class A - General Engineering ESTIMATED CONSTRUCTION COST: $8,852,000 Note: There is a mandatory Prebid Conference Meeting.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS