This Solicitation opportunity from California was posted on October 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Lindhurst High Scoreboard Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Marysville Joint Unified School District is soliciting bids for project number 8361 (solicitation 27-1016) to install two owner-furnished electronic baseball scoreboards with wireless controllers at Lindhurst High School in Olivehurst, California. The scope of work includes comprehensive structural tasks such as excavation for foundations, construction of reinforced concrete footings, and the installation of structural steel support posts and anchor rods. Electrical requirements encompass the installation of new conduit, wiring, grounding, and disconnects, as well as the setup of the scoreboard controller and communication wiring. The contractor is also responsible for site restoration and providing a one-year guarantee against defects. The project is scheduled to begin on November 19, 2026, with an anticipated completion date of March 19, 2027. This is a competitive bid for a stipulated sum contract, requiring a bid bond of 10% of the total bid price. Award evaluation is based on responsiveness and the ability of the apparent low bidder to meet District requirements, including mandatory attendance at the pre-bid conference and site visit. Successful bidders must provide 100% performance and payment bonds and adhere to California prevailing wage laws. Compliance with Title 24 of the California Code of Regulations, including the Electrical, Building, and Fire codes, is mandatory. Additionally, the contractor must certify compliance with various regulations, including the Iran Contracting Act, Drug-Free Workplace Act, and a 3% participation goal for Disabled Veteran Business Enterprises. Payment will be processed monthly using AIA Documents G702 and G703, with the second payment contingent upon the Architect's acceptance of all submittals and shop drawings.
General Info
Place of Performance
Set-Aside
Documents
3AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- FRSMP277009/JLM-Lighting Phase 2Open now, due in 9 days
- Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 12 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
